How to develop a spare parts management system for engineering? Project support and supply
RFID Knowledge

How to develop a spare parts management system for engineering? Project support and supply

PublishedShanghai Zejie Smart Technology Co., Ltd.

The spare parts system addresses the information break points between demand, procurement, acceptance, inventory and receipt; it should be developed by combing materials with items and equipment before clarifying responsibilities, processes and replenishment rules.

When the project starts, make it clear what you need.

The system is only “on demand, to regulate and keep” and implementation still encounters problems with inconsistent names of the same material, incomplete specifications, and indistinguishable between projects. Project packages should be organized from equipment lists, drawings, technical documents and transport requirements, at least recording material names, specifications, quantities, applicable equipment, location of installation, time required and source files.

For example, the valve cannot be registered only as a “valve”, but should also indicate the applicable parameters such as caliber, pressure level, connection mode, material etc.; vulnerable items should be marked with the corresponding equipment type and use location. Parameters that have not yet been identified should be marked to be confirmed and the person responsible designated to avoid bringing incomplete information directly into the price and procurement chain.

Control version and approval when needs change

The system should specify who will propose the changes, who will check the technical parameters, who will approve the budget and how the old version will be invalidated. The purchase order, receipt and on-site access record should relate to the same project number and material code, reducing the mixing of the same name.

Shanghai-based Select Technology, Inc., while combing the project’s packages, proposes to separate “demand submission—technical reconciliation—budget approval—procurement implementation” from one another. For urgent needs, a simplified approval path can be set, but it should be added for reasons of number, approval and actual use, avoiding long-term circumvention of the system on the grounds of “on-site emergency”.

Once the material is delivered, we need to be able to match the receipt and storage.

When the warehouse is received, the name, model, quantity, appearance and accompanying information shall be checked according to the purchase order; material requiring inspection or technical confirmation shall be individually identified before status is confirmed, avoiding direct distribution. The entry record shall contain a material code, batch or serial number (where applicable), storage location, date of receipt and acceptance results. For materials with warranty periods, storage conditions or anti-tidal requirements, the custody requirement and frequency of inspection are specified.

Record items, equipment, quantities, uses, recipients and dates; rechecks when you return the library. The inventory counts are not consistent, and the differences and the results of the processing should be registered, rather than directly modifying the inventory. This way, the project team can trace the material, and the warehouse can also judge whether the missing item is not purchased, the receipt or inspection is not recorded, or the unregistered amount has been received.

After project closes, adjust the provision rules to usage

At the end of the project delivery or phase, the remaining material should be checked, the order for non-attendance and the record of on-site changes, the identification of which are transferred to public inventory, which are reserved for project exclusive use, and which are returned or disposed of in accordance with the approval process.

The replenishment rules can be developed by material risk: spare parts that are difficult to replace after the shutdown of critical equipment may have a minimum stock and recharge trigger point; generics can be used in conjunction with project plans to reduce long-term storage. Specific thresholds should be determined on the basis of historical access, procurement cycle, storage conditions and stoppage impact, and be jointly confirmed by equipment, projects, procurement and warehousing positions. Once the system is put down, a project is selected for trial, checklist checked, approval approved, receipt and receipt records matched, and forms and processes revised.