How is the spare parts management system developed? Content and implementation elements
RFID Knowledge

How is the spare parts management system developed? Content and implementation elements

PublishedShanghai Zejie Smart Technology Co., Ltd.

The spare parts management system does not simply specify who will receive the material, but also answers which items are to be prepared, how much they are to be prepared, who maintains them, when they are replenished and how the account is reconciled.

At the heart of the system is the conversion of spare parts requirements into inventory rules

The common misconception is that the more spare parts are prepared, the less equipment is at risk of being shut down. The actual management needs to balance the supply cycle between the effects of failure and stock occupancy: the shortage of critical spare parts can affect production, and long-term unused spare parts may take up funds, even when they are not properly adapted or secured.

The system should specify the scope of application, such as which production equipment is included, which areas and warehouses are maintained, which items are spare parts for the preparation, and which items are daily consumables. Name of material, specification model, applicable equipment, unit of measure and location of storage should be used in a single calibre to avoid re-suppling the same item because it is called different.

When Shanghai-based Technology Ltd. combes these management processes, it considers "material basics, inventory control, access to records, responsible positions" as an interrelated element. For companies, the system is effective, not only if the terms are complete but also if the people on the ground can find the material, do business and keep a record of it.

The floor and the top limit of the inventory must be justified and adjusted to change.

Each spare part is provided with a secure inventory, minimum and maximum stock. The minimum stock is used to provide a reminder for the replenishment, and the maximum stock is used to control the backlog. The set can be based on historical consumption, procurement or maintenance cycles, equipment importance, replacements and supply stability; material without reliable data can be recorded first, and then reviewed in a periodic manner, not subject to feeling long-term fixation.

For example, a plant with multiple units of the same equipment can record the monthly receipt of a particular type of bearing, the procurement cycle and the impact of the failure. If the purchase cycle is long and missing items will cause critical equipment to stop, an increase in the safe inventory can be assessed; if there are generic alternatives for materials, the suitability should be verified and adjusted. The amount of stock in the sample should be calculated by the enterprise's own consumption and supply data, and no other scene could be directly replicated.

The system should also provide for the frequency of adjustments. Additional equipment, process changes, change in supply cycle or permanent non-acquirement of spare parts should be reviewed; storage and equipment management positions should be matched with a basis for matching needs, with the parameters updated after authorization, and the date and justification for the adjustment retained.

Write procurement, acceptance, receipt and return of funds as a retroactive process

The body of the system should at least state the duties and responsibilities of the post, business steps, approval requirements, recording fields and anomalies. Demanders should indicate the equipment and uses to be used, and the procurement process should be carried out in accordance with the enterprise's authorization; check names, specifications, quantities and appearances on arrival and confirm suitability by use or maintenance position, as necessary.

The effects of execution are recorded, counted and double-checked.

The performance check can be based on three types of questions: whether the book number matches the physical amount, whether the access goes back to equipment or maintenance matters, and whether inventory parameters still meet current needs. The enterprise can schedule the count times by material value, importance and management risk, and record the reasons for the difference, responsible position and the outcome of the processing; when differences are discovered, they should not be simply modified, but also identify omissions, misdirections, damage or duplicates of codes.

Once the system is released, one of the types of equipment or a warehouse can be selected for trial, and material builders can be observed, approvals made, replenishments and inventories are smooth, and then revised forms and duties are based on records. Sustainable tracking of missing items is done, overstocking and stagnation, discrepancies in accounts, emergency purchases etc., but specific indicators and target values should be set in conjunction with enterprise baseline setting to avoid covering up real problems in order to meet standards.

When developing the spare parts management system, each inventory rule should be based on a documented flow of items and every type of anomaly. It is recommended that material lists and job processes begin with an enforceable version of the base version, followed by regular review of access, procurement and inventory data.