How is the plant spare parts management system developed? Production scenes fit?
RFID Knowledge

How is the plant spare parts management system developed? Production scenes fit?

PublishedShanghai Zejie Smart Technology Co., Ltd.

The key to developing a plant spare parts management system is not to keep stock as low as possible, nor to have all spare parts available in one copy, but rather to separate management according to the impact of the shutdown, procurement cycle and replacement difficulty. Classification and approval rules can be established before continuous correction is made with access, inventory and replenishment records; equipment-critical, long-term spare parts should be managed in a different manner than generic items.

Cost comparison: low stock occupancy or lower risk of loss of production

The management of spare parts accounts for the loss of inventory funds and missing items at the same time. General bolts, standard bearings, etc., are easy to purchase, alternative, low-level stocks can be set up; specialized control modules, such as special seals, need to be evaluated if the lead time is long and the impact of the shutdown is high.

The policy can require staff to record each spare part's procurement lead time, unit price, minimum pack size, annual usage, and associated equipment. Estimate the reorder point as average daily usage × procurement lead time + safety stock. For example, a part used at an average of two per month, with a lead time of about two months and safety stock of one unit, could initially have a reorder point of five units. Adjust it using actual issues and delivery times. This is only an example; base formal thresholds on factory data.

When Shanghai Selecting Tech Ltd. is combing such systems, it places the impact of a downtime on missing items in the same assessment form as the use of inventory funds, so that only unit prices are avoided.

Effect comparison: uniform process or set rules by type of spare parts

The common repository, the acquisition and inventory process can help to trace back, but the replenishment, approval and custody rules are suitable for classification. It is possible to classify spare parts by criticality, difficulty in purchasing and frequency of consumption, into key long-cycles, commonly used items, low-value generics and deactivated pendings. Class names can be determined according to plant custom, and the key is to have clear responsibility and treatment for each category.

The system should also be clear: Equipment units confirm technical specifications and replacement relationships, warehouses are responsible for the receipt and delivery of shipping and identification, procurement staff maintain the due date and supply information, and use the service to request it as required.

Applicable scene comparison: Cyclical production lines versus multi-species small batch plants

The impact of the stoppage of a continuous production line is such that the system should prioritize the identification of parts associated with single point failure: whether the failure of a spare part will cause the entire line to be cut off, if there are any sideways or substitutes, and how long it takes to resume procurement. A corresponding list of equipment can be established for this type of spare parts, and the storage position, graph numbers, specifications and applicable machine types can be registered together, reducing the risk of mischarging during maintenance.

Many varieties, small-volume plants have faster changes in their equipment and materials than in their applications and versions. The additional equipment is then created in tandem with the equipment's retrofitting or decommissioning, and updates the list when it is discontinued; for special items, records the drawing version or critical size to prevent old models from being replenished. Shanghai will look into whether spare parts and equipment billings are matched in the system combo, because only stock quantities are available without information on the equipment that is applied.

Common pits: books are loaded, but not used on site

When you land, you can select a line or type of equipment to be tested: take an inventory of existing spare parts, complete the code and apply the information, classify them according to the impact of the stopover and the procurement cycle, set approvals, fill in, fill in and make up for the late-loading rules, use three months or so for access, and check whether missing items and inventory differences are appropriate. The value of the system is not more than one clause, but it is available on site, access is documented, and replenishment is justified.