Where is the equipment spare parts management process? Key node resolution
Before dawn one day last winter, the spindle motor at an auto parts plant burned out. The warehouse had no matching unit, and the fastest it could get a replacement was five days. Four and a half days of downtime and the rush-order premium together cost nearly CNY 200,000.
Spare parts management is not as simple as it sounds. Identifying demand, setting stock policies, maintaining records, and counting and reviewing stock are all critical. If any step is weak, the process will fail when it matters most. A plant with sound procedures can cut equipment downtime due to failures by more than half and reduce the capital tied up in spare parts by 20%–40%.
Step one: starting with the history of failure, and finding out what's in place.
Many factories come up to discuss "how much to prepare," and the first step should be to figure out what to do.
I want you to go over the maintenance records of the past year.
When we took on a spare-parts project at a food packaging plant, the first thing we did was export 12 months of maintenance orders and sort them by equipment, failure location, and replacement frequency. The results made the problem clear. The seal-and-cut knife assembly on one packer had been replaced seven times in six months, yet the warehouse stocked just one set.
Maintenance records are the most direct basis. Which parts of a device are the easiest to break, how long is it to do so, how long is the spare parts procurement cycle, and the team leaders actually have these data in their minds, just sort of scattered paper files or Excel forms, and nobody's done it systematically.
The parts are divided into ABC III by importance
The following is the usual breakdown:
- Category A (key spare parts): those that directly affect production decommissioning, long procurement cycles and high prices, such as the main axle electric power, server drive, PLC module
- Category B (critical spare parts): may affect product quality or production efficiency, but short-term shortages of goods can lead to temporary solutions such as general electric power, sensors
- Category C (general spare parts)Standardised, low price, available everywhere, like bearings, seals, normal screws
Once the classification is completed, resources become clear — A-focused safeguards, B-moderated reserves and C-based procurement.
Step two: Stocking strategy. Secured stock can't be shot in the head.
After the classification is clear, the next step is how much each product is. The easiest question here is "Empirical Headshots": Teacher says "Three" and three, and the result is either piled up or not at a critical time.
What about the minimum stock of critical spare parts?
For critical category A spare parts, it is proposed that a simple formula be used to determine the level of safe stock:
Security inventory = average daily consumption x procurement cycle x security factor
For example, an imported hydraulic valve was replaced 1.2 times a year on average according to past records. It has a 45-day procurement lead time and a safety factor of 1.5 to allow for occasional shipping delays. The resulting safety stock is one unit.
If you can reduce purchasing lead time to 30 days, you may be able to carry no safety stock and buy as needed. That depends on a reliable supplier relationship and the ability to expedite emergency orders. When Shanghai Zejie Technology reviews spare parts with precision manufacturers, we treat purchasing lead time as a key metric. Many companies have excess spares because they do not know their actual lead time and end up carrying twice what they need.
Distinction between generic and long-lived items
It is recommended that a rolling reserve be made on the basis of consumption from one quarter to six months, depending on the amount used.
Some components, such as large gear reducers and dedicated controller modules, cost a lot and last a long time, with replacement perhaps only every five or six years. Do not stock them in volume. One reducer costs tens of thousands of yuan, and holding three can tie up 300,000 yuan, too much for a small or midsize business. Supplier consignment or regional shared stock can cover these spares.
Step three: Get in the vault. The bill is a lifeline.
Better stock-taking strategies, and the failure to keep up with the bill, are useless. We've seen tens of thousands of pieces of spare parts in factories' warehouses, and when it really comes to use, we can't find a match model, we can't find a corresponding stock, and we have to buy them on an emergency basis.
A qualified desk account contains at least these fields
- Spare parts name, specifications type (must be consistent with BOM list of equipment)
- Correlation equipment number, location of installation
- Repository time, supplier, batch number
- Current stock, minimum security stock
- Time out, use of equipment, user
- Procurement cycle, most recent request for quotations
The plant is advised to go directly to EAM (Empretec asset management) or the spare parts management module of ERP.
First up, first up, and periodically rotate.
Rubber, seals, oil seals, spare parts with a shelf life, must be pre-empted. Even if you put in an extra six months of useless O-ring, the performance may have declined. We saw a chemical plant's sealing stock, and we were able to unsettle a batch of it for two years, and then it was loaded into the equipment, and it was leaking oil, and the loss went far beyond the money of the ring itself.
For spare parts that do not have a shelf life but are long-term non-mobile, it is recommended to "take-in registration and re-entry" every once or two years to check appearances and performances and to update the data on the desktop.
Step four: Quarterly count and annual double-checking, making the data more accurate
Spare parts management is not a one-time combo.
Quarterly inventory: Consistency of accounts
The physical inventory is performed quarterly, with emphasis on checking whether the actual number of spare parts in category A is consistent with the billing.
Annual Dirt: Adjustment Policy
The year's failure records, access to the database and procurement costs are aggregated at the end of each year.
- Spare parts fund occupancy rate (parts inventory amount)
- Stopping of the waiting hours (time-out due to spare parts issues)
- Spare parts turnover days (average stock amount monthly average value x 30)
- Number of emergency purchases (unplanned percentage of urgent orders)
These changes in data provide a direct indication of whether spare parts management has changed or not. If the waiting period for stopovers has not decreased for two consecutive quarters, it will be necessary to reassess the gaps in coverage or security inventory of category A spare parts.
The process is running smoothly. The benefits speak for themselves.
The return on spare parts management is straightforward. Recall the auto parts factory from the opening example. After four and a half days of downtime, it overhauled the entire spare parts process. Over a year, it cut capital tied up in spare parts by nearly 30% while reducing failure-related downtime by more than half. The clearest change was from seven or eight emergency purchases per year to one or two, all placed in advance as planned orders.
For most small and medium-sized manufacturing enterprises, the process does not require a million-million-dollar MES system, but the key is to position several core nodes: trouble data accumulate, inventories are well classified, billing fields are complete, regular inventory and reset. If you can keep these four things up for one year, the effect will come out.