How is the fixed asset management process system designed? Key nodes and approval rules
What core modules should be included in the fixed asset management process system?
A system of available fixed asset management processes, usually consisting of six core modules: Asset Cards and Master Data, Life Cycle Process Engine, approval workflows, depreciation and account processing, mobile operations, report and monitor boards. Designed to consider the six pieces as a whole, rather than being separate -- such as changing the original value of assets in the approval stream, which must be recalculated simultaneously, or the depreciation module should be unconnected. In doing this, Shanghai-based Cheeky Way Technologies usually clears the boundaries of the six modules with clients, then draws flow charts, so that it does not have full functionality at the start, and the data is not broken until it is online.
How do assets go from being recorded to being scrapped and how do they end up in a life cycle?
The entire life cycle of the asset can be broken down into seven key nodes: a request for procurement, a receipt and inspection register, a build-up card entry, a transfer, maintenance, depreciation, and disposal. Each node must clearly enter, output, responsible person, and trigger the conditions at the next point.
A specific example is: a medium logistics company that stores, employees submit a request for the purchase of a forklift, and after approval, the asset manager enters the purchase order number in the system, the supplier, the expected arrival date. Upon receipt and inspection, scan the asset code on the device, automatically remove the pre-receipt information, check the recipient model, quantity, look, confirm "take through" the correct post-receipt card, system automatic generation of the asset card, hand-printing, and change of status from "building" to "use." Every maintenance of the forklift, change of location, change of duty, return to this card until it is written off.
The key to process design is clarity of the status machine. Each state can only be modified by a specific event, and it cannot be manually changed by the user, otherwise data will be confused.
How should critical approval nodes be designed?
It is recommended that five to seven critical approval nodes be established in the system:
- Procurement requests are processed: by the amount of the sum, a unit of more than $50,000 requires double-signing from the head of department + asset-regime management, and over $200,000 is added to the deputy chief of division.
- Receiving and Inspection Registration Approval: The use of departmental Receiving and Inspection Officers + Asset Managers will sign for equipment exceeding $100,000 requires receipt and inspection reports from technical departments.
- Transfer approval: a tripartite meeting between the transfer of the unit, the transfer of the unit and the asset-regime management to identify the recipient and location.
- Maintenance approval: Single maintenance fees of less than $10,000 are approved by the head of the user department, $10,000 to $50,000 by the asset-regime management, and more than $50,000 is spent on a dedicated procurement process.
- End-of-life disposal approval: Technical validation Asset Management Review Financial Department Audit and Approval, and a public auction or competitive process for large amounts of disposal.
For example, when a request for maintenance is rejected, the request is automatically returned to the applicant for revision and then resubmitted for entry into the original approval stream instead of re-entry from the first Approving Officer.
How can the power of approval be allocated?
The distribution of competencies is governed by three principles: the hierarchy of amounts, segregation of duties and system plaque.
Value tiers are straightforward. As noted earlier, common thresholds are 50,000, 200,000, and 500,000 yuan per unit. Adjust them for company size and internal control requirements.
The segregation of duties means that the applicant and the approving officer cannot be the same person, the user department and custodian can not be the head of the same department, and the asset manager and account keeper are also to be separated. This is a basic requirement for internal control and an obligatory point for audit.
The system leaves marks on every approval action that records the operator, operation time, operation IP and attachment, the approval opinion cannot be empty, the subsequent modification is subject to a special approval process and cannot directly overwhelm the original record.
What about the primary data and data standards in the system?
The main data confusion is the most common pit on the fixed assets system. It is recommended that the following primary data standards be established at the beginning of the implementation:
- Asset classification code: using the GB/T 14885-2018 Fixed Assets Classification and Code, managed by three categories: large, medium and small, to avoid a single set of subsidiaries.
- Asset card fields: The required entries include the name of the asset, code, classification, specification model, supplier, date of purchase, original value, expected useful life, depreciation method, place of deposit, department, custodian, additional item expanded according to industry needs, such as medical equipment with a registration number and production equipment with power parameters.
- Unit, currency, exchange rate: If cross-border procurement or subsidiary multicurrency accounting is involved, the exchange rate taking rules, whether at the beginning of the month or at the date of the transaction, need to be consolidated in the system.
- Barcode/RFID code: Code 128 or QR code is recommended, which contains asset classification, flow number, location check to facilitate the clean-up of the code count.
What about moving the end and swipe the plate?
The most labour-intensive part of fixed asset management, the traditional way to check it on site with printed tabs, and it's inefficient and prone to errors. Now the mainstream approach is to match asset managers with PDA (industrial handheld terminals) or to use a mobile phone, pop, to automatically remove an asset card after a coder, to record physical status: normal, in use, idle, damaged, to be scrapped.
Upon the end of the inventory, the system automatically generates a surplus or loss statement, the excess assets go through the new recording process, the lost assets go through the write-off process. For assets that cannot be found in physical terms, enter "verified" status, set a one-month verification period, and automatically upgrades that are not processed over time to asset management head follow up.
The RFID label is suitable for high-value, large-volume, concentrated scenarios, such as a factory with thousands of production devices, attached to the device with a pass-through reader, and automatic login into and out of the warehouse. But the RFID tag itself is not cheap, and it varies from $1 to $10 per label, and whether it is worth input depending on the size of the asset and the frequency of the count.
How does the financial and general ledger system fit in?
The fixed-asset system and the financial system are not a substitute relationship, but an upstream/downstream relationship.
Three things are clear: the rules for the production of vouchers, whether one by one asset card or a batch; the depreciation method, straight-line method, double-count reduction, common methods such as the sum of years ' and numbers, which are supported; the time point for closing, the end-month number of asset systems that stop operations, the number of times to be issued to finance, and the adjustments made after the financial closure, which are fixed in the system calendar.
One other point that is easily overlooked is the change in original value, depreciation adjustment, preparation for impairment, which, once performed, triggers the corresponding accounting document rather than simply changing card information.
What pits are easy to step on when you're on?
In our experience, several common pits are worth avoiding earlier:
I'm looking for a big, big one.Many companies are first doing fixed asset systems, preferring to put in all sectors of individualized demand, and then double the work schedule, and eventually none of them is satisfied. The proposal is to run through core processes (procurement, acceptance, depreciation, end-of-life), and extend the second period to mobile inventory counting, RFID, and other systems.
The master data is unmanaged.The system is online with tens of thousands of asset cards, but it is not clear who will be responsible for the follow-up data maintenance and then after six months.
The training and system did not keep up.The system is better, and the staff will not use it for nothing. You have to organize at least two rounds of training before you go online, and the manual is written by character, not a generic manual. The accompanying Fixed Asset Management System is revised simultaneously to make the system process into an institutional provision.
The count stopped once.The workings of fixed asset management are normally not subject to a single year-end surprise. It is recommended that the balance be linked at least to a quarterly, annual and comprehensive basis, so that the actual differences can be processed in a timely manner.
Summary: Several key judgements in the design of the fixed asset management process system
Looking back, the design of a good fixed asset management process system, which is not functional enough at all, and three things: first, whether the process nodes are clear and can be used to tie up an asset's entire life cycle with a status machine; secondly, whether approval rules are practical, both to control risks and not to trouble business; and thirdly, whether data master data are harmonized, classifying, coding, standard fields from the start, and avoiding patching.
If such projects are being evaluated or initiated, it is suggested that a situational mapping take two to three weeks: the number of assets available, how many departments are distributed, what tools are currently being managed, what is the monthly count accuracy rate, and what is often asked about extracurricular trials. Answering these questions clearly, then choosing or self-studying, will lead to much higher success rates.