How does the fixed assets register management system work? Additional asset slotting process
RFID Knowledge

How does the fixed assets register management system work? Additional asset slotting process

PublishedShanghai Zejie Smart Technology Co., Ltd.

The actual time taken for a single card to be held in the new asset set-up of the fixed assets register system is usually between 15 and 30 minutes. The process can be broken down into "collect-entry-coding-check-archiving" five steps, each without a subsequent count and depreciation card shell.

Element 1: Clear and then recorded four types of basic information

Many newcomers open the system form as soon as they get up, and half of them find that a field cannot be accessed and then look back.

When Shanghai-style is implemented for clients, asset managers are usually asked to run the field with a blank template, complete the missing fields and enter the system record, which is much more efficient than direct entry.

Point 2: Financial fields are the easiest to step on, focusing on three

The original value, depreciation method, and useful life are not filled in correctly.

Point 3: The asset code is subject to the "Big Class + Detail + Sector + Order" rule

The code uniquely identifies each asset record. Use a four-part scheme, such as 04-03-0201-0008 for machinery, production equipment, Workshop 2, Asset 8. The code contains classification and location information, so a scan tells you what the asset is and where it belongs.

The code has several hard requirements:

The system usually automatically generates sequence numbers, but large and small categories need to be pre-maintained in the system. In a real-life exercise, first you comb into an asset sorting tree into a document, then Treasury, Equipment, and Administration confirm it and then enter it into the system, so that later adjustments are much less costly.

Element 4: Attachments and images must be uploaded simultaneously

A standard asset file must contain at least the following:

The clarity of the image is as follows: a photo with a symmetry and date of exit, a label photograph with an asset code. Both will be checked at the time of future inventory, and the result is no. The file format is recommended to be PDF or PNG, with a single one not exceeding 5MB.

Point 5: The review stream configuration needs to be aligned with the approving authority

The most easily ignored is the approval node before submission. The new asset is typically submitted by the asset manager to the head of the user department for confirmation that the Treasury Department reviews the management review and approval. The process node is within four layers, and more than four levels slows down the builder.

Some real-life details:

Point 6: Don't forget to do these three things after the audit.

The audit was not completed as a build-up, and the following three things were missing.

Common pit-stamping and disposal advice

In practice, the most significant questions of feedback were:

The whole process runs down, and the actual time-consuming control of a single asset builder is 15 to 30 minutes; the pre-format template and data can be compressed within 10 minutes. It's still important that the five-step border line between "Search-Input-Code-Audit-Archive" be clearly defined, each one being put in place, so that the system works.