How does the fixed assets procurement management system work?
RFID Knowledge

How does the fixed assets procurement management system work?

PublishedShanghai Zejie Smart Technology Co., Ltd.

When I went back to a factory that was used for storage equipment in the second half of last year, the administrator turned over a stack of receipts and said: "A batch of forklifts arrived last month, two of which are not found on the financial books." -- The problem is not wrong, it's the process that's sinking into the system. The central role of the fixed asset procurement management system is to put "application, approval, procurement, acceptance, recording" in a traceable chain, so that every piece of equipment coming in can be traced back to someone by the date, to the amount.

From the point of view of first-line users, there are three things that the system has to address: clear writing of applications, smooth approvals and no error in checking income.

Application chain: Turn "mixed claims" into "workable documents."

Most of the procurement process cases are mined in the first step. The common situation is that applicants submit a line: "Cyctops are broken, please purchase" -- to the approver, without models, without users, without budget back, only to call back and ask again, which is the inevitable consequence of inefficiency.

A qualified application form should contain at least these fields:

The more detailed the field is, the less it will be possible to complete the subsequent approval and acceptance chain.

Common pedal: mix "procurement request" with "purchase order".

The application stage is still at the selection stage, and no suppliers should be targeted. A good idea is to split "demand requests" into "procurement execution" in two lists -- the former with only what it wants, the latter with specific orders. The two sheets are linked by application numbers, which are clear and facilitate later statistics on which departments apply most frequently.

Approval flow: show each level what to look at

The design of the approval stream is not as complex as it is, but as it is.

Approval thresholds should not be arbitrary. Refer to the company's authorization matrix. For example, below 10,000 yuan may require departmental approval, 10,000–50,000 yuan approval from the responsible department, and above 50,000 yuan approval from the executive in charge. That also lets frontline staff determine where to submit requests.

The most afraid of "opening the list and blackening it."

A well-designed application should be automatically brought out: the historical procurement frequency of the applicant's department, current budget balances, existing stock of similar equipment, and availability of idle equipment. This information does not require manual checking by the approving officer, and the system should be presented directly. When Shanghai-based Siegger technology does this system for manufacturing firms, it usually goes through fields, nodes, rules, and avoids getting online to find that the approving person would not open it.

Procurement execution: orders, contracts, payment rhythm to be locked together

This step is usually the result of three files in the system: purchase orders, contracts (when required for amounts or items), payment plans. Key information on each must be consistent - supplier, description, quantity, unit price, rate of tax, date of delivery, and any modification must be synchronized, otherwise there will be a problem with the reconciliation phase.

The point of connection where problems can easily arise

One is that the contract is unseparated, and the financial payment is not made in the knowledge of which contract it is; the other is that the order contains a date for delivery, which is not written in the contract, and when the goods are received there is no basis. It is recommended to enforce "a first order in the system, then a contract, the change of the order must trigger a change of contract," and block this entry from the mechanism.

Arrivals and acceptance: The most easily "floated" link in the process

Many companies accept "show it and sign it." It takes six months to find out that the equipment is not properly equipped or has missing parts, which is difficult to trace.

  1. Physical check: Prototype, specification, quantity in line with order
  2. Quality testing: Appearance, packaging, random information, complete certification, functional testing or third-party testing, if necessary
  3. Signing and receiving recordsReceiving and inspection, user, arrival date, location of storage, one registration with photo retention

If the receipt and inspection issue is not identified, the "According order" should be generated directly in the system, linked to the original purchase order, with the procurement officer being responsible for re-issuing, refunding or withholding payments from the supplier.

Recording, consolidation, slotting: to give "name, place, owner"

After acceptance is accepted and approved, the next step is to build an asset card. A full asset card includes at least: asset number (system-generated automatically, sole company), name of asset, specification model, supplier, purchase amount, date of entry, use department, user, place of storage, depreciation policy, expected useful life, residual value rate.

The code of numbers suggests harmonization - it is common to "class code + year + flow number" such as "SB-2024-0037" for asset 37 of the 2024 equipment class. Once this number is set, all subsequent sweeps, inventories, queries are based on it, and no change rules are made in the intermediate route.

Poster and Store Location

Once the asset card is installed, you need to label it -- with an asset number, name, QR code. Location information is also registered in the system: Workshop equipment is entered into the workspace, office computers are registered into the workspace. Many companies have difficulty counting, the root cause is long-term space, and only "impressive" when they count.

Receivable from the end of life: "The second half of the life of the asset card."

The entry is not over, but the beginning of asset management.

A forklift can last five to eight years from application to end of life. The system is useful, and it works, depending on whether the second half of the period is closed. The first applications, approvals, procurement, acceptances are just a foundation, and then these details are where the real value of asset management is released.

Back to the factory that started -- they moved the whole process on line, just "No paper for reduction," and saved the executive two or three days of review work per month. The system itself is not complicated, the key is to think about fields, nodes, rules before landing; otherwise it's just a spreadsheet, and none of the problems with the process can be solved.