How is the spare parts management system developed for recovery?
RFID Knowledge

How is the spare parts management system developed for recovery?

PublishedShanghai Zejie Smart Technology Co., Ltd.

The core of the spare parts management system, which is to be repaired, is to clarify “which equipment requires spare parts, how much they are prepared, where they are placed, who can access them and when they will be returned.” The system should cover needs assessment, classification quotas, storage maintenance, emergency response, backup and segregation of duties, and clear key timelines, approval authority and log sheets to quickly identify available spare parts in case of failure.

What should be the elements of a spare parts management system for retrofitting?

The system can be prepared by "Scope, responsibilities, catalogues and quotas, procurement and acceptance, storage and maintenance, emergency collection, replenishment and retrofitting". The scope of application should specify the type of equipment, regional and management; responsibility for identifying equipment, warehousing, purchasing and using the respective items of the team, and waiting with each other to avoid malfunction.

The spare parts catalogue recommends recording the name and number of the equipment, the name and chart number or specification of the spare parts, the fitting equipment, the location of storage, the quantity of stock, the minimum inventory, the procurement period, the requirements for quality or rechecking, the replacements restrictions and supply risks. Spare parts that are related to safety, environmental protection or critical production functions should be stated as non-replaceable without technical confirmation.

Which spare parts need to be included in emergency stock?

If you can use the impact of a failure, the probability of failure, the procurement cycle, the level of interoperability and the assessment of storage costs. The shutdown can affect safety or cause a significant disruption in production, the procurement cycle is long, and parts that are difficult to process on site should be prioritized for inclusion; local procurement is easy, generalistic and the failure has limited impact, and conventional inventory or fast-track procurement methods may be used.

The quota may be approved on a line-by-line basis with the `Key Equipment List + Consumption Record + Resupply Cycle', and it is not appropriate to set up only the historical amount of machinery. For low-frequency but highly costly spare parts, the minimum retention or backup equipment option can be specified; for sealed items with a warranty period, lubricant material, etc., there should be a rotation and expiration check requirement at the same time. Inventory levels should be reviewed after equipment retrofits, frequency changes or changes in supply cycles.

How can spare parts be collected and recovered during emergency repairs?

The system should specify two paths for routine and emergency access. The application for regular or maintenance work orders must be approved, the bank must be released; in an emergency, the authorized person may approve the application first, then complete the work order within a specified time frame, fail-safe, number of applications and use to go to record.

After the recovery, the warehouse must verify the specifications of spare parts, their state and fittings, record the time of use, the quantity, the recipient and the work order number. Upon completion of the recovery, unused spare parts should be returned to the warehouse in a timely manner and reviewed; if used or stock is below the quota, the recharge should be activated.

How can we ensure that spare parts are in serviceable condition?

The space should be clearly marked, the spare parts are specified, batch and status area management; material that is required to protect against tide, dust, rust or humidity is checked and recorded according to its storage conditions. Periodical counts must check not only the number of nuclears but also labels, packaging, corrosion, deformation, validity and equipment adaptation information. Key spare parts can be included in the focus-check list, marking immediately after detection or decommissioning, avoiding mistakes during recovery.

When you're doing this, Shanghai Select Tech will match the inventory with the fail-down sheet, and take a lead record so that managers can track changes in the status of spare parts from storage to use. The enterprise can also use spreadsheets or existing management systems to implement records, focusing on field harmonization, updating in a timely manner, and keeping an inventory and basis for change.

What indicators are to be examined after the system is implemented?

The indicators should be targeted in relation to the criticality of equipment and it is not appropriate to pursue only stock compression; if there are repeated shortfalls in certain categories of spare parts, the flat amounts should be re-checked, the procurement cycle and supply risk.

After the system is released, a key set of devices is selected for trial running, and the catalogue is checked, the library position and emergency clearance are implemented in real recovery, and the quota and process are revised based on the failure reset. The system is easier to execute and check by writing "accountee, trigger condition, processing time, record voucher" into specific terms.