What are the elements of the spare parts management system? Job responsibilities and processes
The Department of Spare Parts and Components Management system typically includes organizational and job-related duties, parts classification and coding, needs plans, procurement acceptances, warehousing, access issuance, inventory and write-off, account records and unusual processing.
What should be included in the spare parts management system of the Department of Spare Parts?
The system can be organized as “planned, procured, accepted and accepted, stored, received, used, counted, disposed of” and clearly defined the scope of application, approval authority and record-keeping forms.
- Classification and coding:Set a code for each spare part that is easily identifiable by equipment, use, specifications or level of importance and maintain basic information such as name, model, unit and applicable equipment.
- Inventory control:Sets the conditions for safe stock and replenishment.
- Procurement and acceptance:Check the name, specifications, quantity and accompanying information at the time of receipt and inspection.
- Custody and access:Clearing up the identification of storage points, storage conditions, rules for first-in or first-out and priority issuances in terms of life, as well as the process of receipt, approval, inventory registration and refund.
- Inventory and disposal:Provide for the frequency of inventory counts, review of discrepancies, approval of account adjustments and a process for assessment and write-off of inactive, damaged, obsolete spare parts.
- Records and appraisals:Maintaining records of procurement, receipt and inspection, warehousing, out-of-stock, refunds, inventory and write-off; indicators such as the true conformity rate, number of missing items, stock turnover and inactive stocks can be tracked and their calibration should be indicated in the system.
What are the duties of the spare parts department?
The job set may be merged or split by size of the enterprise, but each business must have a clear head and reviewer.
- Heads of department:Review of inventory strategies and procurement plans, coordination of production, maintenance, procurement and finance positions, approval of anomalies within the delegated authority, and regular review of stocks and missing items.
- Planning or procurement management functions:To consolidate maintenance and production needs, reconcile existing stocks with those in transit, propose replenishment plans; track delivery deadlines and record extensions, cancellations or changes in specifications.
- Warehouse safe:Review links may be established for high-value or critical spare parts.
- Equipment or maintenance request:Description of spare parts usage, equipment number, specifications and time required; actual usage recorded after acquisition and unused spare parts returned to stock as required.
- Financial or inventory accounting posts:Checking access documents with inventory records in accordance with the Enterprise Accounting Rules, reviewing inventory discrepancies and end-of-life approvals.
What are the processes for the spare parts from application to use?
- Demand development:The emergency needs should also indicate the possible impact of the shutdown or maintenance.
- Check and approve inventories:The planned workspaces will be used to check the number of existing, pre-encumbered and in-transit cases and to determine whether procurement is required; approvals will be completed on a delegated basis and duplication of procurement will be avoided.
- Procurement and acceptance:The purchase duty follows up with the delivery period, and the warehouse checks the information on the goods as ordered and accepted.
- Entry, custody and issuance:The user receives the number, quantity, batch or validity period and place of deposit on the approved application form, the warehouse checks the information and exits the inventory records.
- Use feedback and archiving:The maintenance or use of the post to record the movement and surplus of spare parts; no material is used for the return of the storage.
How can the system be implemented, not just in a document?
The system requirements are applied to forms and routine inspections: the corresponding spare parts code for each access warehouse document is assigned to the operator; approval authority corresponds to the duties of the post; the reasons for discrepancies are recorded when inventory counts are detected, results reviewed and processors processed. Key spare parts can be individually identified for stock alerts and requisition reviews, needs for long-outstanding spare parts are regularly assessed and stock resources avoided.
Shanghai Select Technologies Ltd. recommends that the system be implemented with a common type of spare parts application, a library, access and inventory process, and that the list and unusual processing requirements be fully filled by the job. The effectiveness of the system depends ultimately on whether responsibility is fulfilled, records are retroactive, and inventory changes are reflected in a timely manner.

Ms. Lei
Mr. Pang