What are the elements of the spare parts management approach? Responsibility and process resolution
RFID Knowledge

What are the elements of the spare parts management approach? Responsibility and process resolution

PublishedShanghai Zejie Smart Technology Co., Ltd.

The spare parts management approach usually requires six things: scope of management, job responsibilities, requirements and procurement, revenue pool, access and refund, inventory and write-off.

Element 1: Clear regulatory scope and classification rules

At the beginning of the approach, state which items are managed, such as spare parts for maintenance, consumables, tools or specialized components, and clearly define what is not included and how they are managed. The classification is easy to purchase, store and measure, by equipment, use, specification or degree of importance. For easily confused material, uniform name, specifications and unit of measurement, avoid re-segregation of the same item.

Each spare part shall have a base file, at least recording material code, name, specification, appropriate equipment, unit of measure, location and custody requirements. Portables, key items and general use are identified separately; for items with warranty periods, tide or static requirements, storage conditions shall be entered into the archives and warehouse operating requirements.

Point 2: Putting responsibility to work

The method should clearly use the department to make the demand, specify the purpose and provide feedback on its use; equipment or maintenance positions to verify suitability and determine maintenance needs; procurement of procurement posts for approval and follow-up delivery; warehouse to check receipt and inspection, custody, issuance and inventory records; and financial or management positions to reconcile the account with the system.

When Shanghai Selecting Tech Ltd. combes such rules, it matches the duties of the post to the document node: for example, access records cannot only write names of material, but also relate to the recipient department, use, equipment or worksheets, number and operator. This allows for a record-checking of reasons when there are differences in inventory.

Point 3: Provide for the request for needs, approval and procurement process

The request should state the name of the material, the specification, the quantity, the purpose, the date of need and the results of the inventory verification. The warehouse or manager should check the existing stock; the inventory should be processed as part of the access process when available; the procurement approval may be made if there is a shortage. The authorization authority can be set at the amount, type of material or level of urgency, rules should be specified in the scheme, and temporary oral decisions should not replace official records.

For critical spare parts, a secure inventory can be set up in conjunction with the importance of equipment, the procurement cycle and historical consumption, i.e. the minimum reserve that is retained to respond to waiting for replenishment or fluctuations in demand. The basis of calculation is recorded at the time of setting and reviewed periodically; changes in requirements, timely adjustments after re-engineering or supply cycles change, and avoiding long periods of idle stock.

Point 4: Harmonization of revenue bank, custody and recovery requirements

When the goods arrive, check their names, specifications, quantities and appearances on a purchase or deposit list; if there is a quality document or test requirement, check them in accordance with internal acceptance rules. If the receipt or inspection does not match, separate and record the discrepancies, which are then processed according to process, and not directly include the available inventory. The quantity registered in time after the eligible material is entered into the warehouse, the batch or serial number, the place of storage and the date of entry into the vault, will facilitate search and traceability.

Verify the request and approval information at the time of receipt, and register it in terms of the actual amount issued; after maintenance has been completed, spare parts that are not used and that meet the conditions for safekeeping are received and returned to stock in accordance with the process of repossession.

Element 5: Maintenance of accuracy of stockpiles through inventory, early warning and end-of-life

The method should provide for the frequency of the inventory, the processing of discrepancies and the approval requirements. If a count is found to be inconsistent, review the receipt and inspection records, the refund records and the storage position, then adjust them in accordance with the authority, and keep the reasons for the discrepancy and the processing records. For items that are not used for long periods, equipment has been decommissioned or technical specifications have been changed, and periodically assess whether or not to continue to reserve.

The end-of-life application should state the state of the material, cause and quantity of scrap, update inventory records after clearance by authorized personnel; and deal with repairable or recyclable materials separately in accordance with enterprise rules. You can first select a warehouse or type of critical spare parts to be tested, check applications, receive goods, issue, repossess them, revise forms and authority. The core of the management approach is not to add formalities, but to justify each stock change, make it responsible, traceable.