What are the elements of the acceptance and inspection management system for spare parts?
The core of the system for receiving and inspection of spare parts is to spell out the responsibilities, criteria, and recording of "arrival-test-entry-archiving" in four stages. A land-depositing system usually consists of five blocks: acceptance organization and duties, acceptance standards, acceptance process, unconforming processing, file processing and continuous improvement.
Point 1: First, make sure that the receiving and inspection organization and duties are established.
Receiving and inspection is not a matter for the warehouse, but it is important to clarify the division of roles between at least three categories:
- Procurement party: Check contracts, purchase orders, technical agreements to confirm that the goods are in line with the procurement requirements.
- Technical or quality formula: test specifications, materials, performances against technical documents and produce a test report as necessary.
- Warehousing: Inventory, check overpacking, register in storage.
When it comes to imported items, special equipment or high-value sophisticated parts, it is recommended that you join the legal profession or a third party monitoring role.
Point 2: Write the acceptance standard in order to do so
The more vague the standard, the easier it is to get over. A good one must cover at least these:
- Name, specification type, manufacturer, out-of-plant number, fully corresponding to the purchase order.
- Appearance: Good packaging, rusty and clear marking readable.
- Quantity: The end number error is allowed to be specified by package, set and measured by weight (e.g. ± 0.5 per cent).
- Quality documentation: Certificate of eligibility, report of the inspection at the plant, material, import documents, etc.
- If necessary, sampled for substantive tests such as size measurements, hardness testing, commissioning, etc.
We've had a problem with the acceptance of spare parts: many companies have only "acceptance by standard" in their systems, and the same bearings are different. Disassembly the test items for each type of spare parts, ticking the checker's photo form, is more efficient -- this is one that Shanghai-based technology has pushed on several projects.
Point 3: Where's the process of arrival and inspection?
The process recommends a six-step approach, each of which is recorded:
- Receipt of goods: Check the delivery order against the purchase order, confirm the name, quantity and party of the goods delivered.
- Preliminary check: Check for package integrity and logistics damage, photo archive.
- Check: take an inventory of physical quantities and check for complete random information.
- Technical inspection: Check on each of the criteria in point 2 and notify technical or quality personnel, if necessary, of their presence.
- Fill in the receipt and inspection form: contains date, arrival information, test results, and the person ' s signature.
- In or out: qualified goods are stored and unqualified are transferred to the non-conforming process.
From arrival to entry, routine spare parts are kept as far as possible within 24 hours; imported or inspected items can be relaxed to 5 working days, but the delay is specified in the system and skin-throwing is avoided.
Point 4: The rules for handling the defectives are to be written down.
The lack of conformity cannot be returned directly, but at least four things must be written in the system:
- Designation: Placing "unqualified" labels, storing them in isolation and avoiding confusion with the eligible.
- Record: Fill in the unsatisfactory report, with evidence of defects, severity and photographs.
- Communication: The time limits for processing are agreed with the vendor, whether it is to be replaced, re-refurbished or downgraded, and confirmed in writing.
- Retrospect: Spare parts returned require a re-routing of the complete acceptance process and cannot be entered directly into the warehouse.
There's a pit where you can step on: some companies, in order to catch up with the production process, let them "use it first, then change it later," and the defects flow into the line of production, and finally they say they're not. The system says "No parts that are not accepted" clearly, and rules are tight.
Element 5: Receiving and inspection records, archives and continuous improvement
Half the value of acceptance is in process, half in data. It's three things that are recommended:
- Desk account: A record is maintained for each shipment of spare parts, including purchase order number, supplier, arrival date, acceptance and inspection results, storage space.
- Record retention: Keep acceptance forms, inspection reports, and photos for at least one year after the spare part is issued. For critical parts, retain them until the equipment reaches the end of its lifecycle.
- Periodically recheck: quarterly statistics on acceptance and inspection pass rates, refunds and exchange of goods, by vendor ranking, to feed back data to procurement and vendor management.
The data on receipt and inspection of spare parts and equipment maintenance records are logged back to the source. When EAM (the equipment life-cycle management system) lands, the receipt and inspection desk accounts are usually linked to the main equipment data, facilitating subsequent tracking of the failure item and vendor evaluation. In making such asset management projects, Shanghai will use this piece as a label for the design of the bill.
End of story: what's a landing-based acceptance system like?
And you can tie up the five points above, and a complete system of receiving and inspection of spare parts should include: general rules and scope of application, organization and responsibility, standards for acceptance and inspection, process for acceptance and inspection, unsatisfactory processing, records and files, examination and improvement. The key is not to be long, it's not to keep the "who does every step," how do it, how do it, how far do it, what happens."
If this system is being combed or rebuilt, it is suggested that we start with a specific in-the-receipt backsliding -- finding the most decorative link, and making up for the more useful provisions of the system, which are more practical than creating a set of dozens of pages at once, and more acceptable to front-line people.