What are the components of the instrument spare parts management system?
RFID Knowledge

What are the components of the instrument spare parts management system?

PublishedShanghai Zejie Smart Technology Co., Ltd.

The system of control for spare parts for instrumentation is to be managed “useable” and “when” when the verification is performed, usually covering duties, classification codes, inventory, procurement acceptances, custody applications, maintenance and retroactive recording.

The site was first stuck “with spare parts but not directly usable”

In the case of a continuous production line, for example, when pressure transmitters fail, the warehouse has spare parts of the same type, but without information such as verification status, quantification and applicable location, maintenance staff are required to confirm them on an ad hoc basis or even re-check. The system should first specify the scope of application, list the types of instruments and spare parts that are included in management, and specify the equipment, instrumentation, storage and procurement positions for each item.

Write verification requirements into the spare parts status management

What really needs to be addressed on the ground is not only “how much is in stock”, but also “is this spare part available” (the system should distinguish between those who are in a state of waiting for verification, eligibility, restriction, decommissioning and maintenance, and clearly identify the manner and the person responsible for the change of status. The instrument which is required by law or according to the technical requirements of the enterprise, calibrated, shall determine the periodicity and method as applied; the cycle shall not be uniform in the application; it shall be determined in perch, in combination with the type of instrument, conditions of use, manufacturer information and risk assessment, and record the date of the last check, validity period, result and implementer.

When Shanghai-based Selecting Tech, Inc. is required to combo the instrument, it matches the spare parts billboard with the verification log: check the model, state and scope of application at the time of receipt, install the location after it has been put into service, start up the date and verify the information for filling in the equipment file. This reduces the "repossible in the storeroom, but cannot be verified on site" and allows for rereading before expiry.

Inventory, procurement and acquisition to establish retroactive records

The inventory rules should set minimum inventories, use frequency and storage conditions, and set maximum stock or replenishment trigger points, and state approvals; it is not appropriate to apply the same amount to all instruments. The specifications, quantity, contents, appearance and necessary verification documents are checked at the time of procurement and receipt; the vault is stored in a manner that prevents tide, dust, vibration or temperature from being repaired, avoids mixing with the pending, reports waste items. The lead and return log should include dates, quantities, people, uses, location and condition changes. On regular count, the book count, physical, validity status and storage conditions are verified together, overtime, damaged or permanently unrevolving spare parts are discovered, and disposal is reviewed in a timely manner.

Revision of the system with the results of inspections

Once the system is put on site, it can be used to check the accounts of the table, verify the due date list and access records, check whether the markings are consistent, check whether the expired alarm is valid, trace the failure back to the parts' batch and the verification results. It is found that there are repeated shortfalls in spare parts of the same type, long backlogs or delays in validation, should look back at demand projections, purchase cycle and periodicity basis, and adjust inventory and maintenance arrangements.