What are the elements of the spare parts warehouse management system?
What are the general coverages of the spare parts warehouse management system?
The core of the spare parts management system is three things: to enter, out, keep, and add a table book, take an inventory, divide security responsibilities. A complete system document usually contains scope of application, organization and responsibility, process for entering, process for entering, storage and maintenance requirements, account and inventory, and examine and improve these items. Mechanical plants, chemical plants, power stations, wind farms, etc., are all about equipment-intensive enterprises, regardless of size, but only on a system-regulating and approval level.
When we do the formalization of the warehouse, we often find that management problems are not a lack of systems but rather too thick — for example, by providing that "who will sign" is only required, without distinguishing between key and commons going through the same process, which is confusing as soon as they get busy.
How do you operate the entry chain?
The goal of the library management is to get every piece of it "right, right, find, do not go wrong" and standard actions are four steps:
- Checks the goods: Purchase order number, supplier, name, specification type, graph number, quantity, each of which corresponds to the purchase order and the consignment information. The items in the model are compared to each other (e.g., a series of different sizes of bearings), and cannot read only the name.
- The inspection status confirms that spare parts requiring a quality check are first sent for inspection, and the eligible documents are marked with a conformity or with a test form; emergency release is subject to a special process and documented.
- Fill in the warehouse form: Three types of storage (storage, finance, use) containing dates, single numbers, unit numbers, unit numbers, quantity, storage slots, receivers. Key items involved in maintenance of safe or shutdown equipment are separately numbered.
- Uplift and mark: The label is placed by ABC or equipment, and the slot number is entered into the desk account.
Special packages are to be handled separately: rubber seals, electronic components subject to temperature control (general 5-25°C), wet control (relative humidity below 70%); chemical spare parts are stored in sub-districts as required by the MDS (chemical safety technical instructions) and avoid mixing.
Why do you have to sign and take a receipt?
The following are the most easily lost, wrong or damaged items in the library.
- The claim for the receipt: a statement of the name, unit number, piece number, specification, quantity and purpose of the equipment is provided by the maintenance staff or equipment officer on the basis of the worksheet.
- The higher or unusual amount of the items is subject to signature by the supervisor or the procurement committee.
- Delivery on the first-in-first-out (FIFO) principle: priority is given to the first batch of inventory when there are multiple shipments with the same number, thus avoiding a long backlog that will fail.
- The inventory is registered and signed: the warehouse custodian signs on the bill of release, the recipient signs it, and the account is simultaneously deducted from the inventory.
Two separate situations are to be clearly addressed: first, emergency repairs allowing "first-come-after-served orders" but only after 24 hours of completion; and second, expendable spare parts (Lubricant, Leach cores, etc.) are issued at periodic quotas to avoid waste from everyone.
What are the easy things to ignore at the day-to-day custody stage?
"Housekeeping" seems to be just putting things in order, which directly affects the life of the object. The focus is on four things:
- Environmental control: Precision storage area thermo-moistometers are installed and recorded once a day; dehumidification or air conditioning is activated beyond the set range.
- Empirical management: rubber, lubricants, chemical reagents have a shelf life (most seals are stored for more than 2 years with ageing), and the account is maintained with "the date of entry" and "re-checking cycle" fields, one month in advance of expiry.
- (b) Platoon and marking: heavy equipment is fitted with a shelf of appropriate carrying capacity, with clear markings for each floor; precision items are individually packaged in static-proof boxes.
- Safety and protection: Fire-fighting facilities, electricity security, smoke-free storage, key or door-bargaining codes and desk billing are kept by different persons, which creates mutual constraints.
The safekeeping chain is not a department of the warehouse. When Shanghai helps its customers to clean up the system, it divides the responsibility for the safekeeping into specific posts -- who is responsible for the temperature record, who is responsible for the alert, who is responsible for the security check on the shelf, who can find the right person, and who is responsible for avoiding "collectively, practically."
How do we fit the bill and the count?
The billing is the basis, the inventory is a correction, and one cannot be made. The account must contain at least: item number, name, specification, unit, current inventory, minimum stock (safe stock), maximum stock, position number, last bank date, supplier. Once the minimum stock is triggered, it automatically generates a procurement proposal, and nothing can be replaced if equipment fails.
The frequency of the count is distinguished by value and mobility of the item:
- Key items (Class A, special for high-value or cut-off equipment): monthly diskettes, quarterly as a whole.
- Generic (Category B): A quarterly disk, half-yearly total.
- Low-value, vulnerable (C): six months or a year at all.
The basis for the underlying reasons is more important than to hold individuals accountable.
The system is good. Where does the execution usually get stuck?
In the case of actual exposure, there are often four common problems with the system ' s failure:
- The duty bearers were unclear: the system had written "the warehouse is responsible", but it did not say which position and which action the warehouse was responsible for, and it became "collective responsibility".
- The maintenance worksheets were not fully accessible: the lead was written orally or by hand, and the number of the worksheet was not linked to it, and the equipment failure analysis did not identify what had been used.
- The backlog is unmanaged: 3 years or more of spare parts that remain intact are held in funds and storage, and are kept without regular clean-up mechanisms. It is recommended to focus on the disposal of scraps once a year, transfers or withdrawals.
- Training and examination for vacancies: new staff are not well-trained in the process, and old employees do their work by custom.
The spare parts warehouse management appears to be back-end support, and direct decisions are made as to whether the equipment can be repaired in a timely manner.