What are the elements of a spare parts management system for workshop spare parts?
What exactly does the spare parts management system for workshop supplies control do?
The core of the spare parts management system for workshop supplies is a sentence: to put the right spare parts in the right place at the right time, neither backs up nor keeps running. A complete system usually contains six modules -- the sorting of spare parts, stocking quotas, access processes, consumption statistics, additional early warning, end-of-life disposal. Each module must be placed on a specific form, a bill or system field, otherwise it will be empty on paper.
How can spare parts be classified to facilitate management?
Classification is the starting point of the system. The common approach is to divide it by two dimensions: "Sexuality × Rate of Consumption":
- Category A (key spare parts)The inventory is strictly subject to security quotas.
- Category B (common spare parts): A high-frequency consumption but short procurement cycle, such as bolts, belts and lubricants.
- Category C (low-value and depletion): Low value and high usage, such as gloves, sandpapers, bandages.
The classification reduces the large number of invalid approvals by corresponding to different levels of access and frequency of inventory.
What should we do with the access process?
The most vulnerable part of the access chain is not "no one" but "the approval is too slow for workers to wait." A program that can be implemented in roughly four steps:
- Billing.User fills in the equipment number, spare parts code, quantity, use in the receipt or system.
- ApprovalThe signature of the head of the workshop is required for spare parts in category A, and only for classes B and C. The signature of the department of equipment is also required if the single amount exceeds a certain threshold (e.g. $500).
- Out of the library.The warehouse is coded, physically and on a desk account, and the goods are shipped in a consistent manner and signed by both parties.
- Write-offs• Spare parts are received in tandem with specific equipment or worksheets to facilitate subsequent statistical consumption.
A common error in the exercise is that all applications are approved by OA, which results in workers being troubled and leaving their system empty.
What does consumption statistics do?
If you're just running an Excel at the end of the month, then it's basically not done. The real good statistics are three things:
- Back to Device: Each consumption record is posted on the specific equipment number and it will be possible to see which equipment “most expensive” after six months.
- Distinguishing plans and anomaliesDaily maintenance consumption is planned, and unexpected failure consumption is abnormal, with separate statistics at the end of the month.
- Compare quotaActual consumption compared to the spare parts quota and an excess of a percentage (15 per cent reference value) automatically triggers review.
Shanghai-based technology, when it provides a system combo for manufacturing enterprises, finds that simply running through the "scrutinization of spare parts to equipment" reduces an inexplicable maintenance cost per month — previously mixed with a total of no trace of source.
How do we keep our safe stock secure?
The security inventory is not a headshot, and the common empirical formula is:
Security inventory = average daily consumption x procurement cycle x security factor
The common security factor values range from 1.2 to 2 - 1.2 when supply stabilizes, and 2 when the procurement cycle is irregular. Add a "reordering point", which means that "the current stock drops must be placed down" — usually the security inventory reduces the usage of half the purchase cycle.
For example, if you use two bearings a day, procurement takes seven days, and the safety factor is 1.5, safety stock = 2 × 7 × 1.5 = 21 bearings. When inventory drops to 14 (21 − 2 × 3.5), trigger a purchase request. Update these figures annually based on actual consumption.
What should be the focus of end-of-life and disposal?
The end-of-life link is often ignored, but there are a lot of problems.
- End-of-life criteria: To specify what state is irreparably, e.g. the electric power burns to an untested level and the area of the bearings is detachable above the threshold. Write in detail, do not write a vague expression such as "serious damage".
- Disposal processThe waste is taken four steps by "technical identification - workshop signature - warehoused-collected" to avoid miscalculation or the taking of bad.
- Table Logging: Waste is recorded in the system for at least one year, facilitating retroactive and audit.
What are the easiest points for a system to get stuck in?
The completion of the system is not equivalent to landing.
- Encoding Chaos: Three names from the same bolt were not matched by a billboard. The solution was to have a uniform set of rules for the code of spare parts and to make verification mandatory when you received them.
- It's not the same.: 100 in warehouse accounts, only 60 in physical items. Often the reason is that the inventory is not signed or recorded. It is recommended that category C take a daily count, category B take a weekly count and category A take a monthly count.
- No review.The system needs to identify the role of "spare parts manager" and to provide dedicated staff.
The spare parts management of the workshop is a small logistical matter, which in fact directly affects the start-up rate and maintenance costs of the equipment. A system that can land, not with many terms, but with running processes, data being real, responsibility being placed on people. It is recommended to start with classification, access, consumption of these three pieces, running back to secure storage and end-of-life disposal, and move forward much more.