How is the equipment spare parts management system developed? Content and implementation elements
RFID Knowledge

How is the equipment spare parts management system developed? Content and implementation elements

PublishedShanghai Zejie Smart Technology Co., Ltd.

A system of equipment spare parts that can land, with five things to be addressed at the core: Clarify the range and responsibilities of spare parts, grade them, set inventory strategies, write down the procurement and acquisition process, and establish implementation checkpoints. The system works not because of the size of the documents, but rather because the first-line personnel are willing to do it, whether or not the spare parts data are available. This applies to manufacturing enterprises with a continuous production facility, with more than 50 shut-downs, and over 300 sites for spare parts.

First, draw the boundaries of the spare parts and those responsible.

Many companies write a list of spare parts, and no one can tell what "spare parts" are when they are implemented. We usually cut the scope first, and then we go into details.

After the boundary is drawn, the responsible person must be clear.Head of the Department of EquipmentResponsible for the spare parts ledger,Chief of MaintenanceThe government is responsible for the acquisition and replacement of records.Procurement ClerkThe government has been monitoring the situation and is now in charge of the orders and receiving and inspection.FinancialYou can write a job name more useful than the writing department because you can find someone directly if you have problems.

II. The classification of spare parts cannot be one-size-fits-all, but they have to be graded according to key levels

The use of the bearings and indicator lamps in the same inventory logic tube is the root cause of overstocking or breaking up spare parts in most enterprises. We often use an upgraded ABC classification to divide spare parts into three layers at two dimensions:

Level Criteria for determination Inventory strategy Example
Category A Shut-down loss > $50,000 per hour or procurement cycle > 30 days 1:1 Ready, stand-alone, monthly count Main electric power, PLC module, server drive
Category B Downtime costs 10,000–50,000 yuan per hour, or a procurement lead time of 7–30 days Maximum minimum stock at consumption Gas cylinders, relays, commonly used sensors
Category C Cut-off loss < $10,000/h and procurement cycle < 7 days No inventory, buy it when you need it. Lamps, standard bolts, seals.

Key reminder: The list of spare parts for category A is to be confirmed by the Deputy Chief Production Officer or the Sub-Chief Equipment Officer, and cannot be determined by the procurement officer itself, otherwise the system will easily leave valuables out as soon as it is implemented.

III. Stock strategy is about equipment critical, not the cost of spare parts

A common mistake is setting stock levels by the unit price. The real question is how long equipment will be down if the spare is unavailable. At a packaging machinery plant we worked with, a RMB 200 proximity switch failed. With no spare on hand, buying one from overseas took 21 days, and downtime on the line cost more than RMB 800,000. The factory subsequently classified all imported electrical components as Class A and kept a one-for-one backup even for inexpensive parts.

Specifically with regard to the quantity of stocks, three sets of parameters should be clearly stated in the system:

The parameters are not based on headshots, but are based on actual consumption data for the last 12 months.Semi-annual review of inventory parameters adjusted for equipment increases and decreases and process changes。

IV. Procurement and access processes need to be written so that people on the ground can understand

The most common issue with procedure documents is that managers think they're clear and frontline staff can't follow them. In the spare-parts policy, use a diagram and one sentence for each checkpoint, with no more than five steps. We usually structure it as follows:

  1. Request raisedMaintenance workers register spare parts names, models, equipment slot numbers in the worksheet system for time required.
  2. Inventory queriesThe warehousekeeper checks the system for available inventory, has goods directly out of the warehouse and no goods are transferred to requisition.
  3. Requisition approval(a) A-step equipment, sub-general approval, B-type equipment supervisor, C-class chief directly.
  4. Incoming and acceptedThe three parties, the procurement staff, the warehouse attendant and the user, were present and confirmed the model, number and appearance.
  5. Get in the library.• Relocation by coding, clean-up and updating of the minimum level of inventory alert line.

The access link should be singled out:The person who received the signature and installed it was registered as the replacement dateThis step is the basis for data for subsequent trouble analysis and life expectancy. Shanghai-based technology usually designs the application document into a two-dimensional code sweep, which is not used in paper sheets to get the data into the system on the day when it is put down.

V. Implementation of data-based panels and periodic retrodisposals, not by the system document itself

The system was only just beginning when it was written and published. We've seen too many corporate systems documents that are well-ordered, but the stock of A spare parts in warehouses is 40% different, because there's no inspection mechanism. It's suggested that three things should be written down in the system:

The panels are to be hung at the workshop or at the office of the Equipment Department, and they must show at least three numbers:Total funds in stock、A. Ratio of spare parts set-up(actual number of spare parts = number of spare parts due)Number of aircraft out of service this month. If kit completeness falls below 95% or production stops more than twice while waiting for parts, review the process instead of blaming frontline staff.

VI. Several often overlooked but must be written into the details of the system

After many years of consulting on the management of spare parts, we found that the following four were the most easily missed in the system and that it would be much easier to put the system back on track after its completion:

VII. A round of pilot projects after the system is released

It is suggested that a product line or a workshop be selected for a 2-3 month pilot, focusing on three things: whether the access process works, whether inventory data are accurate and whether the number of stopovers is down. The pilot ends with a redisposal meeting, changes the system's inappropriate writings, and then distributes an official version to the whole world.

If the default rate is over 5%, or if the system is frequently bypassed by a line of time, it means that the system does not match the actual situation on the ground, and it goes back to the process rather than the scene. The system is for people, so that they can do what they want, and do what they want, and it works, and it's a proper spare parts management system.