What about the spare parts management system for equipment?
Equipment and spare parts are subject to the same set of billings and process management: equipment information determines the requirements for spare parts, stock condition affects maintenance arrangements, and access records for re-feeding. The system should write down rules for duties, classification, requisitions, acceptance and inspection, storage, access, inventory and end-of-life and maintain records for each link.
Element 1: Management level by criticality of equipment
The system begins with a definition of the scope of application, which identifies the production equipment, assistive equipment and its spare parts that are included in management. It can be based on the impact of the shutdown, difficulties in maintenance, the procurement cycle for spare parts and security implications, focusing on equipment, important, general, three categories; classification criteria are determined by enterprises in relation to production, and it is not appropriate to classify them only at the cost of the equipment.
The unit account shall record the equipment number, name, model, location, date of entry, level of criticality, department responsible and major maintenance records. The spare parts account shall be linked to the equipment number and record the name of the spare parts, specifications, type numbers or technical requirements, applicable equipment, unit of measure and alternative relationships. There is no reliable basis for the replacement relationship, which should be confirmed by the equipment technicians before registration.
Element 2: Establish a threshold for each spare parts stock
Categorize spare parts by their impact and difficulty of procurement, then set minimum stocks, maximum stock and replenishment trigger points. Common consumables can be stored according to historical intakes and replenishment cycles; long-cycle, critical items with significant effects should be assessed separately in the context of failure risk and reparability. Parameters need to be corrected on a regular basis, and cannot be set up for a long period.
The “trigger point = average daily consumption x procurement cycle + security inventory” can be used as the initial method of measurement. For example, a spare parts unit is consumed on an average basis of 0.2 items per day, a procurement period of 20 days, and a safe stock of 2 items, a trigger point of 6 items. The value here is only used to describe algorithms, which should actually be approved based on the acquisition record, supply cycle and equipment risk. Shanghai Select Technologies Ltd. recommended that the inventory parameters be maintained with equipment lists, maintenance records and that spare parts not be managed separately from actual equipment requirements.
Point 3: Write requisitions, acceptances and repositories into a retroactive process
Requisitions should indicate the spare parts code, applicable equipment, existing inventory, number of applications, date of need, purpose and approver. Resupply can be initiated when stock is below the trigger point; unplanned requisitions add a description of failure, maintenance tasks or reasons for technical change. The approval authority, procurement method and amount limit should be completed in accordance with the enterprise ' s internal authorization system, and it is not appropriate to set uniform criteria in the template.
The quantity, packaging and accompanying information, equipment or technicians, specifications, model and technical requirements are checked upon arrival by the warehouse personnel. Items that do not match the receipt and inspection shall be marked and suspended; the batch, quantity, date, location and acceptance results shall be recorded after the certification is completed. The measuring device, spare parts that are susceptible to tide or have a shelf life, shall also be increased by their characteristics, environmental or validity records.
Point 4: Regulation of access, retrenchment and emergency loan
Record the recipient, date, quantity, corresponding equipment, maintenance order or failure number at the time of receipt; unexpended spare parts should be returned and checked for condition, and items that have been removed, damaged or unconfirmable can not be entered directly into the new inventory.
When parts are not specified in the maintenance, and when there is an abnormal quality or a substitute need, the problem should be recorded and submitted to technical confirmation. The reparable remedial items can be individually marked as being repaired, pending examination or scrap, and cannot be mixed with the inventory that is directly available. If the number of accounts does not match the physical value, the application, the vault, the cause of loss or entry, and adjusted for authority.
Element 5: Use of inventories and indicators to facilitate system updating
The system should specify the frequency of the count, the processor of the difference and the approval requirements. The time limit can be increased for high-value, critical and vulnerable spare parts, and other materials are subject to the enterprise inventory management arrangement. The inventory records include at least the number of books, the quantity of physical holdings, the reasons for the discrepancy, the processing of opinions and reviewers; inactive items, expired and long unused items should be periodically assessed for continued stocking.
The system is set up by selecting a key equipment for trial operation, checking the equipment code, matching and access records, and revising the form and approval process. This allows the system to be implemented and allows for continuous inter-correction of equipment management and spare parts management.