What are the elements of the equipment spare parts management system? Responsibilities and processes
RFID Knowledge

What are the elements of the equipment spare parts management system? Responsibilities and processes

PublishedShanghai Zejie Smart Technology Co., Ltd.

Point 1: Dismantling the system into seven modules, each of which corresponds to one responsible person

The equipment spare parts management system usually covers seven main modules: segregation of duties, allocation and ration of spare parts, planning and procurement, inventory management, access and use, testing and obsolescence, computerized billboards. Each module must be clear "Who does it, how does it, how far." We have seen seven pieces mixed together, and the last line is unconnected, and the system becomes wall-mounted paper.

Point 2: Division of duties - five categories of posts have borders, not one more post

A system that works, first to define the role:

Five types of posts must be connected, such as the use of workshops to report needs, before warehousing can be checked for procurement and duplication of orders.

Element 3: Classification and Quota of Spare Parts - ARC methodology to rationalize stock structure

The most common pit is the large storehouse, which is built as soon as spare parts come up.

There is an empirical formula for the calculation of reserve quotas:Minimum inventory = average monthly consumption x procurement cycle + secure inventory;Maximum inventory = minimum stock + one purchaseThe security stock is generally 20-30% of the average monthly consumption.

Point 4: Planning and procurement processes — three-tier plans to avoid ad hoc implementation

Procurement is not a temporary emergency, but a three-tier plan:

  1. Annual plan: Submit the following year's budget request by November each year, including a list of Class A spares and bulk purchases.
  2. Monthly plan• A summary of workshop requirements at the beginning of each month, combined with an annual/monthly inventory production plan.
  3. Emergency plan: Temporary procurement triggered by a sudden failure takes 24 hours to complete approval.

Procurement should have at least two qualified suppliers. Class A purchases valued above 50,000 yuan should go through quote comparison or tender. One automotive welding plant reduced capital tied up in stock by 30% after consolidating Class A spare-parts suppliers from six to three.

Element 5: Stockpile management - need for consistency in accounts, cards and goods

The warehouse management has four hard requirements:

Many factories had uncounted accounts, and the final physical insufficiency of electronic sets and paper files was a problem.

Point 6: Access and use - dual control of old for new + approvals

The access chain is the most vulnerable, and the system has two lines:

The equipment number, maintenance unit number is registered simultaneously at the time of receipt to facilitate subsequent retroactive consumption.

Point 7: Test and end of life - Check before and after entering the bank

The tests are divided into two levels:

Define disposal criteria explicitly: the part is past expiry and fails performance requirements, repairs cost more than 60% of a replacement, or the part fits equipment the government has explicitly ordered phased out. Disposal requires signatures from equipment management, finance, and warehousing. Keep signed forms on file for at least five years.

Point 8: Information desk accounts — data run-off to reverse the optimization of quotas

Once the earlier steps are working, use the data to check the results and adjust. An electronic components plant we worked with at Shanghai Zejie Technology moved its register out of Excel and found that 30% of its Class B spare parts had not moved in six months. Its stock targets were clearly too high. Reducing them freed up capital on the order of millions of yuan.

The information-based module contains at least four tables: the main data sheet for spare parts (code, specifications, suppliers), the warehouse, the warehouse account, the inventory balance table. A monthly consumption analysis is conducted, by equipment, workshop, three dimensions of the month, and a revised reserve quota.

Element 9: Three proposals for action on institutionalization

The system is written in such a way that no one can look at the nuclear sky-lightboard, and it's only one thing: run seven of the above modules through, run six months of data back and optimize the quota, which is the path to use the system alive.