What are the elements of the equipment spare parts management system? Responsibilities and processes
Point 1: Dismantling the system into seven modules, each of which corresponds to one responsible person
The equipment spare parts management system usually covers seven main modules: segregation of duties, allocation and ration of spare parts, planning and procurement, inventory management, access and use, testing and obsolescence, computerized billboards. Each module must be clear "Who does it, how does it, how far." We have seen seven pieces mixed together, and the last line is unconnected, and the system becomes wall-mounted paper.
Point 2: Division of duties - five categories of posts have borders, not one more post
A system that works, first to define the role:
- Equipment management:: Drafter of the system, responsible for preparation of spare parts plans, approval of quotas and monitoring of inspection.
- Use of workshops• Demanders, submit spare parts requirements by equipment spot check and maintenance records, and provide feedback on usage.
- Warehousing sectorPhysical manager, responsible for receiving and inspection of the inventory, registration of the inventory, inventory of the stock, early warning of stocks.
- Procurement: Vendor interface, for price-for-money request, contract signing and arrival tracking.
- FinanceBudget and cost-cutting, review of the use of spare parts funds, participation in end-of-life validation.
Five types of posts must be connected, such as the use of workshops to report needs, before warehousing can be checked for procurement and duplication of orders.
Element 3: Classification and Quota of Spare Parts - ARC methodology to rationalize stock structure
The most common pit is the large storehouse, which is built as soon as spare parts come up.
- Category A (key spare parts)This is usually 10-20% of the variety, and the amount is 60-80%.
- Category B (general spare parts): Common, medium unit price and procurement cycle of 1-3 months.
- Category C (consumables): Low-value, perishable goods such as seals and bolts, may be procured in bulk.
There is an empirical formula for the calculation of reserve quotas:Minimum inventory = average monthly consumption x procurement cycle + secure inventory;Maximum inventory = minimum stock + one purchaseThe security stock is generally 20-30% of the average monthly consumption.
Point 4: Planning and procurement processes — three-tier plans to avoid ad hoc implementation
Procurement is not a temporary emergency, but a three-tier plan:
- Annual plan: Submit the following year's budget request by November each year, including a list of Class A spares and bulk purchases.
- Monthly plan• A summary of workshop requirements at the beginning of each month, combined with an annual/monthly inventory production plan.
- Emergency plan: Temporary procurement triggered by a sudden failure takes 24 hours to complete approval.
Procurement should have at least two qualified suppliers. Class A purchases valued above 50,000 yuan should go through quote comparison or tender. One automotive welding plant reduced capital tied up in stock by 30% after consolidating Class A spare-parts suppliers from six to three.
Element 5: Stockpile management - need for consistency in accounts, cards and goods
The warehouse management has four hard requirements:
- Partition set• Fixed cargo slots for each spare parts by ABC classification and equipment type of partition.
- Mark it.: code, name, specification for each position to avoid error.
- Environmental compliance: The electron-registers are at a temperature of 18°C-28°C and 40% - 70% wetness relative to the electronics.
- The account numbers are consistent.Monthly small and quarterly large inventories, with a variance of less than 0.5 per cent.
Many factories had uncounted accounts, and the final physical insufficiency of electronic sets and paper files was a problem.
Point 6: Access and use - dual control of old for new + approvals
The access chain is the most vulnerable, and the system has two lines:
- New for oldParts in categories A and B must be handed over to the old, individually marked when older items are stored, reparable into the repair area and unrestructible into the scrap process.
- Permissions: Issues valued below RMB 5,000 require workshop manager approval. Those from RMB 5,000 to 50,000 require approval by the equipment department. Those over RMB 50,000 require plant management approval.
The equipment number, maintenance unit number is registered simultaneously at the time of receipt to facilitate subsequent retroactive consumption.
Point 7: Test and end of life - Check before and after entering the bank
The tests are divided into two levels:
- Library CheckChecks the specifications, quantities, appearances, rusty or deformations, and if necessary, size tests or performance tests.
- Periodic testing: Biannually, a check-up of the validity, rust and performance decay for category A spare parts.
Define disposal criteria explicitly: the part is past expiry and fails performance requirements, repairs cost more than 60% of a replacement, or the part fits equipment the government has explicitly ordered phased out. Disposal requires signatures from equipment management, finance, and warehousing. Keep signed forms on file for at least five years.
Point 8: Information desk accounts — data run-off to reverse the optimization of quotas
Once the earlier steps are working, use the data to check the results and adjust. An electronic components plant we worked with at Shanghai Zejie Technology moved its register out of Excel and found that 30% of its Class B spare parts had not moved in six months. Its stock targets were clearly too high. Reducing them freed up capital on the order of millions of yuan.
The information-based module contains at least four tables: the main data sheet for spare parts (code, specifications, suppliers), the warehouse, the warehouse account, the inventory balance table. A monthly consumption analysis is conducted, by equipment, workshop, three dimensions of the month, and a revised reserve quota.
Element 9: Three proposals for action on institutionalization
- A list of spare parts and a stock quota form, which are the skeletons of the system, are not available without both tables and other elements cannot be landed.
- The performance was re-costed on a monthly basis during the first three months, with emphasis on stock discrepancies and emergency procurement ratios, and adjustments to quotas after the threshold.
- The approval process and the billing are being upgraded as much as possible, with paper documents moving slowly and easily lost, and no data loops running.
The system is written in such a way that no one can look at the nuclear sky-lightboard, and it's only one thing: run seven of the above modules through, run six months of data back and optimize the quota, which is the path to use the system alive.

Ms. Lei
Mr. Pang