What are the elements of a spare parts management system for electrical power? Safety and supply
RFID Knowledge

What are the elements of a spare parts management system for electrical power? Safety and supply

PublishedShanghai Zejie Smart Technology Co., Ltd.

The power spare parts management system, which usually defines the categories and quotas for spare parts, requirements plans, procurement acceptances, warehousing custody, receipt of refunds, quality retroactive, inventory write-off and emergency security, focuses on making key spare parts available, sourceable, safe to store, while avoiding backlogs and obsolescence.

What should be the basic elements of a spare parts management system for electrical power?

The system should be clear of the scope of management, job responsibilities and operating processes. The range of management can cover applications for spare parts for spare parts, procurement, acceptance, warehousing, maintenance, access, repossession, redeployment, maintenance, inventory counting and end-of-life; the duties are to be carried out into equipment management, procurement, warehouse, overhaul and approval staff, avoiding unrecognized needs, unrecovered or non-conformable. Each business should keep a record of the transaction, which will result in a retroactive link from demand to use.

How are the classification of spare parts and stock quotas to be determined?

The inventory can be classified according to the level of equipment importance, the consequences of failure, the procurement cycle and the difficulty of replacement. The primary management is to manage spare parts that affect the safe operation of the main equipment, which are difficult to procure in the short term after a malfunction; generics control inventories in conjunction with historical access. The stock quotas can be based on historical consumption, plans for review, supply cycles and existing stocks, and set out the minimum, maximum or replenishment conditions for each spare part. For example, for specialized components with longer procurement cycles, the inventory should be checked after confirmation of the overhaul plan, so as not to start the purchase until a breakdown occurs.

How can security requirements be implemented into procurement, acceptance and storage?

The request for procurement shall contain the name or number of the equipment, the type of the spare parts specification, the quantity, use and time required; the type, quantity, appearance, quality documentation and necessary technical parameters to be checked for arrival and inspection, and shall be separated and processed according to process when found not to be in conformity. The storage chain shall be conditioned on the nature of the spare parts, so as to protect against tide, dust, rust, fire etc.; items with a warranty or storage period requirements shall be dated and reviewed in accordance with the rules.

How can the supply of critical spare parts be safeguarded and inventory risks controlled?

The list of critical spare parts can be established, the number of stores is checked periodically, the procurement cycle, the supply status and needs for overhauls; the requisition is initiated when stock is below the replenishment trigger value, temporary shortfalls are assessed by approval process to allocate, maintain or replace, and technical suitability confirmed. Access, the refund and maintenance warehouse are updated in a timely manner, and regular reconciliations are performed to review long-outstanding, damaged or beyond the service life of spare parts. Shanghai-based Technology Ltd., while combing relevant management processes, may divide duties, line fields, approve nodes and inventory alert rules are included in the annexes to the system, so that on-site personnel can implement them according to the same standards.

What more needs to be examined when the system is in place?

It is recommended that the inspection cycle be based on the criticality of equipment and management risk, to verify whether key spare parts are accounted for, the condition of storage is in accordance with requirements, the quality and duration information are complete, and the retroactivity of requisitions and access records. The problems identified should identify the responsible position, correct the period and review how. The system should first be located by combing the list of spare parts with existing inventory, then supplementing the classification of quotas, process sheets and check requirements, and revise periodically the arrangements and actual consumption according to changes in equipment.