What are the points and processes for asset inventories? Key control points
RFID Knowledge

What are the points and processes for asset inventories? Key control points

PublishedShanghai Zejie Smart Technology Co., Ltd.

I. The pre-start inventory determines whether the scene will go well or not.

The reason for the inventory of problematic projects is that they are not prepared sufficiently during the start-up phase.

The first thing is to have a clear inventory range. Fixed assets, inventories, in store goods, in tools, low-value, low-cost items, in construction projects, are clearly listed. A factory that was used as a warehouse had left a swinger's plastic tray in the inventory, and ended up missing 20,000 more than it did, and then it was added later.

Second, set the right time window. A count is most accurate when production is stopped. If a shutdown is not an option, use the shift change. One machining plant starts an hour before the day shift ends and checks key areas again half an hour after the night shift takes over.

The third thing is the list design. At least at the head of the table should be: asset number, name, specification model, location of storage, use department, number of books, number of actual discs, number of differences, inventory person, reviewer. Before this table goes down, take a sample of 10% and make a predisposal, so that the label can be released in advance, and the coding conflict.

II. On-site inventory, cluster + double review can contain most of the errors

The greatest risks in the field are leaks, misdirections and re-displays, which are more dependent on process design than responsibility.

A common practice is to group by physical location. Assign two people per team, one counting and one recording, and swap people for a second count after each area. At one midsize trading company, one warehouse employee and one finance employee cover each shelving group. Because finance staff are less familiar with the items, they ask more questions, avoiding"I thought there was more already."Misjudgement.

The asset number tag is also marked to death.Shanghai Picking Up Tech Ltd.A common situation was observed in multiple inventory items: two sets of numbers for the same asset, one set that was posted on the purchase record, one set that was posted after the purchase, the other number that was not matched, and the count was jammed. An earlier tag cleanup saved the balance-up days later.

The scale is to be calibrated. The scales for recalculation are to be calibrated, the packaging specifications for count counts are to be consistent, otherwise there will be a difference of 3 to 5% between the two points of the same shipment. We have been exposed to a cold chain distribution scene where the size of the boxes used for the meat product count by piece is not consistent, and the differences are ultimately counted on a class, creating unnecessary controversy.

III. Discrepancies adjustments and the accounting interface are closed only for post-discretion processing

Many people thought that the data would be finished and that real work was just beginning.

The variance analysis is classified. Is there a quantitative difference, a state difference, or an attribution difference? Quantity difference is divided into natural loss, measurement error, loss of three, and separate processing. One common scenario is that 420 tons of steel on the books only leaves 408 tons, and 9 tons of the 12 tons difference comes from measurement error (a 0.5 per cent deviation in the earth pound is accumulated in 1,800 tons), and only 3 tons is real loss, so finance can make the right accounting adjustment.

The approval process is omitted. The excess or shortfall exceeds a certain amount, and the management signes it, the disposal of which includes reporting losses (out-of-service expenses), reconciliations (corrections), write-off (recognizing losses), recourse (man-made). The threshold depends on the size of the enterprise itself, with the common practice in manufacturing is $50,000 per unit or $500,000 per unit difference as the approval line.

Keep your account on time."Persons pending disposal are in excess."The whole inventory is closed from start-up to closure of accounts, with recommendations not exceeding 30 working days.

Key control points, which are the most easily to overturn

Problems in rehearsing the inventory projects over the years tend to be concentrated on these elements:

Five, take a count of the people behind.

We have done an inventory of the relevant projects, and we have put these actions in the vanguard, which will increase overall efficiency by 30 to 50 per cent:

  1. Two weeks ' notice of stock count, specifying the cut-off time period, area of responsibility and those responsible.
  2. The inventory list first indicates a book count in the system, and the inventoryer fills only the actual number and differences, reducing handwritten errors.
  3. The meeting is held every night, and areas not completed on that day are given priority on the second day to avoid a build-up of problems.
  4. The inventory report, which includes a breakdown of the differences, an analysis of the reasons, and improvements, should not be submitted in one form within one week of the exercise.
  5. Linking the inventory results to performance appraisals, but only to manageable items (e.g., leakage rate, label integrity) and not holding employees accountable for market price volatility as an uncontrollable factor.
The asset inventory is not a one-time task and is the underlying movement of enterprise assets management. Process standardization, clear responsibilities, and reset are in place, with a complete inventory being performed and work on the latter becoming more and more consistent.