What stages should be covered by the full-life asset management software?
RFID Knowledge

What stages should be covered by the full-life asset management software?

PublishedShanghai Zejie Smart Technology Co., Ltd.

Many people's understanding of asset management is on the level of "inventory counting" and "no matter." But the central issue that the full life-cycle asset management software will address is to get an asset from the day it was programmed to end-of-life disposal, change in status at every stage, shift in value, and cost is recorded and traced. One sentence: cover planning, build, transport, dispose of four stages, and connect assets from birth to death.

A common misunderstanding: the count is just "entry," not all of it.

Many people have access to asset management, which starts with the annual inventory -- a bar code, a sweep, a system, a check-in. This is actually the most basic link in asset management, which is equivalent to an "id" for assets. The real full life cycle management answer is: when this asset was bought, how much it cost, how long it took, how many times it was repaired, when it was written off, how much residual it could recover. Just making a count, it's like taking a picture, where it came from, where it went.

First tier: planning and setting up of items, with asset costs starting from source

Decisions made before purchase often determine the asset's cost over its entire lifecycle. A widely cited rule of thumb in industrial asset management puts purchase costs at just 20%–30% of total lifetime cost, with the remaining 70%–80% incurred during operation and maintenance. If planning leaves out later costs such as maintenance, energy, and spare parts, the project may be locked into higher costs from the day the equipment is bought.

The functions that the software needs to support in the planning phase include: asset requirement declaration and approval process, investment budget and return analysis, selection comparison and technical parameter recording, automatic generation of initial information on asset desk accounts after project creation. These data will be the starting point for all subsequent phases.

Second tier: construction period, complete birth file for the asset.

The arrival and acceptance of assets is the first key node of full life-cycle management. This phase requires a shift from "in-progress" or "material" to "in-use" status, with a complete initial archive.

The core data typically include: asset code (generally using a grade-coding rule, such as the Large + Subcategory + Stream), name type specification, manufacturer, out-of-plant number, date of purchase and start-up date, original value, location of installation, responsible person, use department, contract number and invoice number, and random technical information (statements, certificates of eligibility, drawings).

Many enterprises are not working at this level, which leads to the lack of original data or equipment actual parameters that match the table records. When Shanghai-based Sieger Technologies is building asset systems for some manufacturing firms, they set up a "send check" link, making these fields into standardized templates, individual cases by recipient, missing items cannot be submitted and files from source to avoid gaps.

Third tier: duration of operation, longest and largest data

The assets are put into the operational phase, often lasting for years or even decades, and are also the most cost-intensive. This segment requires more functional modules to be viewed in unbundled form.

Daily inspections and spot checks

The system automatically determines whether or not to trigger an early warning, using a mobile end-sweeping code.

Malfunction maintenance and worksheet management

The maintenance worksheets are created after the equipment has failed, recording failure, maintenance process, replacement of spare parts, maintenance hours and maintenance costs.

Preventive maintenance plan

Set a regular maintenance schedule, based on the plant's proposal or historical failure pattern, to replace the alarm for vulnerable items. For example, the air press replaces the core every 2000 hours, and transformers perform insulation tests every year. The plan expires and automatically assigns workers to reduce leakage coverage.

Spare parts management of spare parts for the preparation

Record the amount of spare parts in stock, their location and minimum inventory warning.

Depreciation

The usual method includes the average age method, the workload method, etc. The depreciation data and the finance module are used to generate a certificate directly after they have been completed.

Asset change management

The system records the reasons, time, operator and so on for each change, creating a complete trajectories of change to avoid "the account, person or place of account".

The fourth layer: waste disposal, the last mile that can be ignored.

Many enterprises end their asset management "still in use" and cannot find complete historical data when they really want to be scrapped: years spent, times repaired, residual values left, and compliance with the end-of-life criteria.

The end-of-life disposal phase software needs support: the process of validation of end-of-life applications, assessment of end-of-life residual values and choice of disposal methods (sale, recovery, destruction), processing of asset accounts (smoke-down value, accumulated depreciation, net value), post-end-of-life file storage and searching.

Some of the equipment, though in its useful life, has residual use space -- parts that can be dismantled as spare parts or transferred to non-critical positions. These decisions depend on data accumulated at previous stages, and without a complete historical record, they can only be brain-psumped by experience.

It's only meaningful to get through the four stages.

The value of the full life cycle management software is not so much how powerful a single module is, but whether data can really be accessed in four stages. A device can only answer management's most important concern: how much we spend on each asset, and what we spend on it, is worthless, from the amount budgeted at the time of project creation to the actual cost at the time of purchase, to the cost of each maintenance, and ultimately the residual value of the end of the service, which is linked to one line.

For enterprises preparing to build or upgrade asset management systems, it is proposed to start with two dimensions: first, to clear the complete process of entry and exit of their assets, and second, to assess whether existing data bases — the completeness of the desk accounts, the traceability of maintenance records, and whether there are marks left on the end of the service. Then check out the missing gaps against the functional module. First, you can connect the data chain to the data chain, which is often more practical and more likely to have effects.