What are the requirements for the management of spare parts for equipment?
The equipment spare parts management requirement usually requires clear identification of the categories of spare parts, a plan of requirements, receipt and inspection for procurement, safekeeping, maintenance for use, inventory write-off and job responsibilities. It is also important to specify who will approve, record what and when to review them in order to reconcile them and receive them in a timely manner if required.
What should be included in the provisions for the management of spare parts for equipment?
An enforceable provision, at least covering the catalogue and code of spare parts, inventory management, access and repossession, inventory and disposal, segregation of duties and record keeping. The spare parts catalogue should be marked with names, specifications, models, applicable equipment, units of measure and key attributes; for easily confused models, a distinction should be made by means of codes or labels.
The time frame, long periods, when the stoppages have a significant impact on spare parts, usually requires separate assessment. Inventory parameters should be supported by an approval basis and reviewed in case of equipment retrofitting, change in supply cycle or change in consumption, rather than a permanent initial setting.
What should be done with the procurement, acceptance and receipt of spare parts?
The request for procurement shall identify the use of spare parts, corresponding equipment, existing inventory, quantity of requirements and reasons for the request; and, upon approval, the required amount. Check the name, specifications, quantity, appearance and accompanying information on arrival, separate the parts that are tested as unsatisfactory or not in conformity with the information and record the results of the disposal.
The application should be submitted by the user department, approved with authority and released from the library, and the recipient, date, quantity, use and corresponding equipment should be recorded. Unused spare parts after maintenance should be returned; old pieces removed must be repaired, pending validation and end-of-life status, and cannot be directly commingled into available stocks. Shanghai-based Select Hightech recommends that the application be approved, access to the vault and maintenance should go in the same chain of records, facilitating subsequent retroactive and cross-checking.
How are inventory, responsibility and periodic inspections implemented?
The rules should cover warehouse management, equipment use, procurement and approval positions, each of which is responsible, avoiding inventory discrepancies without verification. The inventory can be periodically and comprehensively checked according to the enterprise system arrangements, with additional spot checks for high value, critical or vulnerable spare parts; if discrepancies are detected, the access documents and physical items will be reviewed first, and the accounts adjusted and reasons recorded in accordance with the approval process. Overdues, rust, damage or long-term needless spare parts should be evaluated, repairs, transfers or scrapped, disposal processes retained and documented.
The system is subject to review and review on a regular basis, so that it can be implemented on an ongoing basis.