What are the key points for the management of spare parts in stock?
RFID Knowledge

What are the key points for the management of spare parts in stock?

PublishedShanghai Zejie Smart Technology Co., Ltd.

The common challenge in the management of spare parts is to be prepared for stoppage or to lower stock occupancy. The impact of downtime, procurement cycle, value and stability of spare parts and requirements should be judged together: safe storage of high-impact, long-term spare parts; low demand and alternative robust spare parts control levels; and regular disposal of static items.

Cost: Additional stock and missing items, higher cost

The cost of inventory is not only the amount purchased, but also includes storage space, use of funds, maintenance losses and obsolescence; insufficient stock may cause equipment to stop, accelerate procurement and production delays. Compared with spare parts, it can be estimated on a case-by-case basis: annual average cost of holding, loss from single missing items, vendor delivery, and minimum quantity procured.

For example, the supply of generic tightware is stable, alternative conveniences are usually appropriate for filling in terms of usage; if a dedicated control module has a long procurement cycle, missing items affect the operation of critical equipment, and even if annual demand is low, the reserve quantity needs to be assessed. The safe stock is the buffer that is retained to respond to fluctuations in demand or delays in delivery, and cannot be set simply as "a few more " .

The base point can be used as the "average daily consumption x replenishment period + safe stock" and adjusted to actual needs and delivery periods. If the time frame is 30 days, the average daily usage is 0.2 items, with basic requirements of approximately 6 items; a secure inventory will also need to be approved separately based on fluctuations in demand and the consequences of the shutdown, and no illustrative values can be directly considered as criteria for all materials.

Impact: Indicators to be used for inactive and critical management

The equipment is usually not available for long periods of time and the subsequent need is unclear. The enterprise can screen for nearly 12 months or 24 months of access to the warehouse, but the duration should be determined in conjunction with the equipment's overhaul cycle.

Shortfall management can focus on the number of missing items, time-satisfaction rates, emergency procurement ratios and average replenishment cycles. Steam management can focus on long-outstanding inventory amounts, stock turnover days and end-of-life losses. Indicators need to be consistent in calibrated, for example, whether a “shortfall” is an unfilled receipt request or must result in a stoppage, avoiding data that cannot be compared across sectors.

Shanghai-based Select Tech, in its efforts to clean up inventory management issues, will reconcile material coding, inventory records, procurement delivery dates and equipment criticality with the same list. This distinguishes between "goods on account but not found" and "no stocks at all", and facilitates the tracing of duplicate codes, warehouse misplacement and late recording.

Applicable scene: selection of management approach by spare parts characteristics

The requirement is stable, the unit price is lower and the supply of adequate spare parts from a sufficient supply channel can set fixed feed points and reasonable quantities; the demand breaks, more expensive specials are suitable for procurement in conjunction with the overhaul plan, and small quantities of critical spare parts are retained as necessary; the corresponding spare parts for equipment that has been decommissioned should first be verified for maintenance needs and compatible replacement relationships before decisions are made to retain, redeploy or dispose of.

The classification is not appropriate for the amount or number of applications, and technical substitution and stoppage effects are included in the judgement.

Common pits: incorrect accounting, stock-outs and misdisposal of demurrage

The only items that can be filled by historical use are low-frequency, but critical spare parts that are easily missed; the only items that are cleared in monetary terms may be treated as idle.

Another common problem is the lack of uniformity in material coding, the duplication of the same spare parts, which results in the fragmentation of stocks, missing or duplicated procurement. It is recommended that high-value and critical spare parts be regularly counted, that incoming and outgoing goods be processed in a timely manner, and that duty holders and review dates be set for the short-term list.

The actual implementation can begin with key equipment and high-value spare parts, the coding of which is checked against inventory, and then establish classification rules, feeder points and a slow review cycle. Each adjustment records the basis for demand and approval, monthly check changes in stock balances from long unused stocks, and amends parameters over time rather than a one-time significant reduction in inventory.