What are the operational requirements of the rules governing spare parts for equipment?
RFID Knowledge

What are the operational requirements of the rules governing spare parts for equipment?

PublishedShanghai Zejie Smart Technology Co., Ltd.

When equipment is shut down, the warehouse does not find suitable models for maintenance staff, which are often not a matter of stock size but rather of key elements in management rules. The rules governing spare parts for spare parts should cover the breakdown of accounts, demand plans, procurement acceptance and inspection, storage custody, requisitioning maintenance, inventory disposal and accountability records, and clear approvals, vouchers and time frames for each step.

Search for a piece of spare parts first, to clear the scope and accounts

A pump requires the replacement of a seal, and the warehouse labels contain only “sealed rings” that do not confirm size, material and suitable equipment.

When it prepares the management requirements, Shanghai Selecting Tech Ltd. will examine “material name, applicable equipment, stock location, stock level, responsible position” as a base field; full field is easier for field personnel to find from their books.

Demand for access to warehouses: certification of procurement and acceptance

The rules should specify who can apply for the production or maintenance, who will review it and how to re-enter the records on an emergency basis. The application must indicate at least the material code, quantity, use, time of demand and corresponding equipment; where alternatives are involved, technical confirmation is required and cannot be replaced by a direct replacement based on mere appearance similarity.

The procurement process is carried out under the approval authority, checking orders at receipt, and vouchers for delivery, quantity, specification and appearance. For material subject to warranty, batch or special storage requirements, the authorization period shall be registered, the validity period and the conditions of storage; shortages discovered, missents or damages should be isolated and differences recorded, and the processing opinion confirmed before recording in the accounts. The receiving and inspection records must relate to the request and the purchase documents, so that the “goods arrived, the account did not follow”.

From access to inventory: complete for each stock change

When the maintenance staff receives the application, complete the receipt record with the approval process, indicating the equipment or worksheet, the number, the recipient and the date; if the unused items are returned, the warehouse checks the status and then the library is returned. If old pieces are removed that need to be repaired or fault analysed, they should be individually marked and recorded for destination, and cannot be re-recorded as available stocks directly.

System landing: Record-checking of results

Once the rules have been completed, a complete spare parts acquisition process can be used for on-site verification: from application to approval, out of storage and inventory, and then a test check is made to see if physical labels are consistent with the location in which they are stored. The results of the inspection should indicate the responsible position, the reorganization matter and the completion period; the upper or lower limit of inventories, and the change in clearance authority or inventory arrangements, the system and forms should also be revised simultaneously.

An enforceable protocol for the management of spare parts for equipment, not just "do what," but also to write down "who does it, on what basis, and what records." First, file, rights and inventory rules, then check through receipt, access, count, on a continuous basis, so that misdirections, omissions and long backlogs can be reduced.