How do we plan to manage spare parts storage? Layout and process design
The core of the spare parts warehouse management programming is to treat "show" and "process" as a two-way design task — an unreasonable layout, and a poorly run process; and the unconnected, more and more messy, if the process is not closed. The main thing to judge is whether it works, and whether it answers three things: where it is, who controls it, how it goes.
First, think first: Is the plan a self-program or does it involve an outside team?
Many people have been given the task of "Reservant Spare Parts Management Program," and the first reaction is to find a template on the Internet. It's really worth thinking about another thing before we do it – who leads this program, who implements it.
The advantage of self-programming is to be familiar with the details of their business, and the low cost of communication; the disadvantage is that they can easily "manage" to put existing practices into systems, leaving out the elements that could have been optimized. The advantage of asking outside teams is that they can bring cross-practice experience and objective perspectives, and the disadvantage is that they need time to do demand research in the early stages.
The criteria are straightforward. An in-house plan is enough if the warehouse is no larger than 500 m², has no more than 2,000 SKUs (stock keeping units), handles a relatively narrow range, and has one or two people who know warehouse operations. If the warehouse is bigger, has over 10,000 SKUs, or requires equipment investment such as high-bay racking or automatic sorting, have an outside team review the plan at least once. You can still write it in-house.
II. How to land layout design: selection of flat partitions and storage methods
The layout is designed to answer only one core question: where each spare part is placed and why it is there.
Functional Partition
The spare parts bank of a medium-sized plant is usually divided into four areas: the waiting area, the qualifying area, the unsatisfactory area, the shipping area. The waiting area is to be located close to the entrance to the warehouse, facilitating the first time after unloading; the eligible area is the main area, which is to be redivided by type of item, such as mechanical, electrical, hydraulic, material, and vulnerable area; the non-qualified area is to be set up independently to avoid confusion with the eligible goods; the consignment area is to be located near the export point and reduce removal distance.
Storage Method
Common options are a flat shelf, a staggered arm shelf, a attic-type stereo bank, and a fully automated stereo warehouse (AS/RS). A smoother shelf is low in cost, suitable for many items but small parts of single SKU; a stairbar is suitable for long bare materials such as pipes, stylings; a stairwell space is well used for skunking, with high capacity for SKU size but small single size; a full automatic stairware store is most efficient, but the monolithing is worth millions of dollars, more suitable for large manufacturing enterprises or third party logistics centres.
When planning for the service spare parts bank, Shanghai Alternative Technologies usually recommends a combination of "Standing Garment + Attic Stereotycee" - high-frequency access standards - with a leveled shelf, low-frequency but spaced spare parts on top. The advantage of this combination is that it can be controlled, while taking into account space utilization.
Channel Design
The main corridor is recommended to be no less than 2.4 metres wide, which will facilitate forklift traffic; access between shelves is determined by the means of handling, with a cart carrying 1.2 metres sufficient and an electric bottle forklift taking 2.7-3 metres. The passage is narrow enough at that time, and it does not see problems, and when the equipment goes up, it will be full of crusters.
III. How the process runs: access to and exit from the library, and the design of the inventory link
The process design aims to provide for clear responsibility and operational standards at each step, with a trace of events to specific points.
Repository Process
The normal five-step procedure is to register the goods for a visual inspection and check-in, if necessary, to enter the library and update the billboard. Each step is to write who does it and what records are left. Technical check-up involves parts that need to be tested, such as bearings, seals, electrical components, which require delivery to the mass inspection department or third party testing agencies, and which do not have the right items to enter the non-conforming area directly.
Out of the library process
The collection is to be filled with the receipt form and the emergency recovery of the library. The receipt document is to be checked out, the signature is complete; the urgent recovery of the warehouse is to go through the "out-of-the-post" process -- first record the billing, then then make up later, but after that, it does not last more than 24 hours, otherwise the account will become more and more messy.
Inventory Process
The three-tier system of accounting is recommended. The monthly self-assess is done independently by the bank manager, with a rate not less than 20 per cent of the total SKU; the quarterly interdiscretion is attended by other departments, with a percentage of no less than 50 per cent; the annual total must be cut off or cut off, with a 100 per cent ratio. Difference processing requires clear reporting mechanisms: individual differences exceed set thresholds (e.g. $5,000) and must be reported to department heads; cumulative discrepancies exceed 0.5 per cent of the total monthly inventory, with specific counts activated and reasons analysed.
How to code and mark: the material coding and positioning system
The coding system is the "language" of the spare parts store. The code is all messed up, and the whole store is gonna be messed up.
Material code
It is recommended to follow the two-part structure of the "Class Code+Fleming". The classification code indicates a large class with 2-3 bit letters or numbers, e.g. 01 for mechanicals, 02 for electricals, and 03 for hydraulics; the flow number is numbered in sequence with 4-6 bits. The full code example: 01-000123, the first two for classification, and the last six places are streaming.
Three rules for coding are non-negotiable: uniqueness, with one code per material; permanence, with no reuse after a material is discontinued; and scalability, with enough room for future sequence numbers. One item may be 'Motor A' in purchasing, a 'gear reducer component' in production, and a '1.5 kW three-phase motor' in the warehouse. Standardize coding company-wide or the records will never reconcile.
Marking and positioning
Every storage location needs a clear location label. A common format is zone–row–level–position. A-03-02-05, for example, means position 5 on level 2 of row 3 in zone A. Place labels consistently on the side or beam of the rack, use clear lettering, and keep them visible when stock is in place. Put barcodes or QR codes on materials and locations for easy scanning at receipt and issue.
V. PILLIES THAT ARE EQUIPABLE: A few common problems in development and implementation
The first pitfall is focusing on hardware and overlooking workflows. Many companies spend 80% of their planning effort choosing shelves and systems and devote only half a page to procedures. The shelves go in, the process doesn't work, and the stockroom stays disorganized. You need both equipment and a workable process.
The second pit is to ignore the safety inventory and the undepressed material. The speciality of spare parts stores is that many materials are for emergency use, which is not normally needed but cannot be lost at a critical time. The programme must clearly state the safe stock levels (generally set at 3-6 months of usage) for each type of spare parts, as well as the disposal process for the undepressed material (soft parts that have been unused for more than 12 months), otherwise the warehouse will soon be filled with backlogs.
The third is to lock the project in the cabinet. The program is written without training, without exercise, without examination, and the person who implements it knows nothing about it. The program must have at least one full-time training before it goes online, and the key process has to do a simulation exercise, and the problems identified during the exercise are revised.
VI. Programme not completed: continuous optimization after on-line
After rollout, review every six months. Track count accuracy, issue response time, and the share of slow-moving stock. At least 99.5% count accuracy is reasonable; below 99% indicates process gaps. From requisition to dispatch, regular orders should take no more than two hours and urgent ones no more than 30 minutes. Keep slow-moving stock below 5%; above 10% warrants a dedicated cleanup.
The optimisation program is to be put on the point, not to push back. Each time it is adjusted to one or two specific issues, and accumulates over a year, it becomes a real fit for the firm, which can use it. The preparation of the spare parts store management program is not essentially a document, but a re-combining of the four elements of "Man, Goods, Field, Process." Write more about the details of the landing, and then there are fewer pits to drop.