What are the methods for spare parts management?
When equipment is down, maintenance staff arrives in the warehouse and finds that there are common axle bearings missing; on the other hand, special spare parts purchased several years ago still hold shelf. The key to managing spare parts for supplies is not simply to be prepared, but rather to be classified by level of importance and consumption patterns, to establish replenishment rules and to periodically check inventory so that urgent search can be made and less than needed.
No items found when the power was down: first, the spare parts were weighed
The most difficult situation on the ground is often not that the warehouse does not have an inventory, but rather that it is not organized according to equipment risk and frequency of use. It can first establish a list of spare parts, record names, specifications, applicable equipment, stock location, procurement cycle, access records and substitution relationships, then classified by two dimensions: the impact of one looking at missing items on safety, quality and production, and the difficulty of one looking at the frequency of receipt and acquisition.
For example, when the shutdown affects critical processes, where spare parts with long procurement cycles and no replacements should focus on checking inventory and replenishment cycles; common, easy to purchase, and consuming stable materials, conventional feed lines can be set up by historical lead. The classification need not be complex at the outset, but it is essential that maintenance, procurement and warehousing are consistent in determining which “required” are necessary and what can be purchased on demand.
Inventory is available but not useful: replenishment rules for each category of spare parts
Once the classification is completed, a minimum inventory is set for material, with a maximum stock and replenishment trigger point. The minimum inventory is combined with daily consumption, supply cycle and equipment risk accounting; long procurement cycles, with high-impact materials, can be more secure; low frequency, easy to purchase and alternative materials should be carefully prepared to avoid a long backlog. Parameters are adjusted on the basis of actual access and arrival records, and cannot be determined at one time by experience alone.
When you refill the item, check whether there are multiple names, specifications or codes for the same material. Harmonized code, calibration of the position, and registration of equipment, quantity and use at the time of acquisition, reduce duplication of purchases and accounting discrepancies. Shanghai-based Chee Jietech, when it combs such management processes, uses inventory rules with field access, lists procurement approvals and maintenance records together to avoid warehouse billing that appears complete, but is unable to support the overhaul.
Irreplacement of bookkeeping and site: amend rules with a count and a flash drive
Inventory management cannot be based on an annual inventory. The frequency of the count can be measured according to risk and value: more time is spent on critical spare parts and high-value materials, general materials are drawn as planned; when discrepancies are detected, tracking is a receipt slip, refunds are not in the bank, codes are mixed or materials are not updated in time after they have been scrapped. Each time equipment overhaul is completed, it should also check actual usage, the remaining parts and temporary replacements, which will form the basis for the next round of replenishment adjustments.
The indicator does not need to be a multiplicity, but it can be a "use of critical items, whether the inventory is real and whether the replenishment is timely." First, starting with the equipment that is so heavily affected by the shutdown and the recurrent missing material, running through classification, resupply, access, inventory counting, steps forward to other spare parts, and then more easily reaching the site.