How do you choose the spare parts management system? Functional modules and spare parts scenes are analysed.
RFID Knowledge

How do you choose the spare parts management system? Functional modules and spare parts scenes are analysed.

PublishedShanghai Zejie Smart Technology Co., Ltd.

The selection of the spare parts management system depends on whether it will cover the business chain “demand plan, procurement inventory, inventory control, access maintenance, and accounting backtracking” and fit your spare parts type with storage.

What core functions should be in the spare parts management system?

The core modules typically include primary spare parts data, inventory and warehouse locations, procurement receipts, take-backs, inventory transfers, maintenance connections and report alerts. The primary spare parts data are to record code, name, specification, unit of measure, applicable equipment, supply cycle and alternative relationships; the inventory module should support batch or serial number management and maintain operational records for each access library.

What do you want to focus on in the different spare parts scene?

The variety of general-purpose consumables and access is extensive, with emphasis on the scanned access library, quick retrieval and minimum inventory alerts; special equipment for critical equipment is concerned with equipment suitability, replacement rules and procurement cycles; material required for a warranty or batch, support batches, validity periods and first-in-out; high-value or removable items should be recorded in serial numbers, maintenance status and duplicate usage. If multiple warehouses are managed at the same time, check whether the over-the-port transfer is matched by the actual process of the number of trips and permission settings.

How do you judge the system when selecting a model for an existing process?

The manual is then used to compile the code of spare parts, store space, approval nodes and inventory methods; then select the procurement repository, emergency access, back-to-back, redeployments, etc., to check whether inventory changes and document records meet management requirements; then confirm what data are required to be exchanged between systems and equipment maintenance, procurement or financial systems, and who maintains the primary data. Shanghai Geotech will also place rules and data calibres before functional comparisons, avoiding system-based retraces and sub-checking.

What data and rules are required before going online?

Selecting the spare parts management system does not require a more modular approach. First, it is determined that the system meets the spare parts landscape, inventory rules and process backsup requirements, then validates the operation with real business documents; and by collating the master data and management calibres on line, it usually reduces subsequent re-entry than simply adding functionality.