What are the elements of the spare parts management approach?
The management of spare parts is understood as “the storage, repurchase and repurchase of spare parts”, but a complete management approach provides for what, who to take care of, when to replace, how to access, and how to handle the morbidity and end-of-life. At the heart of the system is that it match the number of spare parts with equipment maintenance needs and that each flow is recorded and traceable.
I. DEFINITION OF THE COMPLIANCE OF THE GUARD AND THE PRINCIPLES OF RELEVANT
The system should first clarify the scope and then establish classification and management requirements. Common classifications include classification by equipment, degree of importance, procurement cycle and storage conditions; different classifications, and different inventory control and approval requirements.
- Key spare parts:The lack of such a situation could affect security, continuity of production or the recovery time of equipment and should focus on the approved inventory and replenishment cycle.
- Common spare parts:Demand is more stable and can be defined by setting a threshold for inventories in relation to historical lead, procurement cycle and supply.
- Low frequency or special purpose spare parts:The low number of usages and the narrow range of suitability require an assessment of procurement cycles, alternative and long-term idle risks.
The system should also specify the number of spare parts codes, names, specifications, applicable equipment, units of measure and storage conditions. The code is consistent with the list of equipment, procurement records and inventory tables in order to reduce the miscollection of different specifications or similar parts by the same name.
Stock standards to explain “why so many”
The spare parts inventory cannot be set on an empirical basis alone. Standards should be developed in conjunction with the importance of equipment, the impact of malfunctions, historical consumption, procurement lead times, minimum order levels and storage periods. The lead time for procurement is from the time when a demand is raised to the time that spare parts are available; the longer the cycle, the greater the impact of the shutdown, the more it becomes necessary to assess the security stock.
The management approach may provide for a minimum stock of each spare part, a maximum stock and replenishment trigger point, with clear approval and adjustment responsibilities. For example, when stock is reduced to the replenishment trigger point, demand is made by equipment or maintenance positions, warehouses check existing and in transit, and procurement posts are then subject to approval authority. If equipment is modified, maintenance strategy changes or backlogs continue, stock standards should be reassessed rather than the old values being used over time.
In preparing the content of spare parts management, Shanghai Selecting Tech Ltd. will separate “the factors determining the stock levels” and “who has the right to adjust”, avoiding a single number without any basis or maintenance responsibility.
Processes to cover the full life cycle from demand to end of life
Each step should include a description of the responsible position, the required record and the manner in which the unusual is handled:
- Requirements and procurement:Use of the department to specify the name, specifications, equipment applicable, quantity and reasons for the requirement; approval authority to verify inventory, purchase orders in transit and budgetary authority to decide on procurement.
- Revenue pool:The warehouse checks the quantity, model, appearance and accompanying information on the basis of purchase orders and technical requirements; non-conforming or damaged spare parts should be marked separately and the results of the disposal recorded.
- Custody and inventory:The contents of the accounts are checked with physical details.
- Access and Backward:The requisitioning form records the recipient, equipment, use, quantity and date; unused spare parts are checked back to the warehouse and are returned to stock after eligibility and the unqualified items are treated separately.
- - Immodity and staleness:Assessment of long-outstanding, unsuited or beyond the useful storage period, consideration of redeployments, reversals, maintenance utilization or end-of-life and maintenance of approval and disposal records.
IV. STANDING OF THE BORDER DELEGATION PROCESS
The management approach should avoid the responsibility of simply “the relevant department responsible”. Equipment or maintenance functions are responsible for providing technical requirements, confirming suitability and feedback on consumption; warehouse posts are responsible for receiving and sending, keeping, desk and inventory; procurement positions are responsible for requesting and obtaining bids based on the results of approvals, placing orders and tracking; finance posts are subject to the enterprise system for processing procurement and inventory transactions; department heads or approving officers are responsible for reviewing needs, with exceptions to inventories and disposal.
When you land, you can select a type of equipment to create spare parts lists, complete the code, apply equipment, stock standards, purchase cycle and responsibility positions, and then check whether the process is complete by actual receipt and distribution records. The management approach should periodically review inventory discrepancies, procure urgently, and take long-term unused and scrap; these records will help adjust the spare parts standard and allow the system to follow changes in equipment and maintenance requirements.