How is the plant spare parts management implemented? The workshop works with storage
RFID Knowledge

How is the plant spare parts management implemented? The workshop works with storage

PublishedShanghai Zejie Smart Technology Co., Ltd.

The spare parts management of the spare parts are to place requirements, codes, inventory and access in the same process, so that the workshop can be cleared, the warehouse can be located, the purchase can be justified and the equipment risk is used to set inventory rules.

No items found at the time of shutdown: first match spare parts with equipment

The application of the constant card is not based on basic information: the same part is called in a different manner at the workshop, the warehouse is billed by model and the purchase is placed under the drawing name.

The key equipment can be used to create a list of “equipment-parts-parts”. Each spare parts record is unified in name, specification type, unit of measure, location, application of equipment, supply cycle and alternative relationship; for easily confused parts, add photographs or drawing numbers. Code rules should be simple and unique, avoiding writing in code information that is easily changed, such as the location of the warehouse, the supplier.

First, you do not have to finish all the materials at once. First, you cover the impact of the shutdown, and then you buy long-term spare parts without replacements, and expand them by the level of equipment importance. The inventory is checked for suitability by maintenance staff, the quantity and location of the warehouse personnel, the reason for the discrepancy is recorded, and not just the difference between the count is changed to a new number.

Requisition and inventory disjointed: enter workshop requirements into the warehousing process

Once the list is established, the common problem becomes “suspension, not known to the warehouse, procurement and repurchase”. The following should be harmonized: Maintenance or planned review of the associated equipment and spare parts, completion of the failure or cause of the review at the time of application, quantity required, expected time and alternative. The warehouse first checks available inventory, saves the number and order in transit, and then decides whether to requisition.

Spare parts inventories cannot be set on a consumption basis only. Common-use items can be adjusted for replacement points in conjunction with historical frequency and replenishment cycles; critical but low-frequency items, assessing the consequences of shutdowns, procurement cycle and alternative, and then determining whether to reserve. The site can be estimated on the basis of “projected needs over the procurement cycle + safety residuals”, which are calibrated by the plant's acquisition records and delivery cycle, and not by applying uniform ratios.

Shanghai-based Technology Ltd., when combing these processes, puts workshop reports, warehouse warehouses, approvals and procurement in the same chain of business, focusing on who confirms each change of state, where it is recorded. The value of doing so is not to create multiple clearances, but to reduce oral reminders and duplicate requisitions, so that maintenance staff can see what steps are taken to address needs.

Unsatisfactory receipt: maintenance of inventory records by field actions

The transfer of spare parts from the shelf to the equipment is the most likely point for loss of inventory accuracy. Access, exit, and use of clear recording actions by borrowing and scrap, as well as synchronized with associated worksheets or equipment. Emergency repairs can be performed in a simplified process, but only if the quantity, purpose and operator are recorded within the specified time frame; otherwise, the system inventory will gradually deviate from the site.

The warehouse can be used to draw high-risk, high-value or high-frequency spare parts on a fixed-cycle basis, follow up receipt, dispatch, repossess and repositioning records when discrepancies are detected. The storage identification should be consistent with the system, and the whole box should be managed separately from the bulk; for material required by batch or serial number that is valid, record as the corresponding attribute, so that only the total amount is not recorded.

From test run to redisk: Run a device line first

An item of equipment can be selected for test-testing on landing: Identification of the spare parts list and responsible persons, recording of existing quantities and storage points, setting up requirements and access processes, and then checking whether the applicable items can be quickly found with a real maintenance mission. After a certain period of operation, check the number of missing materials, urgent purchases, discrepancies in accounts and idle inventory, adjust the stockings and range of replacement points based on records.

The focus of implementation is not on how many items are recorded at a time, but on the workshop, whether the warehouse distribution and inventory update correspond to the same equipment and spare parts. First, it is easier to detect problems and amend them than to open the entire plant in parallel by making a list of key equipment, responsibilities and recording actions, and then gradually expanding them.