What does the electrical spare parts management system say? Class and storage requirements
RFID Knowledge

What does the electrical spare parts management system say? Class and storage requirements

PublishedShanghai Zejie Smart Technology Co., Ltd.

The core of the electrical spare parts management system is to make "classify, store, desk, account" clear. A landing system usually includes scope of application, a catalogue of spare parts, storage conditions, access processes, inventory cycles and segregation of duties. Below is an article by article.

Point 1: To put together the framework for the classification of spare parts

Classification is the basis of the system. It is suggested to divide it by three dimensions, "Class of equipment + materiality + interchangeability", rather than simply listing it by electrical components.

The catalogue recommends that it be included in the form of a table in the annex to the system, which will facilitate subsequent additions made by way of the same rules.

Element 2: Identification of storage conditions for the various product categories

The following table can be copied directly into the system:

Type Temperature Relative humidity Other requirements
Elementware (PLC module, relay board) 0~40℃ 30%~70% Static, tidal, original packaging storage
Electrical and large equipment -10~45℃ ≤75% The mat is 10 cm above ground, and the axle end is stainproof.
Cables and wires -15~40℃ ≤80% Avoid the sun and no pressure.
Battery types 5~30℃ ≤60% Regular power replenishment and monthly voltage check
Instrument and Sensor 0~35℃ 45%~75% Take it easy, save the accompanying certificate with the file

The reference is based on the GB/T 15464 General Technical Conditions for Instrument Packing and the storage environment provisions in the manufacturer’s product manuals.

Point 3: Storage hardware and marking specifications

The location and marking of the warehouse is an easily neglected part of the system, but it has a significant impact on actual management.

Location and layout of the warehouse

Identification and billboard

Point 4: Access to the library and access process

The more specific the process is, the less obfuscated it is to be implemented.

  1. Applications for applicationsUse the department to fill in the receipt, indicating the name of the equipment, the location of the failure, the number of spare parts required and the quantity.
  2. PermissionsCategory A spare parts are approved by the equipment supervisor and categories B and C by the class commander or engineer.
  3. Out-of-house reconciliation:: Treasury clerk voucher, to check the code, specifications, batches and confirm that it is not damaged.
  4. Registration desk accountsThe desk accounts are updated as soon as the warehouse is released and spare parts A will be synchronized with replacement time and operator in the equipment files.
  5. Back to the rest of the bank.: Unused spare parts will be returned within 7 working days and the income pool will be re-examined upon return.

Point 5: Inventory and life-management

The spare parts are not in use and will also fail, a blind zone for many systems.

We found that, in helping some manufacturing firms to comb the spare parts system, the four steps would reduce the stock of undefeated material from 20 per cent to less than 5 per cent and the time for failure of critical equipment was significantly reduced.

Element 6: Structure and landing of institutional documents

A complete system document, with the following skeletons recommended:

The file length control is more appropriate at 3,000-5,000 words, too short to execute the sample, too long. The corresponding log template for each chapter is attached at the end, such as the spare parts entry and inspection sheet, the checklist, and the recheck log form, which facilitates direct printing.

The last step is to run the system: piloting 1-2 account periods in 1-2 workshops, collecting feedback from the storekeeper and maintenance staff before re-issuing. Shanghai-based Cheeky Waytech usually spends 3-4 weeks consulting clients on the spare parts management system, completing a complete delivery of the catalogue to the billboard template, ensuring that the system can be implemented on the day of its release, rather than remaining on paper.