What are the criteria for the management of spare parts? classification, coding and acceptance requirements
RFID Knowledge

What are the criteria for the management of spare parts? classification, coding and acceptance requirements

PublishedShanghai Zejie Smart Technology Co., Ltd.

The standards for the management of spare parts for spare parts should be clear “what to control, how to identify, receive and accept, and by whom”. A unique code could be created by materiality and use, and would include a statement of arrival check, quality check, inventory record as an enforceable acceptance requirement; they would also cover changes, decommissioning and periodic review.

What should be the elements of the spare parts management standards for the spare parts?

An enforceable standard, usually with a scope of application, segregation of duties, classification rules, coding rules, requirements for procurement and acceptance, storage conditions, access and back-to-back processes, and an inventory and change mechanism. For each requirement, as much as possible, clear the responsible position, check the content and log sheets, and avoid writing " accepted on demand" without operational basis of judgement.

What rules should be used to classify spare parts for the preparation?

Classification is to serve procurement, storage and maintenance decision-making, recommend a combination of use, equipment attribution, materiality and conditions of custody. For example, it can be divided into mechanical items, electrical items, instrumentation and general purpose; then it can be attributed by equipment or system. Importance can be based on the impact of failure, substitution difficulty and procurement cycle in different levels, and clearly define approval or inventory management requirements for grade.

How do the spare parts codes be developed?

The code should be unique, stable, easy to retrieve, and it is not appropriate to write easily variable information into the subject. It can be structured using the " Category Code - Device or System Code - Streaming" structure, supplemented by a name, specification model, graph number, unit, manufacturer type paragraph. For example, if an axis is of different internal diameter or accuracy levels, it should be set up in separate slots, which cannot be distinguished by name only. New material should be re-examined before it is re-examined; specifications replaced, historical records kept when drawings are changed or disabled, and no old codes should be directly distributed to new materials.

What are the spare parts to be checked for when they arrive?

The acceptance and inspection requirements should be based on material risk and technical conditions for procurement, at least checking orders or purchase requirements, physical identification, name, specification type, quantity and accompanying documentation. Key items that affect assembly or safety should also be examined in terms of drawings, technical conditions or specifications, material certification, performance parameters or appearance; items not suitable for field measurements may be verified as agreed documents. Discrepancies in the discovery model, differences in quantity, breakdown of packaging or missing documents are isolated and recorded before the contents are clearly resolved. Shanghai Select Tech, Inc., when combing the management requirements, will match classification, code fields and acceptance records to allow field personnel to search for and check with the same set of information.

How can management standards be maintained?

Select a class of material to be tested, check whether the classification is easy to search, whether the code can distinguish between similar specifications, whether the acceptance form will leave the necessary evidence and then extend it to other categories. Following this, duplicate files can be reviewed on a fixed-cycle basis, long-term unserviceable, replaced and special storage items; equipment modifications or technical conditions change, to synchronize the coding file and receiving and inspection requirements. Standards should be maintained at a clear job level, with revised dates and version records kept, ensuring that procurement, warehousing and maintenance use the same set of valid information.