What about access to spare parts? Documents and acceptance requirements?
The spare parts access warehouse does not have a uniform document format for all enterprises, and is normally subject to the enterprise system that clearly approves approval authority, documentation fields, acceptance steps and reconciliation requirements.
What information is required to record in the spare parts inventory?
The bill of entry should indicate what the material is, where it comes from, who receives and receives, when it is recorded. It is recommended that the name of the material, code, specification type, unit of measure, quantity, batch or serial number, source number, repository location, acceptance result, person and date. For spare parts with warranty period, validity or retroactive requirements, the corresponding date or marking should also be recorded.
When the purchase is made, the entry order is usually checked with information such as purchase orders; when the internal transfer is made, records are transferred out of the warehouse and to the warehouse; when the inventory is withdrawn, the associated original receipt form is linked and the reasons for the return are indicated. The document number should be generated in a continuous or rule-based manner, and the paper document and electronic record should be searchable. When Shanghai-based Selectory Technology Ltd. combes the inventory process, it will encode the material, the document number and the repository location as a priority for checking, reducing misreceiving caused by identical material or similar specifications.
What are the parts to be checked for and accepted?
The receipt and inspection is performed as follows: "Checking the supporting documents, taking an inventory of quantities, checking the markings and appearances, recording differences, and identifying the contents". Checking names, models, specifications and units are consistent with the order or transfer information; taking stock of the quantity received and checking the visible conditions such as packaging, sealing, rust, damage, deformation. For critical spare parts, verification of material certification, examination of records or serial numbers can be made according to the technical requirements of the enterprise; specific documentation requirements should be based on procurement agreements and internal quality systems, not only on overpacking.
If a shortage of quantities, models that are not consistent or unusual in appearance is found, the difference shall be marked on the document, the photograph or examination record shall be taken and the material to be confirmed shall be kept separately from the inventory available; the person with authority shall decide to receive it, withdraw it, compromise its acceptance or reject it. The receiving and inspection officer and the reviewers shall sign or retain electronic confirmation according to their duties, avoiding all critical elements being completed by the same person.
What are the documents to be used for the release of spare parts?
The vault shall have a clear purpose and approval basis, which often includes maintenance lead, production lead, departmental lead, internal transfer and resupply. The release shall record the material code, name, specification, quantity, batch or serial number, use or equipment number, department of access, recipient, approver, sender, date and location of the warehouse. Maintenance will use the related maintenance list; the transfer shall be recorded both for transfer and transfer information to facilitate reconciliation between the two ends.
Checks the approval status, material and quantity, implements the system for first-in-first-out or specified batches; the amount received is confirmed by the recipient after delivery and the warehouse reduces inventory in a timely manner. When spare parts are returned, the state should be checked and the original inventory form linked: Reused for collection and recording after re-entry, damaged or unidentified first sequestered and marked, not directly mixed into the available stock.
How can we reconcile documents, physical and inventory?
The system should identify who applies, who approves, who receives and accepts, who keeps, who keeps the accounts, who keeps the accounts and who handles the anomalies. Each receiving and sending business should be registered simultaneously as far as possible when physical movements are made; if the conditions on the ground do not allow for synchronization, a time limit should be set for the recording of the book count and the original document to be kept. The discrepancy adjustment must be authorized for approval, an inventory list and processing record is maintained. You can first harmonize material code and supporting fields, then press the procurement library, return the warehouse, take over, assign the same scenes to develop the process separately, and check whether the documents can be traced back to the physical and approval basis.

Ms. Lei
Mr. Pang