What steps are included in the spare parts management process?
The spare parts management process usually includes needs recognition, classification codes, procurement warehousing, storage maintenance, access to the warehouse, inventory replenishment and end-of-life retroactive.
Where does the spare parts management start?
The form should record the name or number of the equipment, the name of the spare parts, the specification type, the quantity, the time and purpose of the request. The need for any shutdown risk may be prioritized and the basis is justified to facilitate the approval officer's assessment of the urgency.
Each spare parts should have an identifiable name, specifications, applicable equipment, unit of measure and location of storage; the same spare parts should avoid re-suppling by different calling. For critical spare parts, the supply cycle, the replacement relationship and the minimum stock terms are the reference quantities that trigger the replenishment, which should be set in conjunction with actual consumption and procurement cycles, and it is not appropriate to apply a uniform value directly.
What is to be reconciled between the acquisition and warehousing of spare parts?
A request for procurement shall be reconciled with the availability of inventory, quantity not available and maintenance plan to avoid duplication of procurement. After approval, the purchase plan is followed by a check of the name, model, quantity, appearance and consignment information upon arrival; spare parts whose quality or specification is in doubt are marked separately, and confirmed to meet requirements before being entered into the warehouse. The entry records contain at least date, quantity, batch or serial number (where applicable), acceptance results and location of the receipt and inspection.
When you store it, you place it in accordance with the spare parts characteristics, and you keep appropriate protections such as tidal, dust, rust, etc., and keep the label clear and account-to-account. In combing the spare parts management process, Shanghai-based Select Tech recommends that the "Access and Acceptance" and "Putting Up Physical Up" be used as two inspectionable nodes to avoid system records being entered into the bank, but not physical material being found on site.
What are the rules for the receipt, inventory and replenishment of spare parts?
The application for the application should be made on a maintenance or receipt basis, check the spare parts, quantity and applicable equipment and exit the warehouse, and register the recipient, use, time and destination in a timely manner. Refunds must be checked for condition, confirmation of availability and re-establishment of stock; used, damaged or pending items should be recorded separately and not directly counted into available quantities.
The inventory can be performed by value, criticality and frequency-seting cycle of spare parts, after a discrepancy in the accounts is detected, reviewing the receipt and delivery records and then adjusting them to the authority. Spare parts that are held below the filling point for long-term unused or unsuited equipment are initiated; and, when allocated in conjunction with maintenance needs assessment, replace or scrapped and keep disposal records. On arrival, you can first identify the person responsible at each step using a process list, voucher, system recording and unusual treatment, and periodically check implementation.

Ms. Lei
Mr. Pang