Start with a roller-down.

When a plant asset inventory was performed last year, it was typical: the number of equipment recorded on the books, often not matched by physical matches in the workshop -- some numbers were removed, others were already dismantled to other production lines, and the system was not updated. The central issue of full-process management of assets is here: from the time of acquisition to final disposal, there should be data at every node, but many enterprises would only have to purchase one time of the time of the system, and then leave it alone.

The asset-wide process management system addresses these nodes by linking them.Demand and procurement, receipt and inspection of inventory, routine access and change, maintenance, regular inventory count, end-of-life disposalSix phases, each with corresponding data control points, ensure that the books and objects are always matched.

Database entry: where data enter the system

The most basic questions to be answered by the library are:Who was this device, when and how much it cost to get in here?。

Data control points typically contain four types of information: asset number (usually generated automatically under the "Sector-Category-Serial" rule), procurement order association (contract number, supplier information), receipt and inspection records (date of arrival, recipient, acceptance status), initial cost recognition (procurement price, freight costs, installation debugging fees, etc.).

There's a place where it's easy to step on: many businesses only record purchase prices, but the initial cost of assets should include ancillary expenses. We have approached a client who does precision machine processing, and the contract price for one device is 800,000, because an additional 120,000 unrecorded was spent on commissioning, and the depreciation base was almost 13 per cent short, which affected several years of costing.

Access and change: the most easily disturbed link of data

The entry is only the beginning. Once an asset enters the business, it undergoes multiple state changes in access, transfer, loan, and return, each step should leave a data trail, otherwise the annual inventory will be problematic.

The point of control design for this segment answers a few questions: Who received the money? Where did the assets go? Did the system be updated simultaneously after the change? Did the change go?

In practice, many businesses have changed their assets by oral notification or Excel form, and it is only when inventory counting finds out that "The system says Workshop A, actually in Branch B." The common phenomenon we observed during our visit was that more than half of the changes were not completely traceable, which is the largest source of discrepancies.

Repairs and maintenance: cost-blind areas that are often neglected

These data will be generated from maintenance records, maintenance plans and spare parts replacements during the use of assets.

The points of control over the repair chain include: failure report (time for call, failure description), maintenance process record (maintenance staff, length of maintenance, replacement of spare parts), cost aggregation (worker, spare parts, foreign association costs), maintenance plan implementation (maintenance cycle, last maintenance date, next maintenance date).

The complete maintenance data help businesses to calculate two things: the full life-cycle cost of a single device, and what is going on for "high maintenance" that requires early consideration. Asset management tends to ignore this hidden expense if it looks at only the original book value.

Inventory and inspection: a verification mechanism for matching accounts

The purpose of the inventory was not to "count clearly how many assets" but to discover the differences in the accounts and trace the reasons.

The data control points are supported at this point: the inventory task is automatically distributed by department or asset class, the mobile end-cleaning code count (reduces manual entry error), the bookbook and actual book numbers are automatically compared, and the process of processing the balance sheet deficit (cause analysis, liability determination, account adjustment).

One common point of step is that when the inventory is completed, only the book data are changed and no cause of difference is recorded. Next time, the same problem will recur. The complete inventory process should be "Pre-task, there's a sweep, there's an analysis."

Disposal and exit: final step in the closed circle

If the asset reaches its useful life or is unable to continue, it will need to be disposed of.

The points of control at disposal include: end-of-life applications and technical validation; approval process (departmental request, technical clearance, financial audit, leadership clearance); residual disposal (sale, recovery, destruction); account processing (reducing assets; write-off of accumulated depreciation).

Some enterprises also have on their books equipment that was phased out years ago, and the cumulative amount is not only small but also high if they are processed and settled in a timely manner.

How do we really tie these nodes together?

The question of returning to the initial inventory of the rollover was not one of a certain chain that had been wrong in nature, but rather of a lack of communication between the links.

The design philosophy of the asset-wide process management system is to make data available for each node, and each data is accountable, and every change can be traced. A qualified system should have several features: full node coverage (no break points from procurement to disposal), preset data control points (fixing check before problems occur), mobile end-adaptation (discussions, inspections, maintenance requires on-site operations), interface with financial systems (auto-feasance changes generate vouchers).

When you consult with Shanghai-based technology for asset management, you usually help your client to comb through the current process break points and then design data acquisition rules and approval nodes for each break point. The advantage of this approach is that the system functional modules are not designed in a vacuum, but are based on practical operational issues.

And finally, if you're thinking about a go-live full process management system, you might want to do a "process check" -- list all the steps from entry to exit, see what has data records, what doesn't, and then choose the system after finding break points, which is much more practical than buying a software directly.