What modules are included in the equipment spare parts management system?
Last winter, a precision injection molding plant ran into a problem. At 2 a.m., an imported production line suddenly reported a fault. The technician took it apart and found that a seal on a core component had worn through. Staff searched five warehouses and found only three seals with the same specifications, one of which turned out to be the wrong size. By the time the replacement arrived from out of town, the line had been down for more than 30 hours. The plant then decided to implement an equipment spare parts management system. The following feature guide draws on the problems it encountered and the modules it defined afterward.
A complete spare parts management system, the core modules usually include: basic information management; inventory management; equipment and spare parts linkages; procurement and early warning; report analysis; rights and mobility synergies. Each module addresses a specific issue, which is in order to be complete.
From "Remember" to "Just Check."
Many factories used to manage spare parts, relying on teacher-sensei's memory: what kind of equipment a part has on, how many in the store, when it was changed, and how many people have it all. New recruits are slow, and older people can get out of work.
The first thing the system has to address is to have all basic information on spare parts entered and standardized.
- Spare parts code: Auto-generated unique numbers by certain rules, such as "class-specify-year" combinations to avoid renaming and confusion
- Classification and attributes: Key parameters, such as recording specifications, materials, applicable equipment, under each category, by broad categories of machinery, electrical, hydraulic, and consumables
- Vendor files: vendor contact information, quotations and procurement cycle for each spare parts centrally maintained
- Pictures and documents: uploading of physical maps, instructions, drawings for identification purposes
Once it is completed, each spare part is like an "idid card" that opens the system and shows what it is, where it is and who supplies it.
Inventory management: access to and from the warehouse, automatic alert for secure inventory
The problem is that the actual inventory and booking stock are not matched, and a number of missing and numerous items were identified at one time for reasons unknown.
The core of the inventory management module is "conformity" and "whenever it has to be." The specific features include:
- Access to the library: access, return, transfer, end-of-life, each step of the process is coded or filled out and systems automatically increase or decrease inventory
- Location management: which shelf, which compartment and which box each spare parts will be located by the sweep
- Security stock set-up: minimum and maximum stocks for each critical spare parts, below lower threshold automatic alert
- Inventory function: Supports fast-track inventory by region, category and differences automatically generate pending orders
For example, one plant sets safety stock at ten units for a commonly used bearing. When issues bring stock down to eight, the system automatically alerts the buyer so the next person to need a bearing does not discover there are none left.
Equipment and spare parts: know which equipment this is on
The difficulty with spare parts management is not just "what's in the warehouse," but more importantly, "which equipment it should be, how long it should be, and when to change."
The equipment linkage module is to be achieved by establishing the equipment BOM (i.e., which spare parts are the unit ' s composition and the number of spare parts) as follows:
- Equipment desk account: separate files for each critical equipment, recording model, location, date of commissioning, responsible
- Spare parts list: each equipment includes all spare parts that may be used, including quantities, specifications and replacement cycles
- Replacement records: All traces of spare parts, who replaced them and how many hours of operation were left per maintenance
- Life-long early warning: advance reminder of spare parts that are on the way to replacement cycle based on operational time or number of times used
The maintenance staff then received the work order and could see directly what the equipment had been changed and which items were to be brought with them this time, without any further empirical speculation.
Procurement and early warning: spare parts are delivered before they are required
The procurement module is not a simple "next purchase order" but a line of demand, approval, orders and receipt.
Typically, the process is: inventory below safety line or equipment life warning triggers, systems automatically generate procurement recommendations, buyers confirm orders, suppliers confirm shipments and then code them into the warehouse. The system tracks the order status, and automatic prompting occurs when delivery does not occur.
For some critical spare parts that require a long lead-time import or procurement cycle, the system could also set up a separate "early warning period", such as a 60-day reminder to start delivery and avoid stalling work because of long supply cycles.
Analysis of the report: Money spent with clarity and understanding, data is in order.
The report analysis module consolidates the scattered data into visible indicators:
- Stock turnover: which spare parts are used quickly and which are kept at a perennial level
- Cost analysis: one year of spare parts expenditure per unit, total purchase value per spare parts
- Statistics on stock shortages: which items were frequently missing and how many productions were affected during the past period
- Vendor performance: timeliness, eligibility rate, horizontal comparison of prices
Through these statements, managers can look at "Where money is pressed and where it can be saved." We have seen a factory that has cut off over 200 long-lived spare parts through stock rotation analysis, releasing hundreds of thousands of dollars from the inventory funds alone.
Permissions and moves: multi-positional collaboration is not compromised
The last two modules, although "infrastructure", were not available without their entire system.
The rights management module: Different jobs see different data and operate with different approvals. For example, a warehouse manager can only enter access to the vault, and a purchaser can order an order, which requires a supervisor to approve the amount above a certain amount. This prevents error and facilitates subsequent retroactive action.
Mobile-end module: Many operations are now done by mobile phone or PDA. The maintenance worker is in the field to scan the receipt, and the inventory is cleaned with the device, the warehouse is available without a computer, the data is synchronized in real time to the system, and there is no delay in "the daytime record of the count" at night.
How do we get this system used?
Back to the exact retrofit factory. It took two weeks to get all the basic data on spare parts in, link the equipment account and the spare parts list, then start with the two most painful modules of inventory management and early warning, and then gradually start with the procurement module and report analysis in three months.
If you're introducing a spare-parts system, first decide what problem matters most: finding parts, unreliable counts, or uncontrolled purchasing. Roll out by priority instead of trying to do everything at once. Across manufacturing projects, Shanghai Zejie Technology Co., Ltd. has found that getting master data and inventory right usually solves about 80% of day-to-day problems. Add the other functionality over time.
Spare parts management is essentially a "remediation" exercise. Set the rules, get data recorded and run the process smoothly, and the value of the system will naturally come out.

Ms. Lei
Mr. Pang