What are the elements of the equipment spare parts management approach? Responsibilities and operations
Equipment spare parts management, core is to write "who is responsible, whatever, when, how, how and how." The system covers at least the segregation of duties, the classification and coding of spare parts, the needs plan, procurement and inspection, stockkeeping, access to a vault, inventory disposal and record-keeping; specific storage parameters should be established on the basis of equipment importance, procurement cycle and actual consumption, and not directly using uniform values.
Point 1: Clarify scope of application and job responsibilities
The scope of equipment, spare parts and warehouses to which the system applies is defined and responsibility is assigned by process, avoiding “accessed, unrecorded” or “required, unaudited”.
- Equipment Management:Establish lists of equipment and spare parts, determine the type of aircraft to be used for spare parts, criticality and replacement, and review technical specifications.
- Use area:Remittances requirements, indicating corresponding equipment, malfunctions or maintenance plans; and receipt, installation and feedback on unused spare parts as required.
- Warehouse management posts:Responsible for receiving and checking, holding and maintaining the shelf, recording access to and from the warehouse, early warning of stocks and periodic inventory counts.
- Procurement and approval posts:Procurement is based on approved requirements and inventory; where specifications change or overbudget is involved, internal approval authority is applied.
- Financial or asset management posts:The amount of inventory, end-of-life clearance and accounting records are reconciled with the enterprise system.
The system should also assign a job substitution arrangement and approval authority, for example, who can approve emergency access and who will review the differences. When designing such management processes, Shanghai-based Technology Ltd. will apply responsibility to specific posts and document nodes, which will facilitate day-to-day implementation and traceability.
Element 2: Establishment of spare parts inventories, classification and inventory parameters
Each spare part shall have an identifiable code and basic information, at least the name of the record, the specification type, the equipment to be applied, the unit of measure, the location, the supply period, the custody requirements and whether or not it is replaced. The coding rules shall remain stable and avoid re-settling the same item by different description.
- By level of importance:The key parts, commonly used spare parts and general spare parts can be distinguished. The level of criticality can be judged in conjunction with the consequences of failure, the impact of equipment shutdowns, the procurement cycle for spare parts and the availability of replacements.
- Sets the threshold above and below inventory:The site can be adjusted for actual consumption and supply fluctuations by reference to “expected demand over security stock during the procurement cycle”.
- Distinguishing between special and general:Specialized packages should be associated with specific equipment models; generics could be managed in accordance with uniform specifications, but with the recognition of suitable conditions such as size, material, electrical parameters, etc.
- Identification of retention period:For items such as rubber, seals, glues and other things that may be ageing or for which the validity period is required, batches and maturity information are recorded and scheduled to expire first under the applicable conditions.
Inventory parameters are not fixed once. Reviews are conducted monthly or quarterly on the basis of access records, downtime, procurement cycle and inactive inventory; where historical data are not available, records can be started with key equipment and high-frequency consumption items before they are progressively calibrated.
Point 3: Processes of procurement, acceptance and archiving as verifiable
The requisition should specify the name and specifications of the spare parts, quantity, applicable equipment, date of need, existing inventory and reasons for application.
- Users submit demand, warehouses verify available stocks, quantity in transit and quantities reserved.
- Equipment management positions are checked for specifications, fitting equipment and replacement options, and the procurement position is subject to approval.
- Check orders, delivery certificates and objects after arrival, check the type, quantity, appearance, certification of qualifications and necessary technical parameters.
- The receipt and inspection are followed by the entry into the bank of the batch, date, quantity, location and operator; items that do not meet the requirements are first isolated and the results recorded.
The acceptance and inspection requirements are set by the characteristics of the item: standard packages focus on checking specifications and quantities; key components, such as electric machines, sensors, etc. can add placard parameters or functional checks. Items involving quality documentation should be stored in connection with the corresponding batch.
Point 4: Regulation of access, retrenchment, inventory and end-of-life
The warehouse is issued as a single material and the inventory is reduced in real time; spare parts that are not used or removed, are either re-deposed after a status check or are awaiting inspection and cannot be reissued as a complete stock.
- Inventory count:The differences are determined by identifying the reasons and adjusting them to the authority.
- Unreserved stock disposal:Regularly check long-outstanding items, check whether equipment is still in use, whether specifications are changed and if there is a risk of redeployment across the equipment before deciding to retain, redeploy or request disposal.
- End-of-life management:For spare parts that are damaged, obsolete, technologically obsolete or unsuited, the name, quantity, cause and audit results of the records are recorded; no direct write-off or disposal is permitted without authorization.
- Record retention:Procurement, acceptance and inspection, warehousing, access, repossession, inventory and end-of-life records should be able to match the same spare parts code to facilitate tracking of inventory changes.
Once you land, you can select a key item for commissioning: create a list of spare parts, execute the request and application register, reconcile the accounts on a monthly basis, and adjust parameters based on the discontinuation of missing items, emergency procurement and idle stock. Writing in duties, documents and review cycles will generally help to reduce management errors more than simply increasing stocks.