How does the RFID asset inventory system work? Functional modules and workflows
What is the RFID asset inventory system? Better than traditional inventories?
RFID (Radio Freencia Identification, Radio Frequency) is a technology for identifying objects by radio waves. When each asset is labelled electronically, the only number is in it, and the close to the reader can be read out, without being scanned in one-on-one like barcodes. The system does what it does is to combine these labels with the back-office asset database, so that machines can read and check them in bulk.
The traditional manual inventory is a paper list with a bar-coded gun, and it's normal for two or three people to spend the whole day on a thousand items of assets, and it's easy to miss the disk, and it's wrong. The RFID asset count turns into a mass machine reading: handheld through the shelf, hundreds of labels can be identified in seconds. We've been exposed to the machine-processing plant project, and the monthly time taken after introduction of RFID is usually at half or less, and there are significant gaps.
What functional modules do systems typically contain?
A land-detainable RFID asset inventory system typically consists of six modules:
- Label Management: The only EPC code (i.e. the label “ID number”) assigned to each asset supports mass printing and batch writing.
- Handheld CD Terminal: Industrial PDA with an internal RFID module, which the inventory clerk can read in bulk by walking around the warehouse.
- Fixed Reader: Acquires on the warehouse entrance/exit or access, and automatically identify assets in and out without manual operation.
- Asset database: Base information on the name of the asset, the department to which it belongs, date of purchase, original value, location of storage, etc.
- Inventory Task Management: Administrator creates an inventory task (by region, by department or by global), designates the executing person and sends it to the handheld.
- Data interfaces: Synchronization of asset data with enterprise-existing ERP, financial systems, OA interface.
Small and medium-sized projects need not be broken up as soon as they are ready, and the three components of backstage management, tasking, interfaces are fully adequate to fit on a Web platform.
What's a full inventory of the workflow?
The process is split in five steps, and the sequence is basically running:
Step One: Apply Tags and Create Asset Records
Determines the range and classification of assets to be counted. Newly acquired or existing assets are labelled with RFID labels, each with a unique number. The following is used: Metal surfaces must be marked with anti-metallic labels, ordinary plastics or wooden casings can be attached directly. It is recommended that small batch tests be made, reading distance measured, large quantities constructed, otherwise it will not be read in any corner until you have been online, and the cost of returning work is high.
Step Two: Create and Assign Inventory Tasks
The manager screens the intended target by warehouse, floor or asset class in the backstage and generates a task list. The task is pushed to the handheld terminal of the inventory operator via WiFi or 4G, with the number of pallets, target areas and lines of operation shown on the terminal screen.
Step three: On-site scanning for collection
The counter moves along the shelf or area, pressing the scan key, and the end will read the label in bulk (details determined by the label and reader power) within 2-8 metres. Read the number, timetamping is on the terminal.
Step 4: Send back the data and reconcile it
The end is automatically connected after the scan is completed, and the data collected is sent back to the back. Matching the backstage with the asset database, output three results: it's on the account and cleaned (normal), it's on the account but not (suspecting abnormal), it's not on the account but it's done (new or misrecorded).
Step Five: Recount and Resolve Discrepancies
Inventory staff recheck exceptions to see whether assets are actually missing or were simply missed because of the scan angle. They record the results in the system, which produces a complete report. A count in the thousands can usually be completed in half a day from start to finish.
How do you choose the label? How can it be difficult to put a sticker?
The selection is based on three things:
- Operating Frequency• Priority is given to UHF (860-960 MHz), which reads distance, supports mass identification and is suitable for warehousing and asset inventory scenarios.
- Tab FormLow cost of paper-free glue labels, plastic or wood surfaces; anti-metallic labels containing suction material, specializing in the case of cabinets, servers and metal casings.
- Encapsulated Level: Outdoor or industrial environment recommends the dust-proofing level of IP67 and above, with an interior general label.
The position will also be standardized: avoid metal stitches and screws, and the same type of asset is attached to a fixed position (e.g. server is placed on the upper left side). This allows for a uniform view of the handheld when taking an inventory, with a rate of error of less than 1 per cent.
What is the practical experience of holding a hand-held terminal count?
A few easy details:
- The handheld is moving at a speed of 1 - 1.5 metres per second, which is too fast to read.
- A shelf-intensive warehouse is recommended to remain for 1-2 seconds every 3-5 rows, giving the label a full response time.
- The same area was twice cleared for cross-checking, which was significantly higher than the accuracy of a single scan.
- In the case of a metal shelf in the environment that is dense or has liquid containers (which absorbs radio frequency signals), field tests and batch labelling are performed in advance.
Fixed points such as warehouse entrances are suitable for fixed-formulators: automatic recording of assets in and out, ready to be reconciled with inventory data, no longer required manual machine inspections.
How do data match ERP, financial systems?
Three types of docking are common:
- Databases are directly linkedA list of the assets of ERP directly read and write down, with a small amount of development, suitable for the scenes of own systems that allow open storage.
- Middle Table plus APIThe inventory system exports the results of the comparison to Excel or sends them to ERP through RET API, which is well developed and accessible to mainstream systems.
- Enterprise Services bus (ESB): Data exchange using intermediates already available in the enterprise, a method commonly used by large groups of IT governance norms.
Clears the map of fields before you go: EPC code corresponds to the asset number in ERP, read at the update date, and count position corresponds to the location where the ERP is stored. The inventory system field is not fully aligned, it is recommended that an intermediate table transition be built first, and that no hard change be made to the main process.
Which pits are common in the project?
From the project re-entry, three types of problems are most frequent:
- The labels and the physical pairs are not well-established.: Sweeping or misnumbering at initial mass, all subsequent data are dirty and after-scave is very hard.
- The site environment was not assessed.(b) A warehouse with a high metal density or radio frequency interference, labeled without field testing, and heavily unreaded during inventory count, forced to return to work.
- Just hold it.The results of the inventory were stopped at the reporting stage and were not linked to the asset acquisition, end-of-life, transfer process and system set-up.
If you keep these three points in order, the system will be used. Shanghai-based Zeitung Technology Co. will normally include them as pre-screens when the project landes, so that it does not find that basic data or the field environment are in question.
The value of the RFID asset inventory system is not so much new as whether it can really be matched with a routine management process. It is a model that identifies the field environment, builds a strong relationship between labels and physical objects when deployed, runs the process smoothly, and stabilizes the human cost of the inventory, rather than eats ash on the line for a while.

Ms. Lei
Mr. Pang