What does full-process management of spare parts include? End-to-end management resolution
RFID Knowledge

What does full-process management of spare parts include? End-to-end management resolution

PublishedShanghai Zejie Smart Technology Co., Ltd.

Many people understand the spare parts management as "the amount of goods in the warehouse," but end-to-end management also has to answer: what is it, when to replenish, how to receive and receive and receive, and how to process idle or obsolete materials. It covers needs identification, planned procurement, storage in storage, lead maintenance, stock optimization and disposal, with the goal of providing adequate spare parts when equipment is needed, while controlling the risk of inventory and shutdown.

Management scope starts with equipment requirements, not with warehouses

The spare parts are materials for equipment repair, maintenance or failure. The starting point for full process management is to convert the equipment structure, operation and maintenance strategy into an implementable material requirement. Only by historical lead volume is it available, which leaves key items that are less frequent but have a significant impact on the downtime; only by equipment list, may create long-term unused stocks.

When actually combing, a uniform archive can be created for each material, the name of the record, the specification model, the equipment applicable, the unit of measure, the supply period, the conditions of storage and the relationship of substitution, and associated with the device's bit number or component. Combined with maintenance records, maintenance plans, failure consequences and procurement cycle, distinguishing between common use items, key items and purchase-on-demand items. The classification here is not fixed labels, which should be reviewed as equipment is modified, malfunction records and supply conditions change.

Demand planning needs to consider both the probability of consumption and the impact of a stoppage.

The core of the replenishment plan is not to increase stocks, but rather to balance the risk of missing goods and the use of funds. It is common to set a minimum stock, with a maximum stock or reordering point: When the available inventory is below the trigger value, the system or manager initiates the replenishment. The trigger value refers to average consumption, procurement lead times and fluctuations in demand; key spare parts with low frequency, high impact, and to a determination as to whether they need to be retained in combination with the consequences of failure and alternative options.

For example, the regular seals at a plant are more stable per month and can be supplemented by rules based on recent intakes and procurement cycles; specialized control modules may not be used for many years, but once damage affects critical equipment, their recovery cycle should be assessed, with replacements available and stoppages affecting them, which cannot be considered only by historical consumption. Specific inventory parameters should be derived from enterprise data, periodic review of changes in the procurement cycle, and after inactive stock and missing stock records have been adjusted.

Procurement and warehousing needs to be implemented to "buy-back" for acceptance

The request for procurement should be accompanied by a clear material code, specifications, quantity, application of equipment and demand dates, avoiding proximity of names but not matching interfaces, materials or performance. The request for quotations, approval, purchase orders, change of delivery and arrival information will also be recorded in the procurement process to enable the demand department to determine whether spare parts are on time for maintenance plans.

Upon arrival, the warehouse shall be of a type checked for procurement information, quantity, appearance and necessary quality documentation; material for which there is a warranty period, batch or special storage requirement, record lot numbers, validity periods and conditions of storage. Material that does not match acceptances should be isolated and kept in processing records, and eligible materials should be re-mounted to the level of the warehouse. Shanghai-based Scientific Co. Ltd. will encode the material, equipment connection and receipt records as basic data priorities, and reduce the point at which subsequent searches and retroactive information are broken.

Storage and access records determine the credibility of inventory data

Inventory is only available in physical terms, and replenishment and maintenance decisions are justified. The operation of entering, moving, taking, withdrawing, and scrapping should be registered in a timely manner, and the operator, time, quantity and use should be retained. Maintenance packages should best relate to worksheets or equipment, so that the replacement frequency and maintenance costs of a component can be reread.

Storage management is to match the material characteristics: materials with validity are managed on a first-come, first-served basis; materials that are vulnerable to tides, electrostatic or temperature effects are stored as required; large and high-value spare parts should have clear storage and access approval. The inventory count can be arranged by risk and value layer, identifying discrepancies in the accounts, mislabelling, damage or unit conversion issues, and then amending data and processes instead of adjusting only the number of books.

Recover, repair and exit to allow the process to cover the entire material life cycle

Unused spare parts should be checked for packing, condition and conditions applied; repossessable items should be recorded for repair, testing, restoration and re-entry; materials that are no longer applicable, beyond their validity or unrepairable material will be disposed of in accordance with the approval process and updated with information on the correlation between inventory and equipment. For reparable items, the repairable items should also be compared to the new purchase cycle and judged whether they meet the next maintenance needs.

End-to-end management also requires ongoing review of indicators such as the number of missing items, the proportion of emergency procurement, inventory turnover, long-outstanding material amounts and account differences. The indicator should be explained in conjunction with the importance and production characteristics of equipment, and cannot be managed by a single high or low level of stock. Enterprises can start with critical equipment and high-value spare parts, first by harmonizing material files and access to the warehouse records, then gradually refining demand plans, maintaining linkages and stagnating disposal rules.

The whole process of spare parts management, which essentially allows every material to be generated from demand to exit, has a clear basis, status and record. Linking equipment, materials and maintenance activities, then correcting the actual consumption and shortage plan, will reduce duplication and inefficient inventory while responding to maintenance needs.