What are the standards for the management of spare parts storage? Environment and security
The standards usually cover both environmental control, fire and electrical safety, hazardous materials segregation, access to the warehouse operations and routine inspections, and determine specific parameters for spare parts material, storage requirements and storage risk. The temperature and humidity values should be based on material description, applicable specifications and field conditions, and it is not appropriate to apply the same standard to all warehouses.
Environmental standard: Control of humidity and cleaning by spare parts characteristics
The core of the environmental management of storage is to reduce the tide, rust, ageing, pollution and change in performance. Metals should focus on the protection of the tide, the protection of the condensation; rubber and seals should avoid high temperatures, sun and exposure to oil; electrons should be based on product descriptions to control temperature humidity and take static measures. The conditions for the preservation of different materials may differ, and storage rooms should be labelled as material, which is the subject of technical documents or manufacturer's description.
The day-to-day management can set up a thermo-humidometer and record readings, while checking whether the walls, roofs, doors, windows and pipes are leaking. The goods should not be dropped directly or against the wall, they should use facilities such as shelves, palletes and other facilities, and leave room for inspection and passage. For vulnerable tidal materials, sealed packaging or drying agents may be used; when sealed, remarked and resealed.
Safety standards: separate management of fire, electricity and material risks
Fire management should ensure that the evacuation route, fire-fighting facilities and distribution areas are not blocked by cargo, fire-fighting equipment is configured and regularly inspected.
When you move heavy loads, use suitable tools and shelves, control a single layer of loads, and avoid overheating; when electrical equipment and circuits are damaged, overheated or infatuated, you shall cease to use and arrange for inspection.
Operational standards: retroactive for incoming, outgoing, inventory and unusual processing
The environmental and safety requirements need to be implemented in each operation. The name, specification, quantity, packaging status and storage conditions are checked when the spare parts are in stock; post-deposit post-entry displaying repository and batch information. The release of the warehouse is performed on an advanced first-come, or material-keeping basis, unseque, removed, returned to the library, etc. The records are updated simultaneously. For spare parts with a warranty period or regular maintenance requirement, a review date should be set to avoid failure after long storage.
Shanghai Select Technology Ltd., when combing the storage house management requirements, will place material properties, field facilities and operating processes together: for example, first identify which spare parts are afraid of tide or static power, then check their packaging, store areas and check whether records match each other. The store manager can check the path, doors and windows, temperature and humidity, fire protection facilities and abnormal materials in shifts, and record the time of discovery, process measures and review results.
Standard landing: classification before the searchable requirements
The standard for storage should be developed by establishing a list of categories of spare parts, registering each item of storage conditions, risk characteristics and retention periods; then putting the requirements into area markings, equipment configurations, operational steps and checklists. The criteria should be written as items that can be verified on-site, such as “the recording of temperature humidity in accordance with material requirements” “the maintenance of a clear fire escape” “timely isolation and registration” of broken packagings, avoiding writing only “strengthen management”. Periodically reviewing material descriptions, changes and unusual records of the warehouse, adjusting storage patterns or inspecting projects where necessary.

Ms. Lei
Mr. Pang