Type of handheld terminal equipment, parameter configuration and procurement acceptance resolution
RFID Knowledge

Type of handheld terminal equipment, parameter configuration and procurement acceptance resolution

PublishedShanghai Zejie Smart Technology Co., Ltd.

I. Three categories according to the use scene, with no rush to look at parameters

Handheld terminals are classified in a number of ways, by operating system, by form, by function. We are more used to pressing first when we do projects.Use intensity and sceneThe three categories are the first step in the selection and a prerequisite for clear presentation of procurement lists.

1. Portable Data Collection Terminal

The weight is usually between 200 and 400 grams, with a screen of about 4 inches, without a telephone function and relatively low price.Light Scanning scenesFor example, the inventory of clothing stores and price tag checks for retail shops.

2. Industrial PDA

The weight is 300 to 600 grams, screen 4.7 to 6 inches, supporting 4G or Wi-Fi, usually with a handle or a backpack that can drop at 1.5 meters, and the IP level (Ingress Protection, the dustproof waterproofing of the equipment's shell) is generally above IP65.Main machine type of storage logistics, manufacturing site, with high scanning volume, harsh conditions, and strict reliability requirements. Industrial PDAs have accounted for more than 80% of units in our warehouse projects.

3. RFID reading and writing terminals

The form is close to the industrial PDA, but it has an RFID module (a technology that automatically identifies label information by radio frequency signal, divided into low-frequency, high-frequency, UHF-high-frequency categories) and allows for reading of electronic tags in bulk at a certain distance. It is often used for clothing count, fixed asset management, warehouse access batch checking, several times to ten times more efficient than single-gauge sweeps. The price is 30% above the cost of the same-file PDF, because the RFID module itself is not less expensive.

And two, how do core parameters fit in?

The list of parameters appears complex, and most projects actually require decision-making.

1. Processors and memory

A quad-core processor and 4 GB of RAM are enough for scanning and data entry. For a WMS (warehouse management system) client plus camera-based barcode recognition, use eight cores and at least 6 GB to prevent slowdowns during peaks. Start with 64 GB of storage,128GB is more secure., because of the accumulation of cache images and offline data from field operations.

2. Scanner engines

This is easy to overlook. Scan engines handle 1D barcodes (conventional linear barcodes) or 2D codes (such as square QR codes). Warehouses mostly use 1D, while manufacturing lines mostly use 2D. They need different engine specifications. Another often overlooked parameter isVisibility of the code and DAM(DPM, Direct Part Mark, a mark directly placed on the surface of materials such as metals), where an average engine falls below 70% recognition in such scenarios and requires a model with a special algorithm.

3. Protection level and continuation

IP65 is the entry line, IP67 is better. But if it's a cold storage or frequent exposure to liquids, IP65 is not enough. For re-departure, batteries can last between 4,500 and 6,000 mm, and continuous sweeps typically last 8-10 hours.The three shifts must be matched with a detached and backup battery.Otherwise, the switch would disrupt the entire operational rhythm.

4. Networks and systems

Wi-Fi 6 is already the mainstream configuration, with 4G modules to see if there are any signal angles on the ground. Android (Android) system version is fast in time and suggests that suppliers that can provide at least three years of system upgrade maintenance should be selected, otherwise later security patches and compatibility problems will be concentrated.

III. The point where the receiving and inspection chain is the easiest to cross over

This paragraph is an experience accumulated in the delivery of our multi-year projects and a place where many projects are concentrated on receiving and inspection.

1. Scan recognition rate must be measured on-site

The "ID 99.9%" in the parameter table is basically laboratory data, and actual field exposure to light, oil pollution, bar code printing quality has a significant impact. We've encountered a cooling-storage project where 98% of laboratory testing recognition was found, which fell 85% below 18°C environment, and then changed models.100 times each with real bar codes (including broken, oily, wrinkled)。

2. Drop test cannot be seen only at height

Many projects only test "1.5 meters down" but ignore the surface of the ground - cement, steel, wood, and the rate of fall-down damage.One down on the six and four, ten down.. There have been cases of frequent screen breakup after delivery, as only the altitude is not visible.

3. Software compatibility and interface with business systems

Handheld terminals are interfaced with business systems such as WMS, MES (Manufacturing Export System, Manufacturing Implementation System), ERP (Enterprise Resources Planing, Enterprise Resource Planning System). If the upper-space system was developed a few years ago, there may be problems with compatibility of the new Android version.Let the supplier put the application in a machine and run the whole process with the real business system., much more important than looking at hardware parameters.

IV. PROCUREMENT LISTS AND MATTERS TO BE CLEAR IN THE CONTRACT

This section provides a reminder to colleagues responsible for procurement.

1. Proportion of spare parts reserved

The equipment procurement volume is set at 10 to 15 per cent as a back-up and loss, which is also budgeted for less time than ex post facto replacement.Trial one or two units for at least a month before placing a large order., most of the obvious adaptation problems can be screened.

2. The payment tempo

Do not pay the full amount upfront. A common schedule is 30% upfront, 60% after delivery and acceptance, and 10% when the warranty expires. The warranty is typically specified at 12–24 months,Write whether the mass guarantee is the whole machine or just the main plate.Many of the contracts are vague and have the most late-stage guzzling.

3. Training and documentation

The contract should include a number of training sessions, training materials and the form in which the manual will be provided.A quick-start guide to the graphic versionOn-site operators would be more acceptable.

The selection of the terminal is not a comparison of the argument sheet, but rather a alignment of scenes, parameters, and acceptances. Shanghai-based Chettech found in multi-year project delivery that many seemingly cost-saving options, which ultimately cost more because it ignored receipt and inspection links and after-sales clauses. This step is solid, and it is much more useful than cross-checking the parameter table.