How to manage spare parts life cycles? Replacement and end-of-life controls
RFID Knowledge

How to manage spare parts life cycles? Replacement and end-of-life controls

PublishedShanghai Zejie Smart Technology Co., Ltd.

The core of spare parts life cycle management, which starts with the entry of batches, storage conditions, access and maintenance, and determines whether to continue in use, repair, replace or end-of-life. Replacement cannot be based on only useful life or mere appearance; a basis for retroactive disposal should be established by combining equipment impact, test results and approval records.

What should be the components of the spare parts life cycle that should be managed?

The life cycle usually includes demand and selection, income library, storage maintenance, access to installation, running maintenance, repossession inspection and replacement or end-of-life. Each link should leave a record of at least the name and code of the material, specification model, batch or serial number, date of deposit, place of storage, applicable equipment, state and handler. For which there is an effective period, store spare parts for temperature and humidity requirements or regular maintenance requirements, record the corresponding duration and results of the examination.

The stock position can be classified as “Pilot, Qualified, Stored, under application, Maintenance, Freezing, End of Life” etc. to avoid misdistribution of pending or judged waste material to equipment. Shanghai-based Select Technologies Ltd recommends linking the inventory of materials to the list of equipment: Once spare parts are used or replaced, corresponding equipment is recorded, failure, installation date and departure of old items, follow-up check for actual life cycle and cause of malfunction.

When should spare parts for spare parts be replaced?

The replacement can be judged on three types of signal: the end-of-life or maintenance period specified by the manufacturer; the detection of abnormalities such as wear, crack, corrosion, deformation, insulation, etc.; performance parameters beyond the limits permitted by the equipment, or failure has affected security and stability. For parts with no defined life cycle, the frequency of inspection should be determined in conjunction with the results of the inspection, the operational environment and historical failure record, which is not appropriate for a decision to be made simply "long" or "appearable".

The following sequences of implementation before replacement are possible:

  1. Identification of equipment, bet numbers, specifications and replacement compatibility for spare parts and reconciliation of stock levels.
  2. Recording of failures and detection results; when security risks are involved, the equipment is isolated and overhauled according to site protocols.
  3. Record new batches, installation times, implementers and necessary test run results after installation.
  4. (c) The source and date of the detachment of used pieces of tagged equipment, for inspection, maintenance or end-of-life, to avoid mixing with eligible stocks.

What standards should be used to control the scrap of spare parts?

The basis for end-of-life is technical standards, test findings and management systems, not a single library age. Unrecoverable structural damage, critical sizes are too bad, performance tests are inadequate or safety is not confirmed. If only packaging is broken, surfaces are slightly rusty, etc., the individual with the corresponding responsibility should assess whether cleaning, repair or rechecking cannot be directly equated to end-of-life.

The process should include applications, technical determinations, authorization for approval, account handling and physical isolation. The records should identify the material code, quantity, batch, cause of end-of-life, basis for testing or photograph, approving authority and disposal; the scrap should be marked in time and deducted from available stocks.

How can expired, misused and unsupported end-of-life be reduced?

Regular reconciliation of the billing and physical items, priority checks are being given to those that are nearing their expiry date, long-term unused, storage in abnormal conditions and spare parts that have been returned to the warehouse. For critical equipment spare parts, there may be minimum stock, replenishment cycle and replacement review rules; for long-outstanding stocks, the retention or disposal of materials is decided on a combination of whether the equipment is still operational, compatibility with material and the results of the rechecks. Replacement and end-of-life records should also be reviewed periodically: if the same parts are frequently obsolete earlier, the job must be checked, the type selected, the reason for installation or storage, not just for increasing the inventory.