What about the management of spare parts for sale? Responsive speed and inventory strategy.
RFID Knowledge

What about the management of spare parts for sale? Responsive speed and inventory strategy.

PublishedShanghai Zejie Smart Technology Co., Ltd.

The key to spare parts management is not “more” or “as little as possible”, but a layer of failure, replenishment cycle and demand fluctuations. Key items that are suitable for safe storage are high downages and long procurement cycles; common and easily replenished materials can reduce stocks and supplement them as needed.

Cost comparison: overstocking, or control of occupancy

There are large inventories, with low risk of missing items being shut down, but they may take up funds and storage space, or be held back, obsolete or model changes. Few stocks, less financial pressure, rely more on supply cycles and on field responses. Compare not to purchase unit prices, the costs of purchasing, warehousing, inventory, emergency transport and missing stopovers should be assessed together.

A list can be established by material, which records the amount of recent delivery, the advance of procurement, the unit price, the duration of security and the impact of missing items, distinguishing between key elements, common use and low-frequency. Safe inventory is an additional quantity retained in response to fluctuations in demand or delivery, set in conjunction with fluctuations in demand and time for replenishment; specific thresholds should be adjusted to historical record and downtime risk, so it is not appropriate to apply the same percentage to all materials. Shanghai-based Technology Ltd. may also use such fields as base data when designing management processes, so that inventory decisions are documented.

Effect comparison: pursuing rapid response or improving inventory turnover

The response rate depends not only on whether the warehouse has a stock or not, but also on failure confirmation, location of spare parts, approval for use, distribution from the warehouse and whether the replacement is smooth. It can be recorded separately to check to confirm the spare parts, to confirm the time spent in the vault, to release the warehouse and to measure the waiting time caused by missing items. This shows whether the bottlenecks are inadequate inventory or the process is not aligned.

Applicable scene comparison: which spare parts are suitable for standing

Core components of critical equipment, with long supply cycles and stop opportunities affecting production, are usually suitable for setting standing levels; demand is stable, standard packages for filling are available for lower stock and regularly replenished; low frequency, high price or alternative type components should be judged in conjunction with maintenance programmes, as an alternative to validation and procurement cycles. For example, a warehouse plant can manage the key drivers of delivery equipment separately from generic compaction: the former focuses on the risk of missing stop-off, while the latter focuses on replenishment facilitation and backlogs.

Common pits: stocking does not mean that it can be used in time

Common problems include the discrepancy between book sizes and physical, the mixing of similar models, the failure to withdraw old pieces in time, the absence of a test status for spare parts and the waiting order for emergency access. It is recommended that each spare part be assigned a unique code, with a description of the fit range of equipment, storage positions, stock levels and replacement relationships; that the accounts be reconciled on a regular basis and that responsibility for replenishment after urgent receipt be clarified. The inventory strategy can first have a high impact from the shutdown, the trial of frequent missing materials, the number of monthly double-discounts, turnover and response times, and then adjust the upper and lower limits.