How can the management of spare parts for warehouse supplies be optimized?
RFID Knowledge

How can the management of spare parts for warehouse supplies be optimized?

PublishedShanghai Zejie Smart Technology Co., Ltd.

The most common problem in spare parts management isn't running out of parts. It's finding them. At one equipment repair plant, it took an average of 12-15 minutes to find a part before storage locations, travel paths, and safety stock were organized. Improving both storage locations and workflows shortened search time to 1-2 minutes and cut stocktaking labor in half. Here are six practices Shanghai Zejie Technology Co., Ltd. often recommends for projects like this.

Point 1: Compose the coding of the vault and give each spare one a "door number."

The source of the silos is often too thick: only to the shelf level, not to the specific storage level, and three versions appear in this row. The standard storage code suggests a three-part format - "Zone-Stand-Standing" for example. A-03-02 indicates Shelf 2 of Rack 3 in Area A. With fixed-length alphanumeric codes, new employees can use the code to find the location on their first pass.

The government has also been able to provide a better way of getting the data.Only one type of spare parts per warehouse., mixing SKUs in one location is the source of later problems. The test is simple: a scan should return no more than one SKU (stock keeping unit, meaning a single specification or model). Prioritize separating and reorganizing mixed locations during the slow season.

Point 2: Use ABC classification to organize storage zones, and place fast-moving spare parts in the prime picking zone

The spare parts have "more than good" and "not going back a few times a year" and should be treated differently.

A single adjustment does not involve a major drying up, first pulling out the access records for the last three months and then selecting category A to set them up in isolation so that changes can be seen in the work-efficiency week.

Point 3: U or S, no staff in the barn.

The vault is set, and the pick-up path is wrong and white. The most common problem is "go in through the entrance, go around the corner and exit," but then back to get something, and it's a repeat.

In the exercise, two lines are more stable:

It's in line with WMS.Botts pick.Combine multiple material requisitions from the same time window into a single picking task. Five orders that used to take five trips can often be handled in one or two, typically reducing walking distance by 40%-60%.

Point 4: Secure stocks and validity are digitally alerted, not "when it's useful."

The security stock is set up in a common formula:

Security inventory = average daily consumption x replenishment cycle x safety factor (1.2-1.5)

For example, if a bearing is used at an average rate of three per day, the supplier takes seven days to replenish, and the safety factor is 1.3, set safety stock at 3 × 7 × 1.3 ≈ 28 bearings. The system should alert when stock falls below this level.

For spare parts (seals, grease, filtration cores etc.) with a valid period of time,Three-day alert, 90 days before the effective date, 60 days after 30 days.– To allow a buffer time for procurement to consume or transfer, and to avoid "in case of readyness and expiry".

Point 5: The count is changed from "end of the year" to "cycle."

The biggest problem with a large annual inventory is that the middle-account differences have accumulated over 12 months, and the whole set is problematic and passive.

Recommended for inventoryBlind driveThe inventory officer only gets the number of the place numbers, does not know how many are on the system account, and then the field count is matched by the system. This way the difference is much more real than "look at the book number" and can also force access to the library for accuracy.

Point 6: The job is SOP, so don't let Teacher Fu be the only answer.

If you rely on an old employee to find it with memory, he can easily stop working.

The new person works on a single basis, based on the SOP and one week of duty.

In the six,The coding of the bank and the ABC division are two things that need to be done first.The two steps are done to talk about WMS, and the automation is meaningful. First, you have to put your foundation in place, then go into the system, and not in the opposite order.