How does the RFID asset inventory programme work? Structure and implementation elements
Industry News

How does the RFID asset inventory programme work? Structure and implementation elements

PublishedShanghai Zejie Smart Technology Co., Ltd.

A landing RFID asset inventory program, with four questions answered at its core: What is it, how is it handled, how is the data flowing back? Document structure usually goes on the six parts of "Advance the hardware selection label and coding process design abnormal and closed loop implementation plans." The most easily retrieved is not insufficient technical parameters, but rather the workflow and unusual processing are too general to be implemented in a real scene. We are used to get A to write the status and target values of these four things first, then start writing pens.

Element 1: Specificity of the objectives and asset range for inventory purposes

The first section of the programme does not rush into the RFID rationale, but rather quantifys the scope and target values.

Element 2: Hardware selection must fit the actual scene

The hardware selection is the most easily stacked component of the program, and precisely the section where restraint is most desirable.

The point is "is it stable to read in this scene?"

Element 3: Design pre-design for tag coding and binding rules

The code is the one that many people ignore, but which costs most late-repatriation.

  1. EPC Encoding Structure: EPC Global Common Marking Structure is recommended, with a residual number of digits to facilitate later expansion of sectors, categories, batch fields.
  2. It's a one-size-fits-all.: Each asset corresponds to the only EPC code, the value of which is tied to the fixed asset number and is entered into the enterprise's asset management system desk.
  3. Tab Printing & Posting Location: provide for printing templates, posting positions (shielding from metal masks and high temperature areas), posting direction (general antenna surface is in the reading direction).

This step is not solid and the subsequent count of data cannot be reconciled.

Point 4: Take a look at the work flow and say, "Who does what?"

The process chapter is the soul of the whole scheme. Write away from the empty words "scan first, check again, upload last" and then pull it down to specific actions:

When Shanghai Zejie prepares a plan for a customer, it specifies steps as precisely as “start the handheld readers in Zone A at 9:00 a.m., finish at 9:30, and reconcile the results against the register at 10:00,” so frontline staff can put the plan into practice immediately.

Element 5: Accurate and closed loop mechanisms must be presented in a separate section

The real inventory is a live, missing, stringing, tags, and asset position changes occur almost every day.

The unusual data are to enter the closed circle and cannot be simply stacked in the report, otherwise the count cycle is as long as it is empty.

Element 6: Recommended structure of the programme document

Finally, a direct catalogue skeleton is given for cross-checking:

  1. Project background and inventory target (drinking indicator)
  2. Scope and classification of assets
  3. List of RFID technology selection and equipment
  4. Tag Encoding and Tie Scheme
  5. Inventory of workflows (including roles, time, path)
  6. Unusual processing and data closed loops
  7. System interface (interfacing fields and frequencies with the asset management system, financial systems)
  8. Implementation plan (phased: pilot roll-out full)
  9. Acceptance and inspection standards and training arrangements

After these nine sections, a programme that can be delivered is largely complete.

What time do you finish?

Writes about the RFID asset count program, which is a common three pits: one is that technical parameters are stacked up, but processes and anomalies are over-repeated; two is that labels are not tied to billboards, resulting in an incorrect reconciliation of accounts; and three is that the scheme is written into a product presentation without answering "How to do it." Avoiding these three holes, the scheme goes beyond the grid. Next, it is recommended that a small-scale validation be made with a pilot scene inventory data set, based on actual leakage rates, a long backsliding parameter and process rationality, and then a formal rollup.