What are the manufacturers of asset management systems to choose?
RFID Knowledge

What are the manufacturers of asset management systems to choose?

PublishedShanghai Zejie Smart Technology Co., Ltd.

A factory changed its asset management system a year ago, it had a good book and physical match, could wait for maintenance, redeployment, really running out of these routine processes, not matching the approval nodes to the financial system, and there was a conflict between depreciation calibration and auditing requirements, and then it could only be reversed.

The problem is to look at the reconciliation when choosing -- without looking at the worksheets, depreciation, and the rights-based sub-logic logic. Picking up the manufacturer, how far the technology route determines the system, and adapting it to your business -- see that these two things are clear, there's no going in the direction.

First, we need to know what kind of assets we have and what management needs we need.

The so-called assets, far from the number on the books. A factory that does sophisticated parts, its assets contain machine beds, moulds, in the assembly, preparation and spare parts, each of which has its own billing rules; a company that works as an engineering contractor, whose heavy assets are the project tower hanging, generators, active rooms, management is grouped according to the project.

The selection is preceded by a list of the types of assets that exist, the numerical levels of each category, and what are the core claims for management. Whether they are grouped by department or project, by purpose or by use status. These seemingly trivial classifications directly determine whether the bottom-up data model of the system can sustain subsequent business expansions.

When Shanghai selects technologies are on land, the first step is to combo assets, value measurement, and attribution calibres with the customer’s asset department. This step is solid, so that the subsequent system configuration and reporting do not recur.

Technical route: B/S or C/S, cloud or private deployment

B/S structures (browser/server mode, which allows for the opening of web pages) are deployed quickly and clients are not maintained; C/S structures (client/server model, requiring each computer to be installed) are usually more friendly to the Intranet environment and large data volume. Most manufacturers now have new versions of master push B/S, but this needs to be confirmed separately if there is a significant offline scene or complex local printing requirements.

In terms of deployment, private deployment (systems on your own servers) is suitable for data-sensitive, large-scale organizations; SaaS (online rental, manufacturers help you maintain the server), works fast, has low initial input, but confirms the attribution of data, backup mechanisms and migration paths. Mixed clouds (some local data, some cloudy) have increased over the years, provided that your network conditions and compliance requirements permit.

One easy one is to ignore: the system is a low-code/code-generated platform, or fully hand-made. The advantage of a low-code platform (by dragging and draging components, configuration parameters can be built with functionality, without much code writing) is that it is fast-adjusted, cost-controlled, but has an upper limit on the expression of complex business logic. Pure customization is developed flexibly, and it is possible to count in the iterative speed and subsequent maintenance costs. Ask this route, it is equal to seeing how much the plant is willing to invest in your scene.

Adaptive capacity: can we follow business changes

Asset management is not a static billboard, it's a chain of purchases, warehousing, finance, equipment maintenance, auditing multiple lines. The system can access your existing ERP (enterprise resource planning system, procurement, sales, inventory, etc.), MES (manufacturing implementation system, workshop production execution), and data can flow in two directions more important than the system itself has many flair functions.

- What are you doing?

Once stuck, the points are very passive. We've seen a client get stuck in the project on a little thing like "assets card fields can't go up" and it's been going on for half a month.

Landing, a few direct verifications of the plant's movements.

See the POC (Proof of Concept), run the system over a small range with your real business data. Bring out one or two of your most critical scenarios -- like asset additions, redeployments, depreciation calculations -- and take the real data. Watch the plant's speed of response, deploy flexibility, problem is zero.

The question is more worthwhile after the sale than when it comes to sales: whether the response time is hourly or daily, how much the secondary development is charged, and whether system upgrades are compatible with the original data. These terms are written in a contract that is far more useful than an oral commitment.

When looking at peer cases, it is best to get a dissensitized account for the nearest industry, how they allocate asset classification and define approval streams. The number of cases does not match your level of activity.

The selection is a trade-off.

The real estate system has no standard answer, and the key is to think about what we have, how we want to do it, how we want to do it, how we want to do it, and then we'll match the technology with the adaptive. Technology routes determine the ceiling, and the adaptor's ability determines the landing speed, and neither can be lost.

A practical first step: spend one week documenting internal requirements, current workflows, and expansion plans for the next year or two. Take that list to vendor demos and proof-of-concept tests. Only solutions that meet around 80% of the list are worth taking into negotiations.