How does the manufacturing fixed asset management system land?
At the end of last year, a factory that did auto parts performed an annual fixed asset inventory, and the Finance and Equipment Section had a book listing and physical check, which was not matched -- it had "in workshop A" on the books, and the items were in workshop B; the packaging was more disproportionate, some were registered in maintenance areas, some were in the field, some were registered as foreign processing plants, and the book value was still three years ago, but the actual status was not right. Last CD point took three weeks, with the difference exceeding 15 per cent, and the audit opinion went to "retention."
This is a common situation in manufacturing. Equipment will be borrowed, maintained, converted, permanently away from its original location; the life cycle of the clothing will be shorter, and the re-engineering sessions will be obsolete, with little real change in book value. To solve this problem, it is almost impossible to do an Excel account, and the core value of fixed asset management systems is to turn "human search" into "data search."
From a one-time inventory, how much difference between book and physical is?
The problem is not that the equipment has been lost, but the information has not kept up. The equipment section is concerned with whether the equipment is working, when it is being maintained, where the maintenance records are; the financial concern is the original value, net value, depreciation or not; the production workshop is concerned about whether the work is fit enough and who has it now. Each side keeps its own account, and the asset card is filled in the filing cabinet, and nobody maintains it.
A precision machining company used to manage over 2,000 machines and nearly 10,000 tools and fixtures in Excel. Updating the register alone took two clerks most of a week each month. Tooling was the biggest headache. The mold department had repaired one fixture set twice and changed its value three times, but the books still showed the original price. Switching to scanned inventory revealed over 200 discrepancies in one month alone, more than 60% involving value.
First step of the system landing: clarify the main data
The first thing before any fixed asset management system goes online is the building-in data. The primary data is not a simple list of devices, but a card that links "funds" to "use" three parties.
For equipment, a master data card must contain at least: Equipment number (sole code, suggested bar code or RFID radio frequency tag, i.e. electronic labels that are automatically identified without manual sweep), Name specification type, workshop to which the user department, custodian, date of acquisition, original value, accumulated depreciation, net value, state (used/unoccupied/maintenance/recessed) coordinates, position coordinates. For work-load, more detail is required because the assembly session is modified, and it is recommended that: Work-manufacturing numbers, corresponding product or sequence, number of maintenance, last repair date, current value, life limit (such as maximum number of push-overs for crushing the emulator).
There's one easy point to ignore: code rules must be fixed before the system goes online. I've seen a lot of companies run for some time and change their codes, and all historical data is misdirected. The code suggests that the principle of "one size, one size for one object" be followed, and that equipment be used with a large-class water-spill (e.g. SB-0001 for device class 1) and that the assembly be used to add a serial number to the process (e.g. CX-M01-0001 for a process-type), which cannot be changed as soon as it is determined.
The equipment and the assembly. The management logic is to be designed separately.
Many people mix their work and equipment with systems, which is a common error. The life cycle of the equipment is "years" level, with emphasis on depreciation, maintenance plans and state changes; the life cycle of the clothing may be only months to one or two years, with emphasis on access, return, number of repairs and life warning.
Equipment managementThe core process is: Repository registration – assigned to the workshop – Daily spot checks (by cycle, e.g. weekly or monthly) Maintenance worksheets – depreciation and depreciation basis – end-of-life disposal. Each node corresponds to financial vouchers and audit requirements, and processes are relatively fixed.
Clothing managementfollows this workflow: receive into stock → issue (scan it out to a workstation) → record use (stamping cycles, press-fit cycles, etc.) → return to stock → request repair → complete repair (update value) → issue again. The key is to accumulate usage and repair counts automatically and issue alerts at thresholds. For example, if a fixture is rated for 50,000 cycles, the system issues a reminder at 45,000 to prevent a sudden failure from stopping production.
Three steps forward. Don't go in a corner.
Many companies want to put in place one step at a time, and they have all the functionality that is difficult to access and has a strong workforce. Shanghai-based technology usually moves forward in three stages when it helps manufacturing clients land on the system.
Phase I: Main data with coded counts.All equipment and work are first built, coded, and a full inventory is made to clear the differences. This appears simple, but usually takes two or three months because many enterprises have historical accounts that are incomplete and need to be verified on a desk-by-office basis.
Stage 2: Put Core Workflows Into OperationThe equipment management process runs through four processes: lead, spot-check, maintenance and end-of-life; the assembly management runs through the access library, logs of usage, maintenance requests, life alert.
Phase III: financial, MES interface.The depreciation data for the equipment is automatically transmitted to the finance module, and the usage data for the assembly are returned from MES (manufacturing implementation system, simply the workshop production movement and caller systems), asset management and production management are fully fledged. This step is key to maximizing the value of the system, but relies on the solidity of the first two steps of data and processes.
A couple of easy-to-touch pits.
Pipe one: use the system as Excel.The primary data is not maintained, the equipment is borrowed from the user department and is not registered, repaired or updated, and the system quickly becomes a dead water. The solution is that the process must go through the system and not be counted in it.
Pit II: Ignore the first line of operation.Shop-floor workers may find scanning inconvenient and record transactions by hand instead, leaving the system permanently out of date. Make scans quick, keep terminals next to the workstations, and ensure the process takes no longer than writing by hand. One plant required seven fields to issue a fixture. Workers switched to paper slips and the system ended up unused.
Pipe III: The value of the clothing is not updated dynamically.The change in the value of the work after major repairs and the percentage of the accumulated maintenance costs above the original value are to be impaired, and there are financial actions that would have been problematic at the time of the audit if the system had not warned.
Pocket Four: Just focus on the equipment and not on the costumes.The small and large amount of the work is not considered worth managing. But, once it is poorly managed, it directly affects production – the workshop has been unable to find a clip and the stale model has suddenly been shut down, resulting in a loss far greater than the value of the work.
What's the result of landing?
A run-through fixed asset management system that can solve at least three things: a consistent accounting, asset traceability, extraordinary early warning. In figures, most of the plants that have completed three stages of landing can reduce the count cycle from three weeks to two or three days, and account differences can be reduced by less than 3 per cent; a fit-life alert can reduce the breakout line by more than half; and an increase in the automation of financial depreciation and audit data will save two to three finance or equipment clerks per month.
The landing of the fixed asset management system is not a one-time IT project, but a continuous process. Primary data are updated with business, processes are fine-tuned on the basis of in situ feedback, early warning thresholds are calibrated with real life data. Run through the frame within one year, create a cycle of continuous optimization within two years, which is more realistic.