How the rfid handheld terminal is verified and the quality line and service system is analysed
RFID Knowledge

How the rfid handheld terminal is verified and the quality line and service system is analysed

PublishedShanghai Zejie Smart Technology Co., Ltd.

Core judgement: cross-validation of three dimensions, one is not possible

The core of the verification of RFID handheld terminals is to cross-check three dimensions: authentic quality documents, autonomous production lines and control, service commitments on paper. Seeing either one of them is easily misleading by surface material, and looking at these three things in the field, the real capabilities of the plant are almost clear.

Point 1: Qualifications - Documentability, patentability, certification retroactive

Check the business license and scope of operations first. Verify that the company is active and how long it has been in business; three years or more is generally a safer bet. Then check product-specific qualifications, such as China's SRRC type approval for radio transmitting equipment. If the terminal has a cellular module, check the network access license as well.

Don't rely only on vendors' patent and software copyright lists. Check each application number in the national public patent search system and see whether the inventors match the published R&D team. The number of invention patents, rather than utility models or designs, and the areas they cover, such as RF front ends, antennas, low-power management, and UHF protocol stacks, are better indicators of real technical capability.

Overseas certification (CE, FCC, RoHS etc.) is subject to certificate number, issuing authority, validity period, and recommends that the manufacturer provide a scanned certificate and allow you to verify it back to the certification body.

Element 2: Production line verification - SMT, assembly, test process for the first-hand view

The production line is the basis for the RFID handheld terminal quality.

If the manufacturer does not have its own radio frequency test laboratory, it relies on external testing only, and there is a higher risk of batch consistency at the production stage.

Point 3: R & D capabilities - people, patents, an iterative rhythm

The ability to develop and develop is a decision on upgrading and customization of the next product.

Element 4: Quality control - System document + double check confirmation

ISO9001 quality management system certification is the basic threshold, but getting a certificate does not mean that it is in place. The test plant gives the quality person a live talk: from IQC (feed-in) to IPQC (process inspection), OQC (off-site inspection) specific check rates, to analysis and backtracking of the bad.

More directly, the manufacturer is required to provide a batch of prenatal test reports - reading and writing distance, battery circulation life, key lifetime (generally over 1 million) and Type-C interface plugged (generally over 10,000). If you want to take a spot test, your credibility will be much higher.

Element 5: Service systems — response time limits, SDK, solidware upgrades into contracts

The service system is the key to smooth long-term cooperation, and verbal commitments are useless and fall under contractual terms:

When doing the RFID handheld terminal, Shanghai-based technology will write SKK documents, debug Demo, and remote upgrades as hard parts of delivery to avoid multiple sawing at late docking.

Point 6: Field inspection plants - one-time completion line, laboratory, storage

A qualified laboratory suggested that it should be arranged half-day to follow this route: the development of a office area for SMT-based assembly and assembly of line radial RF testing laboratories for ageing and reliability of raw materials and finished products.

Several details are easily ignored but critical: the primary control chip, batteries, and the inventory of screen modules, reflecting supply chain stability; the R & D area is working on project panels that reflect the pace of product planning; and there are long-range samples running in the laboratory (generally requiring a continuous run of more than 72 hours) reflecting real input from product control.

Point 7: Business terms - capacity, period of accounts, confidentiality

Business provisions are most easily ignored, but when the problem arises they protect both parties:

Checklist: one page of paper tape to the factory

Finally, a verification list can be printed directly to the site:

  1. Business licences, SRRCs, Internet access permits (if any), original or searchable number of CE/FCC certificates
  2. Number and brand of SMT-coated stickers, AOI online
  3. Radio frequency test equipment model (GS, network analyser)
  4. Drop tester, IP waterproofing, HLT test box complete
  5. List of research and development personnel and their corresponding duties, patent lists for inventions
  6. The shipment was shipped in 12 months.
  7. SDK version inventory, Demo source code, solidware upgrade mechanism
  8. Response time limits, capacity, period of accounts, quality assurance terms in contract templates

Taking this list over, the real capabilities of the factory are largely on the table.

End: Read people first, then products and terms.

Check the RFID handheld terminal, which says that it's a checker of people, products and services. The data are beautiful, and ultimately the sales or engineers, who understand your business scene in depth, and his familiarity with technical details, often predicts the smoothness of subsequent cooperation more than a charade of certificates. It is suggested to push -- the right person, the line of production, the clear terms, the three things together, the probability of stepping on the pit is much smaller.