How can spare parts be managed efficiently? Reduce inventory and waste
RFID Knowledge

How can spare parts be managed efficiently? Reduce inventory and waste

PublishedShanghai Zejie Smart Technology Co., Ltd.

The management of spare parts for the provision often makes trade-offs between “a little more secure” and “a little less money, less backlogs.” The test is not simply to lower stocks but to distinguish material by impact, procurement cycle and consumption frequency: critical and uncompensable availability, common refilling points, reduced reserves for low-frequency items purchased and regular clean-up of inactive stocks.

Cost comparison: cost of use of inventory funds versus cost of unserviceable stoppages

The cost of the two types should be compared together, rather than looking at the warehouse account amount.

Start by recording annual usage, unit price, procurement lead time, stock level, and the effect of running out for each item. For expensive, seldom-used materials, first assess how critical the equipment is and whether substitutes exist. For inexpensive, frequently used materials, set upper and lower limits based on usage history and replenishment time. For example, if a part is used at four units per month on average and takes two months to obtain, start with a reorder point of about eight units and adjust for demand variability and delivery reliability. This is a calculation example, not a universal standard.

When you're doing the spare parts management process, Shanghai-based Technology will reconcile inventory levels with downside risks, avoiding targeting only “the lower the better.” Enterprises can start with high amounts, long unused or critical equipment material, and review each item.

Impact comparison: harmonized inventory and classification strategy

All spare parts are implemented with the same set of inventory standards, which are simple but easily leave a backlog of common-use items and low-frequency items. Categorizing them by materiality, consumption patterns and procurement cycle, makes it easier to focus management efforts on higher-risk materials.

The effects are continuously tested through indicators. Monthly observations of stock turnover, number of missing items, inactive amounts and emergency purchases are available; if the stock is reduced but the stoppage is awaiting increase, the adjustment is too large to be considered for the safe inventory and procurement cycle of key materials.

Applicable scene comparison: centralized control and field-based flexible reserve

The equipment model is uniform, the storage is centralized, the demand is more stable, it is suitable for a uniform code, centralized purchasing and centralization of inventory parameters. Multi-plant areas or enterprises with large equipment differences can be harmonized, but the necessary flexible reserves are maintained on site in accordance with maintenance needs.

Small-scale factories can first manage by form, at least maintaining material code, name, applicable equipment, existing quantities, minimum inventory, procurement cycle, most recently taken-over date and responsible person. When materials are of a variety, over-ware transfer is frequent, then consider the early warning and recording that will be carried by the inventory system. Either tool, enter, access, return to and scrap should be registered in time, otherwise the number of systems is easily different from the physical.

Common pits: value, ignore data quality and disposal mechanisms only

When you actually move, you can select a warehouse or type of equipment to be tested: take an inventory of physical differences from the books, complete classification and coding, set replenishment rules, and check missing items and backlog changes on a monthly basis. The focus of stock control is to give each spare part clear reasons for stockpiling and exits, rather than simply seeking to reduce the number.