What about the management of spare parts storage? Marking, billboards and inventory
RFID Knowledge

What about the management of spare parts storage? Marking, billboards and inventory

PublishedShanghai Zejie Smart Technology Co., Ltd.

The key to regulating the spare parts warehouse is that each item of material “is found, reconciled and discovered when replaced”. This applies to warehouses with more items, frequent access or greater impact. This is done by harmonizing marking rules, keeping a desk account for the receipt and delivery process and scheduling inventory counts according to risk and turnover; and tracking reasons and leaving marks on discrepancies.

Rediscretion marking: first, to resolve “where the material is placed and whether it is taken”

The label is not just a name label, but also a material, storage and status matching. It is suggested that the only code for each material should be a label, at least a name of the material, an code, a specification model, a unit of measure; if there is a batch management requirement, then a number of batches or production dates should be indicated. The shelf and storage is used in a separate repository code to avoid the different layers of the same shelf being described only orally.

The label should be consistent with the name and unit used for the procurement, receipt and inventory records. For example, a desk account is measured as “one” and not a “set” on site; one is used as a “box”; if the packaging unit differs from the stock unit, the conversion relationship should be clearly defined. To be checked, qualified, to be repaired, scrap, etc., it needs to be separated or clearly marked, avoiding failure to confirm that the material was mistook. Shanghai-based Technology Ltd. will also place the code, the location of the bank and the status identifier in the same reconciliation logic, reducing the possibility of on-site search and error.

Rewinding of desk accounts: each inventory change must be recorded in a reciprocable manner

The account records at least the material code, name specification, warehouse position, opening number, number of vaults, quantity of deposits, number of documents, number of documents, operator and date. Checking the physical, purchase or transfer documents and specifications when you receive them; dispatching the materials is registered for use on the basis of a receipt, number and recipient. Refund, loan, assignment, end-of-life should also be recorded separately, not to be charged only to the total at the end of month.

The daily operations are performed in the order of "Assign or confirm, register, post-emplacement or delivery" when the material is found to be inconsistent with the documents, it is first isolated from nuclear materials, and the specifications, quantities and sources are identified before the records are updated. The minimum stock or recharge point is based on actual consumption, the procurement cycle and equipment shutdown impact set, and periodically reviewed; if historical data are not available, access for a certain period of time can be recorded and adjusted accordingly, it is not appropriate to apply the uniform values directly.

Reassembly count: treat differences as a thread of problem rather than just a change in the bill

The inventory is subject to a schedule of counts by material value, frequency and impact by default: high value, increased frequency of verification of spare parts for critical equipment and frequent receipt of items, scheduled rotation of low-frequency items; the specific cycle is determined by stock size and management capacity. The count is suspended or operations during the inventory are clearly recorded, item by item, coding, storage position, unit and physical quantity. Differences are detected first, then the records of recent receipts and outgoings are checked, misplaced, units converted and not recorded in time, adjusted volume and processed records are maintained after approval.

The following are the criteria for the selection of a storage area: fill up tags and store-space codes, harmonize receipt and dispatch records, and revise operational requirements for reasons of variance.