How does the asset management software programme work? Functional and cost-balancing analysis
Start with a roller-down.
At the end of last year, a factory that did the exact parts was running its year-end inventory, and it took two weeks to check the accounts alone, and it turned out that three forklifts were missing, and that two measuring machines had been written "in" and "in fact" foreclosed. Then one of the reasons was mainly that Excel's watch had not been updated for so long, and nobody really counted it on the scene.
This is a common scenario, and it is the starting point for businesses to start looking at asset management software. The core logic of the selection is three steps: first, to identify the three or five issues that they want to solve most, then to see if the functionality matches, and finally to calculate the total cost of ownership (TCO, from procurement to long-term use).
Don't look at the function.
Software manufacturers often have a full set of functions when presenting their products. But for a really selective enterprise, the first step should be to put in place a list of issues, such as: long time taken to take an inventory, data is not available; equipment location cannot be traced, idle rates cannot be measured; depreciation calibration is confusing, not matching the financials; assets are used, returned, end-of-life processes are not digitally marked; and data is ad hoc collage when audited or checked by superiors.
Once the list of issues is up, then you can check the software functionality. There is a simple way to judge: if there are three items on the list that are directly solvenable by software, it's more compatible; if only one is solved directly, the others will have to be developed twice (i.e., customised with the enterprise's own process), then carefully evaluate the cost and cycle of implementation.
The five functions have to be verified one by one.
The asset management software will not be able to fit the five core modules, regardless of the vendor’s packaging.
I. Asset register and bar code/RFID management
See if it is easy to import a lot, whether the print of bar code or RFID label (RFID i.e. radio frequency recognition, electronic tag on an asset by radio signal) supports a common type printer, and if you can quickly scan a mobile phone or handheld terminal after the sticker.
II. Inventory process
When you take a physical inventory, is the software able to support offline operations (and scan records in unnetworked warehouses), and whether the results can be automatically compared with system desk accounts, how the data differ. The offline is critical, and many warehouse network conditions are not good.
III. Depreciation
Finance usually requires monthly depreciation, software that supports the main algorithms (specifically as required by enterprise accounting standards) such as straight-line, double-balance reduction, year-number sum and so forth, and is able to reconcile with the general ledger.
IV. REPORT AND DATA EXPORT
In addition to the vendor’s pre-set statements, the flexibility of the custom statement is also considered.
V. REPRESENTATIONS AND APPROVAL TRENDS
The need for approval of the adoption, transfer and end-of-life of assets, and the ability to move the nodes in a flexible manner by sector and by amount, is often underestimated but the poor process is the most important factor influencing the will to use them.
Not just the offer. These are more hidden costs.
Many enterprises choose to look only at software offers, and the result is that they find implementation costs more expensive than software.
| Cost item | Common composition | Easy to ignore. |
| Software licences | By number of users, by number of assets or by module | SaaS (subscription by year) mode to check the increase in the second year of the fee |
| Implementation services | Needs research, configuration, training and online mentoring | This part of the complex project may exceed the cost of the software itself. |
| Hardware Compassion | Barcode printer, handheld terminal, RFID tag | The RFID tag and the reader input is not too small |
| Transport peacekeeping upgrade | Fixed rate or one-time buyout per year | Additional fees for upgrades of versions |
The other one is easily ignored: the internal manpower costs. During the go-live, business units need to work with the test, inventory, and rerecord historical data, which is not much of a translation.
I'm gonna use these three ways to figure out what's going on.
The manufacturer's presentation is often done with well-prepared sample data, which seems to be very good. But it's the real scene that counts.
First, real data are required to be tested.At least one department or line of production is selected, and the first two to three months are run to see if the data flow is actually going to work, and the process is going well.
Second, field visits to clients of the same size.Ask the manufacturer for two or three customers close to your assets and industry, it would be useful if he could come in and see what they've actually done, including what pits they've stepped on.
Thirdly, it depends on the stability of the implementation team.It is difficult to ensure the quality of project delivery when some vendors are very strong in sales, but the implementation is outsourced.
Five hundred and fifty thousand, not the same plan.
The common error in selecting a type is "one step in place". But the complexity of asset management software is related to the number of assets, their geographical extent and the high level of industry attributes.
- Assets are located in fewer than 500 single office space: light-weight SaaS tools will be met, with a focus on quick start and low cost.
- Between 500 and 5,000 branches: mobile inventories, cross-organizational clearances are required to be supported, and access to existing ERP (enterprise resource planning system) or financial systems is possible.
- More than 5,000, multi-business, cross-geographical: in addition to basic functions, consideration should be given to performance, co-production (multi-user simultaneous) support, data security and the need for integration with the Internet platform.
Programmes vary widely. Small and medium-sized enterprises with limited budgets do not have to go on heavy platforms; they are over the medium scale, and they can barely survive using Excel plus manual capacity.
When Shanghai-based Stygian Technologies Ltd. offers its programmes to clients, it usually does a mapping of the current status of assets and recommends an appropriate product mix in conjunction with the client ' s expansion plan for the next two to three years, so as not to buy too much or enough at first.
The choice is a question of judgment.
Asset management software does not have a standard answer, but there is a clear logic of judgement: the total cost of matching the list of issues with functional capability is a field test of scale and growth. The five steps are solid and the programme is naturally clear.
And three specific recommendations were made: one is not to be taken away from the list of functions, go back to their own list of issues; two is to be asked for a total price that includes implementation, not just for software fees; and three is to be tested on a small scale, and then see if it works. To do this, most enterprises can find a solution that suits themselves.

Ms. Lei
Mr. Pang