How does the asset management platform work?
RFID Knowledge

How does the asset management platform work?

PublishedShanghai Zejie Smart Technology Co., Ltd.

The first misunderstanding of many people about asset management is that it's equivalent to a list of equipment.

The list of equipment is made up of Excel, and the amount and location are handled, which is the most common misunderstanding before the asset management platform was set up. The assets in the enterprise are much more than just equipment -- production equipment, office computers, off-site instruments, inventory spare parts, even SaaS accounts on staff. Once each department uses a single form, at the end of the year inventory counting, the same device appears in three systems, data are not available, and problems arise.

The key to a real asset is to build one.Business Centre + Mobile-end synergyThe system: the middle office is responsible for defining the language and flow rules of assets, while the mobile end is responsible for implementing them under various conditions on the ground. The following is a hierarchy that gradually disintegrates the principles behind the system.

What exactly is the role of Operations Centre in the asset management system?

The middle of business can be understood as one.Shared service centresIt does not directly confront operational personnel, but all business systems are required to read and write asset data through it. The middle station has the rules enclosed internally and only exposed the standard interfaces to the outside world so that no new data isolation will be created between the business systems.

Specifically, the centre should have four core categories of competencies:Harmonization of asset codes, uniform state flow, harmonized value accounting and harmonized allocation of authority。

When Shanghai's technology works with manufacturing companies as an asset platform, the most common problem is that China has only assembled data, not harmonized rules, and then become a data porter, and business has to synchronize them manually. The real Chinese are also sealed in, and whoever adjusts the asset data must go through the defined process.

Why isn't the moving end a subsidiary to the center?

The "small screen" view of the mobile end as medium is another high-frequency misunderstanding when building an asset platform.

In the real scene of asset management, a significant proportion of operations took place on site: warehouse manager's scrutinizing of the disk, maintenance master's access to the equipment for photo recording and inspection staff's mobile phone identification of points.First lineThe PC end is actually for backstage analysis.

Thus, the relationship between the mobile end and the medium stage is synergetic rather than subordinate, and is reflected at three levels:

Data Synchronization: seamless connection online and offline

The network is restored, the incremental data are automatically synchronized to the medium stage to avoid duplication or loss.

Task distribution: mid-level push to man

The check-ups, maintenance and inspection missions are sent to the person concerned according to the status of the assets and their location.

Identity and equipment binding: who operated it, which equipment

Each operation at the moving end is tied to a specific person, specific asset, sweep code + positioning + login account number three elements to ensure that data are traceable.

A few pits that can easily be built.

The first pit is the development of asset classification standards.The definition of "equipment" and "scrutinizer" varies widely from one industry to another, suggesting that the three parties sit down and combe it and then start data modelling.

The second pit is to use the center as a universal connector.. The ERP, EAM, Treasury, IOT platform is to be connected but the cost of later maintenance is higher if it is only data removal and no rule-based sealing is made.

The third pit is a moving end of the system that's more complex than PC.. Cell phone screens are small, operating hours are broken, and the design principle for the mobile side is "one screen dry thing" with no more than five entry buttons. Complex analysis, batch processing, is left to the PC end.

The fourth pit is a test that ignores offline scenes.. Many projects are online only to find frequent end-of-way jams in poor network warehouses, and it is very costly to go back to the offline mechanism.

Four stages from start-up to go online.

Phase I (approximately 2-4 weeks): To combe the range of assets, clarify coding rules, determine the status machine. This is the most critical step and determines the design of all subsequent modules.

Phase II (approximately 4-8 weeks): Construction of the China station core service, which includes asset master data, status engines, permission models, API gateway.

Phase III (approximately 4-6 weeks)Mobile-end development, covering high frequency (HF) scenes such as inventory, maintenance, inspection and access; PC end asset management backstage.

Phase IV (approximately 2-4 weeks)Pilot sector pilot run, feedback-gathering and iterative optimization, then gradually extended to the whole company.

The whole cycle is usually in 3-6 months, depending on the number of assets and complexity of integrations. Manufacturers with more than 10,000 assets should allow six months. A startup managing only office assets can get it working in three months.

What core indicators do you target when you land?

Not just "the system works out."

These indicators are available in the medium and do not require additional statistics, but are crucial for continuous tracking and monthly rediscussion on-line.

Back to the core: building an asset management platform, essentially creating a unified set of asset data language in the enterprise

The middle office is responsible for defining language norms and keeping them on the bottom line, while the mobile end is responsible for using languages under various conditions. The two are well coordinated so that asset management does not become a never-to-be-matched table.

If you are assessing whether or not to start this project, it is suggested that two questions be answered:First, how long does it take to conduct an inventory of assets at this time? What is the difference in the accounts? Second, there are several systems where asset-related data are scattered?The answers to these two questions will help you judge the priority and scale of inputs for building a middle station and moving end.